Certains contenus de cette application ne sont pas disponibles pour le moment.
Si cette situation persiste, veuillez nous contacter àObservations et contact
1. (WO2019063972) PROCÉDÉ DE RÉGULATION D'UN PUITS
Dernières données bibliographiques dont dispose le Bureau internationalFormuler une observation

N° de publication : WO/2019/063972 N° de la demande internationale : PCT/GB2018/052658
Date de publication : 04.04.2019 Date de dépôt international : 18.09.2018
Demande présentée en vertu du Chapitre 2 : 11.07.2019
CIB :
E21B 29/06 (2006.01) ,E21B 29/08 (2006.01) ,E21B 34/06 (2006.01) ,E21B 43/17 (2006.01) ,E21B 7/04 (2006.01)
E CONSTRUCTIONS FIXES
21
FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
B
FORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
29
Découpage ou destruction de tubes, packers, bouchons ou câbles, situés dans les trous de forage ou dans les puits, p.ex. découpage de tubes endommagés, de fenêtres; Déformation des tubes dans les trous de forage; Remise en état des tubages de puits sans les retirer du sol
06
Découpage de fenêtres, p.ex. découpage directionnel de fenêtres en vue d'opérations impliquant des sifflets-déviateurs
E CONSTRUCTIONS FIXES
21
FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
B
FORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
29
Découpage ou destruction de tubes, packers, bouchons ou câbles, situés dans les trous de forage ou dans les puits, p.ex. découpage de tubes endommagés, de fenêtres; Déformation des tubes dans les trous de forage; Remise en état des tubages de puits sans les retirer du sol
08
Découpage ou déformation des tuyaux pour commander l'écoulement du fluide
E CONSTRUCTIONS FIXES
21
FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
B
FORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
34
Aménagements des vannes pour les trous de forage ou pour les puits
06
dans les puits
E CONSTRUCTIONS FIXES
21
FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
B
FORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43
Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
16
Procédés de récupération assistée pour l'extraction d'hydrocarbures
17
Mise en communication de plusieurs puits par fracturation ou autre attaque de la formation
E CONSTRUCTIONS FIXES
21
FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
B
FORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
7
Procédés ou matériels particuliers pour le forage
04
Forage dirigé
Déposants :
METROL TECHNOLOGY LIMITED [GB/GB]; Unit 24, Kirkhill Place Kirkhill Industrial Estate Dyce, Dyce Aberdeen Aberdeenshire AB21 0GU, GB
Inventeurs :
ROSS, Shaun Compton; GB
JARVIS, Leslie David; GB
Mandataire :
HGF LIMITED; Document Handing HGF Aberdeen 1 City Walk Leeds West Yorkshire LS11 9DX, GB
Données relatives à la priorité :
1715584.726.09.2017GB
Titre (EN) METHOD OF CONTROLLING A WELL
(FR) PROCÉDÉ DE RÉGULATION D'UN PUITS
Abrégé :
(EN) A method of controlling a well in a geological structure, the well comprising: a first casing string (12a), and a second casing string (12b) at least partially inside the first casing string thus defining a first inter-casing annulus therebetween. A primary fluid flow control device (16a), such as a wirelessly controllable valve, is provided in the second casing string (12b) to provide fluid communication between the first inter-casing annulus(14a) and a bore (14b) of the second casing string (12b). In the event of well "blow-out", a relief well (40) may be drilled and a fluid communication path formed between the relief well and the first casing string of the well rather than extend to lower and/or narrower sections of casing. A kill fluid can then be introduced via the relief well (40) and the primary fluid flow control device (16a) used to direct fluid to the second casing bore(14b). Further casing strings (12c) may be part of the well, and include corresponding flow control devices (16b), allowing the kill fluid to cascade down the well to control it. Accordingly, the time taken to drill a relief well to a shallower depth than is conventional can reduce the time and cost to control the well and can mitigate environmental impact of hydrocarbon loss caused by the blow-out.
(FR) L'invention concerne un procédé de régulation d'un puits dans une structure géologique, le puits comprenant : une première colonne de tubage (12a), et une seconde colonne de tubage (12b) au moins partiellement à l'intérieur de la première colonne de tubage définissant ainsi un premier espace annulaire inter-tube entre elles. Un dispositif de régulation d'écoulement de fluide primaire (16a), tel qu'une valve pouvant être commandée sans fil, est disposé dans la seconde colonne de tubage (12b) pour assurer une communication fluidique entre le premier espace annulaire inter-tube (14a) et un alésage (14b) de la seconde colonne de tubage (12b). En cas d'éruption de puits, un puits d'intervention (40) peut être foré et un trajet de communication fluidique formé entre le puits d'intervention et la première colonne de tubage du puits plutôt que de s'étendre vers des sections inférieures et/ou plus étroites du tube. Un fluide de neutralisation peut ensuite être introduit par l'intermédiaire du puits d'intervention (40) et du dispositif de régulation d'écoulement de fluide primaire (16a) utilisé pour diriger un fluide vers le second alésage de tube (14b). D'autres colonnes de tubage (12c) peuvent faire partie du puits, et comprendre des dispositifs de régulation d'écoulement correspondants (16b), permettant au fluide de neutralisation de s’écouler vers le bas du puits pour le réguler. Par conséquent, le temps nécessaire pour forer un puits d'intervention jusqu'à une profondeur moins profonde que dans les procédés classiques peut réduire le temps et le coût de régulation du puits et atténuer l'impact environnemental de la perte d'hydrocarbures provoquée par l'éruption.
front page image
États désignés : AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DJ, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JO, JP, KE, KG, KH, KN, KP, KR, KW, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW
Organisation régionale africaine de la propriété intellectuelle (ARIPO) (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW)
Office eurasien des brevets (OEAB) (AM, AZ, BY, KG, KZ, RU, TJ, TM)
Office européen des brevets (OEB) (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR)
Organisation africaine de la propriété intellectuelle (OAPI) (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG)
Langue de publication : Anglais (EN)
Langue de dépôt : Anglais (EN)