Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

Aller à Demande

1. WO2021056254 - COLONNE COMBINÉE MODULAIRE FORTEMENT CONTRAINTE ET SON PROCÉDÉ DE CONSTRUCTION

Numéro de publication WO/2021/056254
Date de publication 01.04.2021
N° de la demande internationale PCT/CN2019/107813
Date du dépôt international 25.09.2019
CIB
E04G 11/08 2006.01
ECONSTRUCTIONS FIXES
04BÂTIMENT
GÉCHAFAUDAGES; COFFRES; COFFRAGES; INSTRUMENTS DE MAÇONS OU AUTRE MATÉRIEL ACCESSOIRE POUR LE BÂTIMENT OU LEUR EMPLOI; MANUTENTION DES MATÉRIAUX DE CONSTRUCTION SUR LE CHANTIER; RÉPARATION, DÉMOLITION OU AUTRES TRAVAUX SUR LES BÂTIMENTS CONSTRUITS
11Coffres, coffrages ou faux œuvre pour la fabrication des murs, planchers, plafonds ou toits
06pour murs, p.ex. courbes
08Coffrages devant être totalement démontés après la pose du béton et remontés pour la coulée suivante
B28B 1/14 2006.01
BTECHNIQUES INDUSTRIELLES; TRANSPORTS
28TRAVAIL DU CIMENT, DE L'ARGILE OU DE LA PIERRE
BFAÇONNAGE DE L'ARGILE OU D'AUTRES COMPOSITIONS CÉRAMIQUES, SCORIES OU MÉLANGES CONTENANT DES SUBSTANCES ANALOGUES AU CIMENT, p.ex. DU PLÂTRE
1Fabrication d'objets façonnés à partir du matériau
14par simple coulée, le matériau n'étant ni alimenté sous pression, ni réellement compacté
CPC
B28B 1/14
BPERFORMING OPERATIONS; TRANSPORTING
28WORKING CEMENT, CLAY, OR STONE
BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
1Producing shaped ; prefabricated; articles from the material
14by simple casting, the material being neither forcibly fed nor positively compacted
E04G 11/08
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
11Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
06for walls, e.g. curved ; end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
Déposants
  • 邹胜斌 ZOU, Shengbin [CN]/[CN]
  • 陈仪清 CHEN, Yiqing [CN]/[CN]
Inventeurs
  • 邹胜斌 ZOU, Shengbin
  • 陈仪清 CHEN, Yiqing
Mandataires
  • 重庆蕴博君晟知识产权代理事务所(普通合伙) CHONGQING YUNBOJUNSHENG INTELLECTUAL PROPERTY AGENCY FIRM (GENERAL PARTNERSHIP)
Données relatives à la priorité
Langue de publication chinois (ZH)
Langue de dépôt chinois (ZH)
États désignés
Titre
(EN) MODULAR STRONGLY CONSTRAINED COMBINED COLUMN AND CONSTRUCTION METHOD THEREFOR
(FR) COLONNE COMBINÉE MODULAIRE FORTEMENT CONTRAINTE ET SON PROCÉDÉ DE CONSTRUCTION
(ZH) 模块化强约束组合柱及其建造方法
Abrégé
(EN)
A modular strongly constrained combined column and a construction method therefor. The combined column is formed by stacking several column body modules (1); lattice structures (2) are provided within the column body modules (1); the lattice structures (2) form several through holes (3) in the vertical direction; stressed ribs (4) vertically penetrate the through holes (3); tongue and groove dislocation structures (5) are provided on upper and lower ends of the column body modules (1), respectively; and a filler (6) is filled within the through holes provided with the stressed ribs (4). The construction method comprises forming a combined column by stacking several column body modules (1) layer by layer. Internal enclosure hole duct walls and the outermost outer wall of the combined column have a good constraining effect on the filler, which improves the compression resistance and shear resistance bearing capacity of a column as well as the ductility of the column. By modularizing a traditional reinforced concrete column, mass production is facilitated, the weight is small, and the structure is light; moreover, transportation is convenient and hoisting is simple; no formwork is used on site, construction is simple and easy, and the technical requirements for construction workers are low, while construction efficiency is high; and the column body modules (1) may be produced industrially with high precision, and the appearance of the modules does not require late stage plastering and decoration.
(FR)
L'invention concerne une colonne combinée modulaire fortement contrainte et son procédé de construction. La colonne combinée est formée par empilement de plusieurs modules (1) de corps de colonne ; des structures en treillis (2) sont disposées à l'intérieur des modules (1) de corps de colonne ; les structures en treillis (2) forment plusieurs trous traversants (3) dans le sens vertical ; des nervures contraintes (4) pénètrent verticalement dans les trous traversants (3) ; des structures de dislocation (5) à languette et rainure sont disposées sur les extrémités supérieure et inférieure des modules (1) de corps de colonne, respectivement ; et une charge (6) est introduite à l'intérieur des trous traversants pourvus des nervures contraintes (4). Le procédé de construction consiste à former une colonne combinée par empilement de plusieurs modules (1) de corps de colonne couche par couche. Les parois de conduit de trou d'enceinte interne et la paroi externe la plus à l'extérieur de la colonne combinée présentent un bon effet de contrainte sur la charge, ce qui améliore la résistance à la compression et la capacité de palier à la résistance au cisaillement d'une colonne ainsi que la ténacité de la colonne. En modularisant une colonne en béton armé classique, la production en masse est facilitée, le poids est faible et la structure est légère ; de plus, le transport est pratique et le levage est simple ; aucun coffrage n'est utilisé sur site, la construction est simple et facile, et les exigences techniques pour les ouvriers en construction sont faibles, tandis que l'efficacité de la construction est élevée ; et les modules (1) de corps de colonne peuvent être produits industriellement avec une précision élevée, et l'aspect des modules ne nécessite pas de décoration et de plâtrage de phase tardive.
(ZH)
一种模块化强约束组合柱及其建造方法,组合柱由若干柱体模块(1)堆叠而成;柱体模块(1)内设置格构结构(2);格构结构(2)在竖向上形成若干通孔(3);在通孔(3)内竖向贯穿有受力筋(4);在柱体模块(1)的上下两端分别设置有企口错位结构(5);在设置有受力筋(4)的通孔内填充有填充剂(6)。所述建造方法通过将若干柱体模块(1)逐层堆叠构成组合柱,组合柱内部围合孔道壁以及最外层的外壁对于填充剂有很好的约束作用,提高柱子的抗压、抗剪承载力和柱子的延性。通过将传统的受力筋混凝土柱模块化,便于大规模生产、自重小、结构轻巧;运输方便、吊装简单;现场免支模,施工简单方便,对于施工人员技术要求低、施工效率高;柱体模块(1)可工业化生产,精度高,模块外表无需后期抹灰装修。
Dernières données bibliographiques dont dispose le Bureau international