Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

1. WO2007140204 - SYSTÈME ET PROCÉDÉ DE COMMANDE MULTIVARIABLE DANS DES SYSTÈMES DE PRODUCTION DE PÉTROLE ET DE GAZ À SÉPARATION EN TROIS PHASES

Numéro de publication WO/2007/140204
Date de publication 06.12.2007
N° de la demande internationale PCT/US2007/069536
Date du dépôt international 23.05.2007
CIB
E21B 41/00 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
41Matériel ou accessoires non couverts par les groupes E21B15/-E21B40/105
E21B 43/00 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
E21B 43/34 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
34Aménagements pour séparer les matériaux produits par le puits
CPC
E21B 43/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
E21B 43/122
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
121Lifting well fluids
122Gas lift
E21B 43/34
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
34Arrangements for separating materials produced by the well
E21B 43/38
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
34Arrangements for separating materials produced by the well
38in the well
E21B 49/08
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
49Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
08Obtaining fluid samples or testing fluids, in boreholes or wells
Y10T 436/12
YSECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
10TECHNICAL SUBJECTS COVERED BY FORMER USPC
TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
436Chemistry: analytical and immunological testing
12Condition responsive control
Déposants
  • HONEYWELL INTERNATIONAL INC. [US/US]; Law Department AB/2B 101 Columbia Road Morristown, NJ 07962, US (AllExceptUS)
  • COWARD, Brian, A. [GB/GB]; GB (UsOnly)
Inventeurs
  • COWARD, Brian, A.; GB
Mandataires
  • CHESS, Deborah; Honeywell International Inc. Law Department AB/2B 101 Columbia Road Morristown, NJ 07962, US
Données relatives à la priorité
11/441,42925.05.2006US
Langue de publication anglais (EN)
Langue de dépôt anglais (EN)
États désignés
Titre
(EN) SYSTEM AND METHOD FOR MULTIVARIABLE CONTROL IN THREE-PHASE SEPARATION OIL AND GAS PRODUCTION
(FR) SYSTÈME ET PROCÉDÉ DE COMMANDE MULTIVARIABLE DANS DES SYSTÈMES DE PRODUCTION DE PÉTROLE ET DE GAZ À SÉPARATION EN TROIS PHASES
Abrégé
(EN)
A method includes controlling an oil and gas extraction process (304), controlling a production separation process (306), and controlling a de-gassing process (308). The method also includes optimizing the oil and gas extraction process, the production separation process, and the degassing process to optimize at least one process objective (310). The method could further include controlling a lift-gas compression process. The optimizing could include optimizing the lift-gas compression process, the oil and gas extraction process, the production separation process, and the degassing process to optimize the at least one process objective.
(FR)
L'invention concerne un procédé consistant à commander un processus d'extraction de pétrole et de gaz (304), à commander un processus de séparation de produit (306) et à commander un processus de dégazage (308). Le procédé consiste également à optimiser le processus d'extraction de pétrole et de gaz, le processus de séparation de produit et le processus de dégazage en vue de l'optimisation d'au moins un objectif d'exploitation (310). Le procédé peut en outre consister à commander un processus de compression de gaz d'allégement. L'optimisation peut consister à optimiser le processus de compression de gaz d'allégement, le processus d'extraction de pétrole et de gaz, le processus de séparation de produit et le processus de dégazage en vue d'une optimisation du ou des objectifs d'exploitation.
Également publié en tant que
Dernières données bibliographiques dont dispose le Bureau international