Traitement en cours

Veuillez attendre...

Paramétrages

Paramétrages

1. WO2012009099 - OUTIL DE FRACTURATION À AUTOPRODUCTION

Numéro de publication WO/2012/009099
Date de publication 19.01.2012
N° de la demande internationale PCT/US2011/040805
Date du dépôt international 17.06.2011
CIB
E21B 43/26 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
43Procédés ou dispositifs pour l'extraction de pétrole, de gaz, d'eau ou de matériaux solubles ou fusibles ou d'une suspension de matières minérales à partir de puits
25Procédés pour activer la production
26par formation de crevasses ou de fractures
E21B 33/068 2006.01
ECONSTRUCTIONS FIXES
21FORAGE DU SOL OU DE LA ROCHE; EXPLOITATION MINIÈRE
BFORAGE DU SOL OU DE LA ROCHE; EXTRACTION DU PÉTROLE, DU GAZ, DE L'EAU OU DE MATÉRIAUX SOLUBLES OU FUSIBLES OU D'UNE SUSPENSION DE MATIÈRES MINÉRALES À PARTIR DE PUITS
33Etanchement ou bouchage des trous de forage ou des puits
02Etanchement ou bouchage à la surface
03Têtes de puits; Leur mise en place
068comportant des dispositions pour introduire des objets dans les puits ou pour les en retirer, ou pour y introduire des fluides
CPC
E21B 2034/007
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
34Valve arrangements for boreholes or wells
007Sleeve valves
E21B 34/14
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
34Valve arrangements for boreholes or wells
06in wells
14operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
E21B 43/26
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
25Methods for stimulating production
26by forming crevices or fractures
Déposants
  • BAKER HUGHES INCORPORATED [US/US]; 2929 Allen Parkway, Suite 2100 Houston, Texas 77019-2118, US (AllExceptUS)
  • KORKMAZ, Lale [TR/US]; US (UsOnly)
  • STOWE II, Calvin J. [US/US]; US (UsOnly)
Inventeurs
  • KORKMAZ, Lale; US
  • STOWE II, Calvin J.; US
Mandataires
  • PORTER, Andre J.; 14990 Yorktown Plaza Houston, TX 77040, US
Données relatives à la priorité
12/804,25016.07.2010US
Langue de publication anglais (EN)
Langue de dépôt anglais (EN)
États désignés
Titre
(EN) AUTO-PRODUCTION FRAC TOOL
(FR) OUTIL DE FRACTURATION À AUTOPRODUCTION
Abrégé
(EN)
Fracturing tools for use in oil and gas wells comprise an inner sleeve, an outer sleeve, a run-in position, and two operational positions. The inner sleeve comprises two ports and two positions. The first port is aligned with a first port of the housing when the tool and sleeve are in the first operational position and is closed when the tool and sleeve are in the run-in position. After performing the first operation, the inner sleeve is returned to its initial position and the outer sleeve is moved placing the tool in the second operational position in which the second port in the inner sleeve is in fluid communication with a second port in the housing. Movement of the tool from the first operational position to the second operational position so that a second operation can be performed is done without the need for an additional well intervention step.
(FR)
L'invention porte sur les outils de fracturation destinés à être utilisés dans des puits de pétrole et de gaz. Selon l'invention, les outils comprennent une gaine intérieure, une gaine extérieure, une position de mise en place et deux positions de fonctionnement. La gaine intérieure comprend deux orifices et deux positions. Le premier orifice est aligné avec un premier orifice de l'enveloppe lorsque l'outil et la gaine sont dans la première position de fonctionnement et il est fermé lorsque l'outil et la gaine sont dans la position de mise en place. Après l'exécution de la première opération, la gaine intérieure est ramenée à sa position initiale et la gaine extérieure est déplacée en plaçant l'outil dans la seconde position de fonctionnement, dans laquelle le second orifice de la gaine intérieure est en communication fluidique avec un second orifice de l'enveloppe. Le déplacement de l'outil de la première position de fonctionnement à la seconde position de fonctionnement, qui est tel qu'une seconde opération peut être exécutée, se fait sans nécessiter de phase additionnelle d'intervention sur le puits.
Également publié en tant que
GB1223072.8
NO20121506
Dernières données bibliographiques dont dispose le Bureau international