Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

Aller à Demande

1. WO2020018112 - TRAITEMENT DE STIMULATION UTILISANT UNE SYNCHRONISATION DE COLLISION PRÉCISE D'IMPULSIONS OU D'ONDES DE PRESSION

Numéro de publication WO/2020/018112
Date de publication 23.01.2020
N° de la demande internationale PCT/US2018/043037
Date du dépôt international 20.07.2018
CIB
E21B 43/26 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
25Procédés pour activer la production
26par formation de crevasses ou de fractures
E21B 43/114 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
11Perforateurs; Perméators
114Perforateurs utilisant l'action directe d'un fluide, p.ex. jets abrasifs
CPC
E21B 43/114
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
11Perforators; Permeators
114Perforators using direct fluid action ; on the wall to be perforated; , e.g. abrasive jets
E21B 43/26
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
25Methods for stimulating production
26by forming crevices or fractures
Déposants
  • HALLIBURTON ENERGY SERVICES, INC. [US]/[US]
Inventeurs
  • SURJAATMADJA, Jim, Basuki
  • HUNTER, Tim, H.
  • STEPHENSON, Stanley, V.
Mandataires
  • PENNINGTON, Tammy
  • FLANNERY, Elizabeth, D.
  • MORICO, Paul
  • EBER, Michelle
  • ALFARO, Micaela, N.
Données relatives à la priorité
Langue de publication anglais (EN)
Langue de dépôt anglais (EN)
États désignés
Titre
(EN) STIMULATION TREATMENT USING ACCURATE COLLISION TIMING OF PRESSURE PULSES OR WAVES
(FR) TRAITEMENT DE STIMULATION UTILISANT UNE SYNCHRONISATION DE COLLISION PRÉCISE D'IMPULSIONS OU D'ONDES DE PRESSION
Abrégé
(EN)
An injection pumping system is used to generate pressure pulses in a wellbore to create pressure spikes for stimulation treatment of the wellbore. An initial pressure pulse is generated with a known travel time from the surface to a termination point and back to a specified location within the wellbore. A subsequent pressure pulse with a known travel time from the surface to the specified location can be generated to collide with the initial pressure pulse at the specified location. Knowing the speed of sound throughout the wellbore allows for an accurate calculation of the required travel times for each of the pressure pulses. Multiple sections of the wellbore can be treated preferentially and independently without requiring multiple runs of a perforating tool as the pressure pulses can be manipulated to collide at different locations throughout the wellbore based on the known travel times.
(FR)
La présente invention concerne un système de pompage par injection, utilisé pour produire des impulsions de pression dans un puits de forage afin de créer des pics de pression pour le traitement de stimulation du puits de forage. Une impulsion de pression initiale est produite avec un temps de déplacement connu, de la surface à un point de terminaison et retour, jusqu'à un emplacement spécifié à l'intérieur du puits de forage. Une impulsion de pression ultérieure avec un temps de déplacement connu, de la surface à l'emplacement spécifié, peut être produite afin d'entrer en collision avec l'impulsion de pression initiale à l'emplacement spécifié. La connaissance de la vitesse du son à travers le puits de forage permet de calculer précisément des temps de déplacement requis pour chacune des impulsions de pression. De multiples sections du puits de forage peuvent être traitées de manière préférentielle et indépendante, sans nécessiter de multiples passages d'un outil de perforation puisque les impulsions de pression peuvent être manipulées pour entrer en collision à différents emplacements dans le puits de forage, sur la base des temps de déplacement connus.
Dernières données bibliographiques dont dispose le Bureau international