Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

Goto Application

1. WO2020062966 - DISPOSITIF DE RÉGLAGE DE PERPENDICULARITÉ POUR COLONNE STRUCTURELLE VERTICALE DE COFFRAGE DE PLATEFORME EN ACIER INTÉGRÉ ET PROCÉDÉ DE CONSTRUCTION

Numéro de publication WO/2020/062966
Date de publication 02.04.2020
N° de la demande internationale PCT/CN2019/092631
Date du dépôt international 25.06.2019
CIB
E04G 21/18 2006.01
ECONSTRUCTIONS FIXES
04BÂTIMENT
GÉCHAFAUDAGES; COFFRES; COFFRAGES; INSTRUMENTS DE MAÇONS OU AUTRE MATÉRIEL ACCESSOIRE POUR LE BÂTIMENT OU LEUR EMPLOI; MANUTENTION DES MATÉRIAUX DE CONSTRUCTION SUR LE CHANTIER; RÉPARATION, DÉMOLITION OU AUTRES TRAVAUX SUR LES BÂTIMENTS CONSTRUITS
21Préparation, transport ou travail sur place des matériaux ou des éléments de construction; Autres dispositifs ou mesures concernant les travaux de construction
14Transport ou assemblage des éléments de construction
16Outils ou appareils
18Outils pour ajustage; Gabarits
E04G 3/28 2006.01
ECONSTRUCTIONS FIXES
04BÂTIMENT
GÉCHAFAUDAGES; COFFRES; COFFRAGES; INSTRUMENTS DE MAÇONS OU AUTRE MATÉRIEL ACCESSOIRE POUR LE BÂTIMENT OU LEUR EMPLOI; MANUTENTION DES MATÉRIAUX DE CONSTRUCTION SUR LE CHANTIER; RÉPARATION, DÉMOLITION OU AUTRES TRAVAUX SUR LES BÂTIMENTS CONSTRUITS
3Echafaudages essentiellement supportés par le bâtiment, p.ex. réglables en hauteur
28Échafaudages mobiles; Échafaudages avec plates-formes mobiles
CPC
E04G 3/28
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
3Scaffolds essentially supported by building constructions, e.g. adjustable in height
28Mobile scaffolds; Scaffolds with mobile platforms
E04G 5/06
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
5Component parts or accessories for scaffolds
06Consoles; Brackets
G01C 9/00
GPHYSICS
01MEASURING; TESTING
CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
9Measuring inclination, e.g. by clinometers, by levels
Déposants
  • 上海建工集团股份有限公司 SHANGHAI CONSTRUCTION GROUP CO., LTD. [CN]/[CN]
Inventeurs
  • 龚剑 GONG, Jian
  • 刘星 LIU, Xing
  • 顾国明 GU, Guoming
  • 郭海龙 GUO, Hailong
  • 扶新立 FU, Xinli
  • 王小安 WANG, Xiaoan
  • 吴联定 WU, Lianding
  • 潘曦 PAN, Xi
Données relatives à la priorité
201811137400.128.09.2018CN
Langue de publication chinois (ZH)
Langue de dépôt chinois (ZH)
États désignés
Titre
(EN) PERPENDICULARITY CONTROL DEVICE FOR VERTICAL STRUCTURAL COLUMN OF INTEGRATED STEEL PLATFORM FORMWORK AND CONSTRUCTION METHOD
(FR) DISPOSITIF DE RÉGLAGE DE PERPENDICULARITÉ POUR COLONNE STRUCTURELLE VERTICALE DE COFFRAGE DE PLATEFORME EN ACIER INTÉGRÉ ET PROCÉDÉ DE CONSTRUCTION
(ZH) 整体钢平台模架竖向结构柱垂直度调控装置及施工方法
Abrégé
(EN)
A perpendicularity control device for a vertical structural column (2) of an integrated steel platform formwork and a construction method. The perpendicularity control device is provided at a corner portion unit formwork of a rectangular core tube, and comprises: two first hoops (10) spaced apart from each other and sleeved on the vertical structural column (2), two second hoops (20) respectively sleeved on two horizontal connection rods (3) perpendicularly fixed to the vertical structural column (2), two bidirectional deviation correction adjustment assemblies (30) hinge-connected to the first hoop (10) and the second hoop (20), respectively, a tilt sensor (50) mounted at a top portion of the vertical structural column (2), and a computer in a control room, the computer being connected to the tilt sensor (50). The perpendicularity control device further comprises a hydraulic cylinder (36) and a hydraulic pump. The construction method comprises: S1, assembling an integrated platform formwork; and S2, adjusting and running a perpendicularity control device. The device improves control precision and construction efficiency.
(FR)
L'invention concerne un dispositif de réglage de perpendicularité pour une colonne (2) structurelle verticale d'un coffrage de plateforme en acier intégré et un procédé de construction. Le dispositif de réglage de perpendicularité est disposé au niveau d'un coffrage d'unité de partie d'angle d'un tube central rectangulaire, et comprend : deux premiers feuillards (10) espacés l'un de l'autre et emmanchés sur la colonne (2) structurelle verticale, deux seconds feuillards (20) emmanchés respectivement sur deux tiges de liaison horizontales (3) fixées perpendiculairement à la colonne (2) structurelle verticale, deux ensembles de réglage de correction d'écart bidirectionnel (30) reliés par charnière au premier feuillard (10) et au second feuillard (20), respectivement, un capteur (50) d'inclinaison monté au niveau d'une partie supérieure de la colonne (2) structurelle verticale, et un ordinateur dans une salle de commande, l'ordinateur étant connecté au capteur (50) d'inclinaison. Le dispositif de réglage de perpendicularité comprend en outre un cylindre (36) hydraulique et une pompe hydraulique. Le procédé de construction comprend : S1, l'assemblage d'un coffrage de plateforme intégré ; et S2, l'ajustement et l'exécution d'un dispositif de réglage de perpendicularité. Le dispositif permet d'améliorer la précision du réglage et l'efficacité de la construction.
(ZH)
一种整体钢平台模架竖向结构柱(2)垂直度调控装置及施工方法,设置于矩形核心筒角部单元模架,包括:两个第一卡箍(10),间隔设置并套设于竖向结构柱(2);两个第二卡箍(20),分别套设于与竖向结构柱(2)垂直固定的两根水平连接杆(3);两个双向纠偏调节组件(30),分别与第一卡箍(10)、第二卡箍(20)铰接;倾角传感器(50),安装于竖向结构柱(2)顶部;中控室的计算机,其与倾角传感器(50)连接;还包括油缸(36)和油泵。施工方法包括:S1拼装整体平台模架;S2对垂直调控装置进行调试并运行。该装置提高了控制精度,提高了施工效率。
Également publié en tant que
Dernières données bibliographiques dont dispose le Bureau international