1. WO2022001974 - JOINT BALL-BASED RATABLE FIXING APPARATUS FOR ARCH TRUSS, AND ARCH TRUSS MOUNTING SYSTEM

Publication Number WO/2022/001974
Publication Date 06.01.2022
International Application No. PCT/CN2021/102814
International Filing Date 28.06.2021
IPC
E04B 1/19 2006.1
EFIXED CONSTRUCTIONS
04BUILDING
BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
1Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
19Three-dimensional framework structures
E04B 1/58 2006.1
EFIXED CONSTRUCTIONS
04BUILDING
BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
1Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
38Connections for building structures in general
58of bar-shaped building elements
E04B 1/35 2006.1
EFIXED CONSTRUCTIONS
04BUILDING
BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
1Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
35Extraordinary methods of construction, e.g. lift-slab, jack-block
E04G 21/14 2006.1
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
21Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
14Conveying or assembling building elements
E04G 21/16 2006.1
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
21Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
14Conveying or assembling building elements
16Tools or apparatus
Applicants
  • 中建新疆安装工程有限公司 CHINA CONSTRUCTION XINJIANG INSTALLATION ENGINEERING CO., LTD. [CN]/[CN]
Inventors
  • 李庆同 LI, Qingtong
  • 铁木热 TIEMU, Re
  • 陈文军 CHEN, Wenjun
  • 张天琴 ZHANG, Tianqin
Agents
  • 北京方圆嘉禾知识产权代理有限公司 BEIJING FINELAND IP FIRM
Priority Data
202010597493.728.06.2020CN
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) JOINT BALL-BASED RATABLE FIXING APPARATUS FOR ARCH TRUSS, AND ARCH TRUSS MOUNTING SYSTEM
(FR) APPAREIL DE FIXATION ROTATIF À BASE DE BILLE D'ARTICULATION POUR TREILLIS DE CINTRE, ET SYSTÈME DE MONTAGE DE TREILLIS DE CINTRE
(ZH) 一种拱形网架节点球转动固定装置及拱形网架安装系统
Abstract
(EN) The present invention relates to the technical field of architectural engineering. Disclosed are a joint ball-based rotating fixation apparatus for an arch truss, and an arch truss mounting system, mainly aiming at reducing a danger coefficient of arch truss mounting construction. The main technical solution of the present invention is a joint ball-based rotating fixation apparatus for an arch truss. The apparatus comprises: a base, a fixing part, and a rotating part. The fixing part comprises a recess body, a first vertical plate, and a second vertical plate; the recess body, the first vertical plate, and the second vertical plate are respectively connected to the base; the opening of the recess body inclines upwardly; the first vertical plate and the second vertical plate are respectively located on opposite sides of the recess body; the first vertical plate is provided with a first through hole, and the second vertical plate is provided with a second through hole, wherein the first though hole and the second through hole are provided opposite to each other. The rotating part comprises a first rod member, a rotating ball, and a second rod member which are sequentially and fixedly connected; the rotating ball is placed in the recess body; the first rod member is rotatably connected to the first through hole, and the second rod member is rotatably connected to the second through hole.
(FR) La présente invention se rapporte au domaine technique de l’ingénierie architecturale. L'invention concerne un appareil de fixation rotatif à base de bille d'articulation pour un treillis de cintre, et un système de montage de treillis de cintre, visant principalement à réduire un coefficient de danger de la construction de montage de treillis de cintre. La solution technique principale de la présente invention est un appareil de fixation rotatif à base de bille d'articulation pour un treillis de cintre. L'appareil comprend : une base, une partie de fixation, et une partie rotative. La partie de fixation comprend un corps d'évidement, une première plaque verticale et une seconde plaque verticale ; le corps d'évidement, la première plaque verticale et la seconde plaque verticale sont respectivement reliés à la base ; l'ouverture du corps creux s'incline vers le haut ; la première plaque verticale et la seconde plaque verticale sont respectivement situées sur des côtés opposés du corps d'évidement ; la première plaque verticale est pourvue d'un premier trou traversant, et la seconde plaque verticale est pourvue d'un second trou traversant, le premier trou traversant et le second trou traversant étant disposés à l'opposé l'un de l'autre. La partie rotative comprend un premier élément de tige, une bille rotative et un second élément de tige qui sont reliés de manière séquentielle et fixe ; la bille rotative est placée dans le corps d'évidement ; le premier élément de tige est relié de façon rotative au premier trou traversant, et le second élément de tige est relié de façon rotative au second trou traversant.
(ZH) 本发明公开了一种拱形网架节点球转动固定装置及拱形网架安装系统,涉及建筑工程技术领域,主要目的是降低拱形网架安装施工的危险系数。本发明的主要技术方案为:拱形网架节点球转动固定装置,该装置包括:底座、固定部和转动部;固定部包括凹槽体、第一立板和第二立板,凹槽体、第一立板和第二立板分别连接于底座,凹槽体的槽口倾斜朝上,第一立板和第二立板分别位于凹槽体的相对侧,第一立板设有第一通孔,第二立板设有第二通孔,第一通孔和第二通孔相对设置;转动部包括依次固定连接的第一杆件、转动球和第二杆件,转动球放置于凹槽体内,第一杆件转动连接于第一通孔,第二杆件转动连接于第二通孔。