Processing

Please wait...

Settings

Settings

Goto Application

1. WO2022116823 - SEMI-SUBMERSIBLE LIFTING AND DISASSEMBLY PLATFORM AND CONTROL METHOD THEREFOR

Publication Number WO/2022/116823
Publication Date 09.06.2022
International Application No. PCT/CN2021/131129
International Filing Date 17.11.2021
IPC
B63B 35/44 2006.1
BPERFORMING OPERATIONS; TRANSPORTING
63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
35Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
B63B 27/10 2006.1
BPERFORMING OPERATIONS; TRANSPORTING
63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
27Arrangement of ship-based loading or unloading equipment for cargo or passengers
10of cranes
CPC
B63B 27/10
BPERFORMING OPERATIONS; TRANSPORTING
63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
27Arrangement of ship-based loading or unloading equipment for cargo or passengers
10of cranes
B63B 35/44
BPERFORMING OPERATIONS; TRANSPORTING
63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
35Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
Y02E 10/727
YSECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
10Energy generation through renewable energy sources
70Wind energy
727Offshore wind turbines
Applicants
  • 招商局重工(江苏)有限公司 CHINA MERCHANTS HEAVY INDUSTRY (JIANGSU) CO., LTD. [CN]/[CN]
  • 江苏科技大学 JIANGSU UNIVERSITY OF SCIENCE AND TECHNOLOGY [CN]/[CN]
  • 招商局重工(深圳)有限公司 CHINA MERCHANTS HEAVY INDUSTRY (SHENZHEN) CO., LTD. [CN]/[CN]
  • 招商局海洋装备研究院有限公司 CHINA MERCHANTS MARINE AND OFFSHORE RESEARCH INSTITUTE CO., LTD. [CN]/[CN]
Inventors
  • 刘建成 LIU, Jiancheng
  • 吴海建 WU, Haijian
  • 朱永梅 ZHU, Yongmei
  • 郑和辉 ZHENG, Hehui
  • 陈伶翔 CHEN, Lingxiang
  • 何力 HE, Li
  • 陈赟 CHEN, Yun
  • 张建 ZHANG, Jian
  • 唐文献 TANG, Wenxian
  • 殷宝吉 YIN, Baoji
Agents
  • 南京正联知识产权代理有限公司 NANJING ZHENGLIAN INTELLECTUAL PROPERTY AGENCY CO., LTD.
Priority Data
202011406839.704.12.2020CN
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) SEMI-SUBMERSIBLE LIFTING AND DISASSEMBLY PLATFORM AND CONTROL METHOD THEREFOR
(FR) PLATEFORME DE LEVAGE ET DE DÉMONTAGE SEMI-SUBMERSIBLE ET PROCÉDÉ DE COMMANDE ASSOCIÉ
(ZH) 一种半潜式起重拆解平台及其控制方法
Abstract
(EN) A semi-submersible lifting and disassembly platform and a control method therefor. The platform comprises a larboard floating body (102), a starboard floating body (101), two larboard poles (202), two starboard poles (201), and a deck box (3); both the larboard floating body (102) and the starboard floating body (101) are provided with several normal ballast tanks (15) and several fast ballast tanks (14); the tops of the fast ballast tanks (14) are in communication with a compressed air ballast system; each of the larboard poles (202) and the starboard poles (201) is provided with a pole-side ballast tank (13); the tops of the pole-side ballast tanks (13) are in communication with the compressed air ballast system; and each of the normal ballast tanks (15), the fast ballast tanks (14), and the pole-side ballast tanks (13) is provided with a water pump ballast system.
(FR) La présente invention concerne une plateforme de levage et de démontage semi-submersible et un procédé de commande associé. La plateforme comprend un corps flottant bâbord (102), un corps flottant tribord (101), deux pôles bâbord (202), deux pôles tribord (201), et une boîte de pont (3) ; à la fois le corps flottant bâbord (102) et le corps flottant tribord (101) sont pourvus de plusieurs réservoirs de ballast normaux (15) et de plusieurs réservoirs de ballast rapides (14) ; les sommets des réservoirs de ballast rapides (14) sont en communication avec un système de ballast d'air comprimé ; chacun des pôles bâbord (202) et des pôles tribord (201) est pourvu d'un réservoir de ballast côté pôle (13) ; les sommets des réservoirs de ballast côté pôle (13) sont en communication avec le système de ballast à air comprimé ; et chacun des réservoirs de ballast normaux (15), des réservoirs de ballast rapides (14), et des réservoirs de ballast côté pôle (13) étant pourvus d'un système de ballast de pompe à eau.
(ZH) 一种半潜式起重拆解平台及其控制方法,平台包括左舷浮体(102)、右舷浮体(101)、两个左舷立柱(202)、两个右舷立柱(201)、甲板盒(3),左舷浮体(102)与右舷浮体(101)中均布置有若干普通压载水舱(15)及若干快速压载水舱(14),快速压载水舱(14)顶部与压缩空气压载系统连通,左舷立柱(202)、右舷立柱(201)中分别设置有柱边压载水舱(13),柱边压载水舱(13)顶部与压缩空气压载系统连通;普通压载水舱(15)、快速压载水舱(14)以及柱边压载水舱(13)上都设有水泵压载系统。
Latest bibliographic data on file with the International Bureau