WIPO logo
Mobile | Deutsch | English | Español | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Recherche dans les collections de brevets nationales et internationales
World Intellectual Property Organization
Recherche
 
Options de navigation
 
Traduction
 
Options
 
Quoi de neuf
 
Connexion
 
Aide
 
Traduction automatique
1. (WO2004055329) SYSTEME DE COMMANDE DE SOUTENEMENT SERVANT A COMMANDER LES DEPLACEMENTS D'UNITES DE SOUTENEMENT DANS LA TAILLE D'UNE MINE
Dernières données bibliographiques dont dispose le Bureau international   

N° de publication :    WO/2004/055329    N° de la demande internationale :    PCT/DE2003/004084
Date de publication : 01.07.2004 Date de dépôt international : 11.12.2003
CIB :
E21D 23/14 (2006.01), E21D 23/16 (2006.01)
Déposants : TIEFENBACH BERGBAUTECHNIK GMBH [DE/DE]; Kaninenberghöhe 2, 45136 Essen (DE) (Tous Sauf US).
KELLERMANN, Ursula [DE/DE]; (DE) (US Seulement).
KELLERMANN, Christian [DE/DE]; (DE) (US Seulement).
KELLERMANN, Holger [DE/DE]; (DE) (US Seulement)
Inventeurs : KELLERMANN, Heinz;
Mandataire : PFINGSTEN, Dieter; Krienen, Pfingsten, Truskowski, Königstr. 49, 42853 Remscheid (DE)
Données relatives à la priorité :
102 59 011.7 16.12.2002 DE
Titre (DE) AUSBAUSTEUERUNG ZUR STEUERUNG DER BEWEGUNGEN DER AUSBAUEINHEITEN IN DEM STREB EINES BERGWERKES
(EN) TIMBERING AND WALLING CONTROL FOR CONTROLLING THE MOVEMENTS OF TIMBERING AND WALLING UNITS IN THE COAL FACE OF A MINE
(FR) SYSTEME DE COMMANDE DE SOUTENEMENT SERVANT A COMMANDER LES DEPLACEMENTS D'UNITES DE SOUTENEMENT DANS LA TAILLE D'UNE MINE
Abrégé : front page image
(DE)Die Ausbausteuerung zur Steuerung der Bewegungen der Ausbaueinheiten in dem Streb eines Bergwerks besitzt eine Zentralsteuerung (50) und eine Vielzahl von Steuereinheiten (34), von denen jeder Ausbaueinheit jeweils eine Steuereinheit (Schildsteuerung) örtlich und funktionell zugeordnet ist. Die Schildsteuerungen sind mit der Zentralsteuerung und untereinander durch zwei Busleitungen (58, 59) verbunden, über welche jede der Schildsteuerungen zur Eingabe eines Steuerbefehls von der Zentralsteuerung oder einer benachbarten Schildsteuerung aus anrufbar ist. Jede Schildsteuerung ist derart programmiert, daß über die Busleitung einkommende Steuerbefehle, welche mit einem jeweils der angerufenen Schildsteuerung zugeordneten Codeworts belegt sind, der Schildsteuerung zur Ausführung übergebbar sind. Jede Schildsteuerung weist ein Schaltelement (53) auf, durch welches die Busleitung(en) in der Schildsteuerung auftrennbar ist (sind). Durch die gleichartige zweite Busleitung (Parallelbus) können einkommende Signale, welche nicht mit einem jeweils der angerufenen Schildsteuerung zugeordneten Codeworts belegt sind, an die benachbarte Schildsteuerung weitergeleitet werden.
(EN)The timbering and walling control of the movements of the timbering and walling units in the coal face of a mine comprises a central control system (50) and a plurality of control units (34) whereby a respective control unit (shield control unit) from a plurality of control units is functionally and locally allocated to each timbering and walling unit. The screen control units are connected to the central control system and to each other by means of two bus lines (58, 59) whereby each of the shield control units can be addressed in order to input a control command from the central control system or an adjacent screen control unit. Each screen control unit is programmed in such a way that control commands incoming from the bus line, which are provided with a code word respectively associated with the control unit thus addressed, can be transmitted to the screen control unit for execution. Each screen control unit comprises a switch element (53) which is used to separate the bus line(s) in the screen control unit. The second bus line (parallel bus) is used to retransmit incoming signals, which are not provided with a code word respectively allocated to the screen control unit thus addressed, to an adjacent screen control unit.
(FR)L'invention concerne un système de commande de soutènement servant à commander les déplacements d'unités de soutènement dans la taille d'une mine. Ce système comprend une commande centrale (50), ainsi qu'une pluralité d'unités de commande (34) parmi lesquelles une unité de commande respective (commande de bouclier) est associée à chaque unité de soutènement localement et fonctionnellement. Les commandes de boucliers sont reliées à la commande centrale et les unes aux autres au moyen de deux lignes bus (58, 59) par l'intermédiaire desquelles chacune des commandes de boucliers peut être appelée à partir de la commande centrale ou d'une commande de bouclier voisine en vue de la transmission d'une instruction de commande. Chaque commande de bouclier est programmée de telle sorte que les instructions de commande qui arrivent par la ligne bus et qui sont pourvues d'un mot de code associé respectivement à la commande de bouclier appelée puissent être transmises à ladite commande de bouclier en vue de leur exécution. Chaque commande de bouclier présente un élément de commutation (53) permettant de sectionner la ou les lignes bus dans la commande de bouclier. La seconde ligne bus similaire (bus parallèle) permet de transférer à la commande de bouclier voisine les signaux entrants qui ne sont pas pourvus d'un mot de code associé respectivement à la commande de bouclier appelée.
États désignés : AU, BY, CN, DE, GB, PL, RU, US, ZA.
Office européen des brevets (OEB) (AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LU, MC, NL, PT, RO, SE, SI, SK, TR).
Langue de publication : allemand (DE)
Langue de dépôt : allemand (DE)