1. JP2013030036 - PROCESS CONTROL SYSTEM, PROCESS CONTROL METHOD, PROGRAM, AND PROCESS CONTROL DEVICE

Office
Japon
Numéro de la demande 2011166253
Date de la demande 29.07.2011
Numéro de publication 2013030036
Date de publication 07.02.2013
Type de publication A
CIB
G06F 9/44
GPHYSIQUE
06CALCUL; COMPTAGE
FTRAITEMENT ÉLECTRIQUE DE DONNÉES NUMÉRIQUES
9Dispositions pour la commande par programme, p.ex. unités de commande
06utilisant des programmes stockés, c. à d. utilisant un moyen de stockage interne à l'équipement de traitement de données pour recevoir ou conserver les programmes
44Dispositions pour exécuter des programmes spécifiques
G06Q 10/00
GPHYSIQUE
06CALCUL; COMPTAGE
QSYSTÈMES OU MÉTHODES DE TRAITEMENT DE DONNÉES, SPÉCIALEMENT ADAPTÉS À DES FINS ADMINISTRATIVES, COMMERCIALES, FINANCIÈRES, DE GESTION, DE SURVEILLANCE OU DE PRÉVISION; SYSTÈMES OU MÉTHODES SPÉCIALEMENT ADAPTÉS À DES FINS ADMINISTRATIVES, COMMERCIALES, FINANCIÈRES, DE GESTION, DE SURVEILLANCE OU DE PRÉVISION, NON PRÉVUS AILLEURS
10Administration; Gestion
Déposants HITACHI LTD
株式会社日立製作所
HITACHI INFORMATION & CONTROL SOLUTIONS LTD
株式会社 日立産業制御ソリューションズ
Inventeurs HAYASHI YOSHITSUGU
林 義貢
TAKAMURA TOSHIKO
高村 稔子
Mandataires 角田 芳末
Titre
(EN) PROCESS CONTROL SYSTEM, PROCESS CONTROL METHOD, PROGRAM, AND PROCESS CONTROL DEVICE
(JA) 工程管理システム、工程管理方法、プログラム及び工程管理装置
Abrégé
(EN)

PROBLEM TO BE SOLVED: To improve the accuracy of man-hour estimation in managing the process of a project in software development.

SOLUTION: A process control system 10 comprises an analysis server 1 that calculates an estimated value that shows an estimation of man hour required for tasks included in a project for which a new estimation of man hour is to be performed, the estimation of man hour being obtained by reading out process control information including information on past tasks from a task information database 3 and analyzing the process control information. The process control system also comprises an information server 2 that is selected by a manager terminal 5 connected to the information server 2 through a network and that instructs the manager terminal 5 and a responsible person terminal 6 to display, as analysis information, an estimated value of man hour obtained as a result of the analysis by the analysis server on the tasks included in the project for which the new estimation of man hour is to be performed.

COPYRIGHT: (C)2013,JPO&INPIT

(JA)

【課題】ソフトウェア開発においてプロジェクトの工程を管理する場合に、工数の見積り精度を高めること。
【解決手段】工程管理システム10は、過去に行われたタスクが含まれる工程管理情報をタスク情報データベース3から読み出して解析することにより、新たに工数の見積りが行われるプロジェクトに含まれるタスクに必要となる工数を予測した予測値を求める解析サーバ1を備える。また、ネットワークを介して接続される管理者端末5によって選択され、新たに工数の見積りが行われるプロジェクトに含まれるタスクについて、解析サーバが解析した工数の予測値を解析情報として管理者端末5と担当者端末6に表示させる情報サーバ2と、を備える。
【選択図】図1