1. WO2020161340 - SYSTÈME ET PROCÉDÉ DE DÉMANTÈLEMENT D'UNE PLATEFORME EN MER

Numéro de publication WO/2020/161340
Date de publication 13.08.2020
N° de la demande internationale PCT/EP2020/053210
Date du dépôt international 07.02.2020
CIB
E02B 17/02 2006.1
ECONSTRUCTIONS FIXES
02HYDRAULIQUE; FONDATIONS; TERRASSEMENT
BHYDRAULIQUE
17Iles artificielles montées sur pilotis ou supports similaires, p.ex. plates-formes sur pieds extensibles; Procédés de construction de celles-ci
02mises en place par abaissement de la structure de support jusqu'à toucher le fond, p.ex. en la fixant ensuite sur celui-ci
E02B 17/00 2006.1
ECONSTRUCTIONS FIXES
02HYDRAULIQUE; FONDATIONS; TERRASSEMENT
BHYDRAULIQUE
17Iles artificielles montées sur pilotis ou supports similaires, p.ex. plates-formes sur pieds extensibles; Procédés de construction de celles-ci
CPC
E02B 17/021
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
BHYDRAULIC ENGINEERING
17Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs ; or offshore constructions; Construction methods therefor
02placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
021with relative movement between supporting construction and platform
E02B 17/027
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
BHYDRAULIC ENGINEERING
17Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs ; or offshore constructions; Construction methods therefor
02placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
027steel structures
E02B 2017/0052
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
BHYDRAULIC ENGINEERING
17Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs ; or offshore constructions; Construction methods therefor
0052Removal or dismantling of offshore structures from their offshore location
Déposants
  • PETRODEC B.V. [NL]/[NL]
Inventeurs
  • LE GAL, Jean-Christophe
Mandataires
  • SANTARELLI
Données relatives à la priorité
19305159.608.02.2019EP
Langue de publication anglais (EN)
Langue de dépôt anglais (EN)
États désignés
Titre
(EN) STRUCTURE AND METHOD FOR DECOMMISSIONING AN OFFSHORE PLATFORM
(FR) SYSTÈME ET PROCÉDÉ DE DÉMANTÈLEMENT D'UNE PLATEFORME EN MER
Abrégé
(EN)
Structure and method for decommissioning offshore platforms presenting topsides (12) mounted on a jacket having a plurality of jacket legs. The offshore decommissioning structure comprises a jack-up-vessel (1) comprising a hull, a main deck (5), an elevating jacking device and a plurality of jack-up legs, wherein said jack-up vessel (1) is elevated on its legs above the sea level by the elevating jacking device. Furthermore, the structure comprises a carrying and skidding system for shifting the topsides (12)from the platform jacket onto the main deck (5) of the jack-up vessel (1).Besides, the method comprises the following steps: position the jack-up vessel (1) close to the platform (12); position skid beams (18) on jack-up main deck (5) relative to the platform legs; push jacket skid beams toward the jacket legs;cut the platform jacket legs below the topside (12); and shift the topsides (12) on the skid beams (18) to the jack-up main deck (5).
(FR)
L'invention concerne une structure et un procédé de démantèlement de plateformes en mer présentant un superstructure (12) montée sur un treillis ayant une pluralité de jambes de treillis. La structure de démantèlement en mer comprend un vaisseau élévateur (1) comprenant une coque, un pont principal (5), un dispositif de levage et une pluralité de jambes d'élévateur, ledit navire de type jack-up (1) étant élevé sur ses jambes au-dessus du niveau de la mer par le dispositif de levage. En outre, la structure comprend un système de transport et de glissement pour déplacer la superstructure (12) du treillis de la plateforme sur le pont principal (5) du vaisseau élévateur (1). En outre, la méthode comprend les étapes suivantes : positionner le navire de levage (1) à proximité de la plateforme (12); positionner les poutres de glissement (18) sur le pont principal de levage (5) par rapport aux jambes de la plateforme; pousser les poutres de glissement du treillis vers les jambes du treillis; couper les jambes du treillis de la plateforme sous le dessus (12); et déplacer les dessus (12) sur les poutres de glissement (18) vers le pont principal de levage (5).