1. WO2012008657 - RAIDISSEUR EN ACIER PRÉCONTRAINT POUR ÉCHAFAUDAGE DE MAINTIEN DE TERRE ET SON PROCÉDÉ DE CONSTRUCTION

Numéro de publication WO/2012/008657
Date de publication 19.01.2012
N° de la demande internationale PCT/KR2010/007534
Date du dépôt international 29.10.2010
CIB
E02D 17/04 2006.01
ECONSTRUCTIONS FIXES
02HYDRAULIQUE; FONDATIONS; TERRASSEMENT
DFONDATIONS; EXCAVATIONS; DIGUES; OUVRAGES SOUTERRAINS OU SOUS L'EAU
17Excavations; Aménagement des bords des excavations; Construction de digues ou de terre-pleins
02Trous de fondation
04Aménagement des bords ou consolidation des parois des trous de fondation
E02D 17/08 2006.01
ECONSTRUCTIONS FIXES
02HYDRAULIQUE; FONDATIONS; TERRASSEMENT
DFONDATIONS; EXCAVATIONS; DIGUES; OUVRAGES SOUTERRAINS OU SOUS L'EAU
17Excavations; Aménagement des bords des excavations; Construction de digues ou de terre-pleins
06Fossés ou puits de fondation
08Aménagement des bords ou consolidation des parois des fossés ou puits de fondation
CPC
E02D 17/04
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
17Excavations; Bordering of excavations; Making embankments
02Foundation pits
04Bordering ; surfacing; or stiffening the sides of foundation pits
E02D 19/06
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
19Keeping dry foundation sites or other areas in the ground
06Restraining of underground water
E02D 19/12
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
19Keeping dry foundation sites or other areas in the ground
06Restraining of underground water
12by damming or interrupting the passage of underground water
Déposants
  • 노윤근 NO, Yun Keun [KR/KR]; KR
  • 박근화 PARK, Geun Hwa [KR/KR]; KR
  • 노경범 NO, Kyung Beom [KR/KR]; KR
Inventeurs
  • 노윤근 NO, Yun Keun; KR
  • 박근화 PARK, Geun Hwa; KR
  • 노경범 NO, Kyung Beom; KR
Mandataires
  • 주종호 JOO, Jong Ho; 서울시 강남구 테헤란로 123 11층 11F., 123 Teheran-ro Gangnam-gu Seoul 135-748, KR
Données relatives à la priorité
10-2010-006670012.07.2010KR
Langue de publication coréen (KO)
Langue de dépôt coréen (KO)
États désignés
Titre
(EN) PRESTRESS STEEL WALE FOR EARTH RETAINING SCAFFOLDING AND CONSTRUCTION METHOD THEREOF
(FR) RAIDISSEUR EN ACIER PRÉCONTRAINT POUR ÉCHAFAUDAGE DE MAINTIEN DE TERRE ET SON PROCÉDÉ DE CONSTRUCTION
(KO) 흙막이 가시설용 프리스트레스 강재띠장 및 이의 시공방법
Abrégé
(EN)
Provided are a prestress steel wale for earth retaining scaffolding and a construction method thereof, wherein a PS steel fixed bracket and a PS steel base, which are used in the existing steel wale for earth retaining scaffolding, are improved so as to increase the amount of induced prestress by the PS steel material, simplify the induction of additional prestress during construction, and prevent the buckling displacement of the PS steel base when inducing the prestress, thereby improves constructability, increases stability, makes it possible to have extending span ranges and increases economic efficiency. According to the prestress steel wale for earth retaining scaffolding and the construction method thereof, a PS steel fixed bracket and a PS steel base, which are used in the existing steel wale for earth retaining scaffolding are improved so that the amount of induced prestress by the PS steel material is increased, the additional prestress makes it possible to be induced at any time during the construction, and the buckling displacement of the PS steel base is prevented when inducing the prestress. Therefore, it is possible to improve constructability, increase stability, promote extending span ranges and improve economic efficiency.
(FR)
L'invention porte sur un raidisseur en acier précontraint pour échafaudage de maintien de terre et sur son procédé de construction, dans lesquels un support fixe en acier précontraint et une base en acier précontraint, qui sont utilisés dans le raidisseur en acier existant pour échafaudage de maintien de terre, sont améliorés de façon à accroître la quantité de précontrainte induite par le matériau en acier précontraint, à simplifier l'induction d'une précontrainte additionnelle pendant la construction, et à empêcher le dérobement de la base en acier précontraint lors de l'induction de la précontrainte, de façon à améliorer ainsi l'aptitude à la construction, à accroître la stabilité, à rendre possible d'avoir des plages d'étendue prolongées et à augmenter l'efficience économique. Selon le raidisseur en acier précontraint pour échafaudage de maintien de terre et son procédé de construction, un support fixe en acier précontraint et une base en acier précontraint, qui sont utilisés dans le raidisseur en acier existant pour échafaudage de maintien de terre, sont améliorés, de sorte que la quantité de précontrainte induite par le matériau en acier précontraint soit accrue, qu'il est possible d'induire la précontrainte additionnelle à tout moment pendant la construction, et que le dérobement de la base en acier précontraint est empêché lors de l'induction de la précontrainte. Par conséquent, il est possible d'améliorer l'aptitude à la construction, d'accroître la stabilité, de favoriser des plages d'étendue prolongées et d'améliorer l'efficience économique.
(KO)
기존의 흙막이 가시설용 프리스트레스 강재띠장에 사용되는 PS강재 정착브라켓과 PS강재 받침대를 개량하여 PS강재에 의한 프리스트레스 도입량을 크게 하고, 시공중 추가적인 프리스트레스의 도입을 용이하게 하며, 프리스트레스 도입시 PS강재 받침대의 좌굴변위를 방지하여 시공성을 향상시키고 안전성을 증대시키며, 장경간화를 가능하게 하며, 경제성을 증대시키도록 한 흙막이 가시설용 프리스트레스 강재띠장 및 이의 시공방법이 제공된다. 흙막이 가시설용 프리스트레스 강재띠장 및 이의 시공방법은 기존의 흙막이 가시설용 프리스트레스 강재띠장에 사용되는 PS강재 정착브라켓과 PS강재 받침대를 개량하여 PS강재에 의한 프리스트레스 도입량을 크게 하고, 시공중에 언제든지 추가적인 프리스트레스의 도입이 가능하고, 프리스트레스 도입시 PS강재 받침대의 좌굴변위를 방지하여 시공성을 향상시키고 안전성을 증대시키고, 장경간화를 도모하며, 경제성을 향상시키는 효과가 있다.