Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

Aller à Demande

1. WO2020113870 - PROCÉDÉ DE DRAINAGE D'EAU DE SÉPARATION DE TOIT ET D'EXPLOITATION MINIÈRE DE GAZ DE FORMATION HOUILLÈRE COOPÉRATIFS

Numéro de publication WO/2020/113870
Date de publication 11.06.2020
N° de la demande internationale PCT/CN2019/080733
Date du dépôt international 01.04.2019
CIB
E21B 43/00 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
E21F 7/00 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
FDISPOSITIFS DE SÉCURITÉ, TRANSPORT, REMBLAYAGE, SAUVETAGE, VENTILATION OU DRAINAGE DANS LES MINES OU TUNNELS
7Procédés ou dispositifs pour enlever les gaz, avec ou sans utilisation ultérieure de ceux-ci à une fin quelconque
CPC
E21B 43/006
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
006Production of coal-bed methane
E21B 43/305
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
30Specific pattern of wells, e.g. optimizing the spacing of wells
305comprising at least one inclined or horizontal well
E21F 16/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
16Drainage
E21F 7/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
7Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Déposants
  • 中国矿业大学 CHINA UNIVERSITY OF MINING AND TECHNOLOGY [CN]/[CN]
Inventeurs
  • 吴财芳 WU, Caifang
  • 房孝杰 FANG, Xiaojie
  • 刘宁宁 LIU, Ningning
  • 刘小磊 LIU, Xiaolei
  • 张和伟 ZHANG, Hewei
Mandataires
  • 南京正联知识产权代理有限公司 NANJING ZHENGLIAN INTELLECTUAL PROPERTY AGENCY CO., LTD.
Données relatives à la priorité
201811493867.X07.12.2018CN
Langue de publication chinois (ZH)
Langue de dépôt chinois (ZH)
États désignés
Titre
(EN) METHOD FOR COOPERATIVELY DRAINING ROOF SEPARATION WATER AND MINING COAL-MEASURE GAS
(FR) PROCÉDÉ DE DRAINAGE D'EAU DE SÉPARATION DE TOIT ET D'EXPLOITATION MINIÈRE DE GAZ DE FORMATION HOUILLÈRE COOPÉRATIFS
(ZH) 一种顶板离层水与煤系气协同疏排方法
Abrégé
(EN)
A method for cooperatively draining roof separation water and mining a coal-measure gas. The section structure of a coal stratum comprises: a vertical well (1), a horizontal well (2), a horizontal section (3) of the horizontal well, a vertical section (4) of the horizontal well, an inclined section (5) of the horizontal well, a sealing device (6), a goaf (7), a coal seam (8), a curve subsidence zone (9), a working face (10), a hard stratum (11), a soft stratum (12), a separation space (13), and an unmined area (14). Said method comprises the following steps: a stage of only mining coal-measure gas; a stage of synchronously draining water and mining gas; and a stage of only draining roof separation water. Said method combines coal-measure gas mining, coal production, and mine separation water disaster prevention and control, reduces the mash gas content in the coal seam, the working face, the goaf and a roadway during coal stoping so as to reduce the harm from mash gas on mine safe production, and promotes the desorption and production of methane under the effect of coal mining, increases the yield of coal-measure gas, and also controls the separation water in the separation space in the roof of the goaf, so as to prevent the occurrence of a secondary roof separation water disaster.
(FR)
L'invention concerne un procédé de drainage d'eau de séparation de toit et d'exploitation minière de gaz de formation houillère coopératifs. La structure de section d'une strate de houille comprend : un puits vertical (1), un puits horizontal (2), une section horizontale (3) du puits horizontal, une section verticale (4) du puits horizontal, une section inclinée (5) du puits horizontal, un dispositif d'étanchéité (6), un remblai (7), une couche de houille (8), une zone d'affaissement de courbe (9), une face de travail (10), une strate dure (11), une strate souple (12), un espace de séparation (13), et une zone non exploitée (14). Ledit procédé comprend les étapes suivantes : une étape qui comprend uniquement l'exploitation minière du gaz de formation houillère; une étape qui comprend le drainage d'eau et d'exploitation minière de gaz synchrones; et une étape qui comprend uniquement le drainage d'eau de séparation de toit. Ledit procédé combine l'exploitation minière de gaz de formation houillière, la production de houille et la prévention et le contrôle de catastrophe d'eau de séparation de mine, réduit la teneur en gaz de décomposition dans la couche de houille, la face de travail, le remblai et une chaussée durant l'abattage de houille de façon à réduire les problèmes causés par le gaz de décomposition sur la sécurité de la production minière, et favorise la désorption et la production de méthane sous l'effet de l'exploitation minière de houille, augmente le rendement du gaz de formation houillère, et contrôle également l'eau de séparation dans l'espace de séparation dans le toit du remblai, de façon à empêcher la survenue d'une catastrophe d'eau de séparation de toit secondaire.
(ZH)
一种顶板离层水与煤系气协同疏排方法,煤岩层剖面结构包括:直井(1)、水平井(2)、水平井水平段(3)、水平井竖直段(4)、水平井造斜段(5)、密封装置(6)、采空区(7)、煤层(8)、弯曲下沉带(9)、工作面(10)、坚硬岩层(11)、软弱岩层(12)、离层空间(13)、未采区(14),包括以下步骤:单采煤层气阶段;疏水采气同步进行阶段;单疏顶板离层水阶段。该方法将煤系气排采、煤炭生产、矿井离层水害防治相结合,既可以降低煤炭回采时煤层、工作面、采空区和巷道中的瓦斯含量,减轻瓦斯对煤矿安全生产的危害,又可以在煤炭采动的影响下促进甲烷的解吸产出,增大煤系气产量,还可以防治煤矿采空区顶板中离层空间中的离层水,预防次生顶板离层水害事故的发生。
Également publié en tant que
KRKR1020207003125
Dernières données bibliographiques dont dispose le Bureau international