Parte del contenido de esta aplicación no está disponible en este momento.
Si esta situación persiste, contáctenos aComentarios y contacto
1. (WO2019063972) METHOD OF CONTROLLING A WELL
Datos bibliográficos más recientes de la Oficina InternacionalFormular observación

Nº de publicación: WO/2019/063972 Nº de la solicitud internacional: PCT/GB2018/052658
Fecha de publicación: 04.04.2019 Fecha de presentación de la solicitud internacional: 18.09.2018
Se presentó la solicitud en virtud del Capítulo II: 11.07.2019
CIP:
E21B 29/06 (2006.01) ,E21B 29/08 (2006.01) ,E21B 34/06 (2006.01) ,E21B 43/17 (2006.01) ,E21B 7/04 (2006.01)
E CONSTRUCCIONES FIJAS
21
PERFORACION DEL SUELO O DE LA ROCA; EXPLOTACION MINERA
B
PERFORACION DEL SUELO O DE LA ROCA; EXTRACCION DE PETROLEO, GAS, AGUA O MATERIALES SOLUBLES O FUNDIBLES O DE UNA SUSPENSION DE MATERIAS MINERALES A PARTIR DE POZOS
29
Corte o destrucción de tubos, empaquetaduras de estanqueidad, tapones o cables, situados en orificios de perforación o en pozos, p. ej. corte de tubos dañados o de diafragmas; Deformación de tubos en los orificios de perforación; Reacondicionamiento de entubados de pozos sin retirarlos del suelo
06
Corte de diafragmas, p. ej. corte dirigible de diafragmas a la vista de las operaciones que implican los biseles desviadores
E CONSTRUCCIONES FIJAS
21
PERFORACION DEL SUELO O DE LA ROCA; EXPLOTACION MINERA
B
PERFORACION DEL SUELO O DE LA ROCA; EXTRACCION DE PETROLEO, GAS, AGUA O MATERIALES SOLUBLES O FUNDIBLES O DE UNA SUSPENSION DE MATERIAS MINERALES A PARTIR DE POZOS
29
Corte o destrucción de tubos, empaquetaduras de estanqueidad, tapones o cables, situados en orificios de perforación o en pozos, p. ej. corte de tubos dañados o de diafragmas; Deformación de tubos en los orificios de perforación; Reacondicionamiento de entubados de pozos sin retirarlos del suelo
08
Corte o deformación de tubos para controlar la corriente de fluido
E CONSTRUCCIONES FIJAS
21
PERFORACION DEL SUELO O DE LA ROCA; EXPLOTACION MINERA
B
PERFORACION DEL SUELO O DE LA ROCA; EXTRACCION DE PETROLEO, GAS, AGUA O MATERIALES SOLUBLES O FUNDIBLES O DE UNA SUSPENSION DE MATERIAS MINERALES A PARTIR DE POZOS
34
Instalación de válvulas en los orificios de perforación o en los pozos
06
en los pozos
E CONSTRUCCIONES FIJAS
21
PERFORACION DEL SUELO O DE LA ROCA; EXPLOTACION MINERA
B
PERFORACION DEL SUELO O DE LA ROCA; EXTRACCION DE PETROLEO, GAS, AGUA O MATERIALES SOLUBLES O FUNDIBLES O DE UNA SUSPENSION DE MATERIAS MINERALES A PARTIR DE POZOS
43
Procedimientos o dispositivos para la extracción de petróleo, gas, agua o materiales solubles o fundibles o de una suspensión de materias minerales a partir de pozos
16
Procedimientos de recuperación optimizada para la extracción de hidrocarburos
17
Puesta en comunicación dos o más pozos por fracturación u otro ataque de la formación
E CONSTRUCCIONES FIJAS
21
PERFORACION DEL SUELO O DE LA ROCA; EXPLOTACION MINERA
B
PERFORACION DEL SUELO O DE LA ROCA; EXTRACCION DE PETROLEO, GAS, AGUA O MATERIALES SOLUBLES O FUNDIBLES O DE UNA SUSPENSION DE MATERIAS MINERALES A PARTIR DE POZOS
7
Procedimientos o aparatos especiales para la perforación
04
Perforación dirigida
Solicitantes:
METROL TECHNOLOGY LIMITED [GB/GB]; Unit 24, Kirkhill Place Kirkhill Industrial Estate Dyce, Dyce Aberdeen Aberdeenshire AB21 0GU, GB
Personas inventoras:
ROSS, Shaun Compton; GB
JARVIS, Leslie David; GB
Mandataria/o:
HGF LIMITED; Document Handing HGF Aberdeen 1 City Walk Leeds West Yorkshire LS11 9DX, GB
Datos de prioridad:
1715584.726.09.2017GB
Título (EN) METHOD OF CONTROLLING A WELL
(FR) PROCÉDÉ DE RÉGULATION D'UN PUITS
Resumen:
(EN) A method of controlling a well in a geological structure, the well comprising: a first casing string (12a), and a second casing string (12b) at least partially inside the first casing string thus defining a first inter-casing annulus therebetween. A primary fluid flow control device (16a), such as a wirelessly controllable valve, is provided in the second casing string (12b) to provide fluid communication between the first inter-casing annulus(14a) and a bore (14b) of the second casing string (12b). In the event of well "blow-out", a relief well (40) may be drilled and a fluid communication path formed between the relief well and the first casing string of the well rather than extend to lower and/or narrower sections of casing. A kill fluid can then be introduced via the relief well (40) and the primary fluid flow control device (16a) used to direct fluid to the second casing bore(14b). Further casing strings (12c) may be part of the well, and include corresponding flow control devices (16b), allowing the kill fluid to cascade down the well to control it. Accordingly, the time taken to drill a relief well to a shallower depth than is conventional can reduce the time and cost to control the well and can mitigate environmental impact of hydrocarbon loss caused by the blow-out.
(FR) L'invention concerne un procédé de régulation d'un puits dans une structure géologique, le puits comprenant : une première colonne de tubage (12a), et une seconde colonne de tubage (12b) au moins partiellement à l'intérieur de la première colonne de tubage définissant ainsi un premier espace annulaire inter-tube entre elles. Un dispositif de régulation d'écoulement de fluide primaire (16a), tel qu'une valve pouvant être commandée sans fil, est disposé dans la seconde colonne de tubage (12b) pour assurer une communication fluidique entre le premier espace annulaire inter-tube (14a) et un alésage (14b) de la seconde colonne de tubage (12b). En cas d'éruption de puits, un puits d'intervention (40) peut être foré et un trajet de communication fluidique formé entre le puits d'intervention et la première colonne de tubage du puits plutôt que de s'étendre vers des sections inférieures et/ou plus étroites du tube. Un fluide de neutralisation peut ensuite être introduit par l'intermédiaire du puits d'intervention (40) et du dispositif de régulation d'écoulement de fluide primaire (16a) utilisé pour diriger un fluide vers le second alésage de tube (14b). D'autres colonnes de tubage (12c) peuvent faire partie du puits, et comprendre des dispositifs de régulation d'écoulement correspondants (16b), permettant au fluide de neutralisation de s’écouler vers le bas du puits pour le réguler. Par conséquent, le temps nécessaire pour forer un puits d'intervention jusqu'à une profondeur moins profonde que dans les procédés classiques peut réduire le temps et le coût de régulation du puits et atténuer l'impact environnemental de la perte d'hydrocarbures provoquée par l'éruption.
front page image
Estados designados: AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DJ, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JO, JP, KE, KG, KH, KN, KP, KR, KW, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW
Organización Regional Africana de la Propiedad Intelectual (ORAPI) (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW)
Organización Eurasiática de Patentes (OEAP) (AM, AZ, BY, KG, KZ, RU, TJ, TM)
Oficina Europea de Patentes (OEP) (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR)
Organización Africana de la Propiedad Intelectual (OAPI) (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG)
Idioma de publicación: Inglés (EN)
Idioma de la solicitud: Inglés (EN)