Processing

Please wait...

Settings

Settings

Goto Application

1. WO2022001662 - METHOD FOR CONTROLLING SWITCHING-OFF AND SWITCHING-ON OF CIRCUIT BREAKER, AND CIRCUIT BREAKER

Publication Number WO/2022/001662
Publication Date 06.01.2022
International Application No. PCT/CN2021/100368
International Filing Date 16.06.2021
IPC
H02H 3/02 2006.1
HELECTRICITY
02GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
3Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition, with or without subsequent reconnection
02Details
H01H 33/59 2006.1
HELECTRICITY
01BASIC ELECTRIC ELEMENTS
HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
33High-tension or heavy-current switches with arc-extinguishing or arc-preventing means
02Details
59Circuit arrangements not adapted to a particular application of the switch and not otherwise provided for, e.g. for ensuring operation of the switch at a predetermined point in the ac cycle
CPC
H02H 3/021
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
3Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection
02Details
021concerning the disconnection itself, e.g. at a particular instant, particularly at zero value of current, disconnection in a predetermined order
Applicants
  • 鑫美地(成都)科技有限公司 XINMEIDI (CHENGDU) TECHNOLOGY CO., LTD [CN]/[CN]
  • 物兴科技(深圳)有限公司 WORTHIOT TECHNOLOGY (SHENZHEN) CO., LTD [CN]/[CN]
Inventors
  • 侯庆全 HOU, Qingquan
  • 张潮海 ZHANG, Chaohai
Agents
  • 深圳市君胜知识产权代理事务所(普通合伙) JOHNSON INTELLECTUAL PROPERTY AGENCY (SHENZHEN)
Priority Data
202010625151.102.07.2020CN
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) METHOD FOR CONTROLLING SWITCHING-OFF AND SWITCHING-ON OF CIRCUIT BREAKER, AND CIRCUIT BREAKER
(FR) PROCÉDÉ DE COMMANDE D'ACTIVATION ET DE DÉSACTIVATION DE DISJONCTEUR, ET DISJONCTEUR
(ZH) 一种断路器分闸、合闸控制方法及断路器
Abstract
(EN) Disclosed are a method for controlling the switching-off and switching-on of a circuit breaker, and a circuit breaker. The method comprises: after an action instruction is received, acquiring a zero-crossing moment of the current working voltage, and determining a target time period according to the zero-crossing moment, wherein the action instruction is a switching-off instruction or a switching-on instruction, and the target time period is a time period, with the zero-crossing moment as the center and in the waveform of the current working voltage, corresponding to a preset voltage value range; calculating a switching-off/switching-on action duration of a switching-off/switching-on mechanism according to the current working voltage; determining a switching-off/switching-on start moment according to the target time period and the switching-off/switching-on action duration, and controlling the switching-off/switching-on mechanism to start performing a switching-off or switching-on action at the switching-off/switching-on start moment, such that a contact arc discharge process is completed within the target time period. By means of the present invention, the switching-off or switching-on of a circuit breaker can be realized in a low-voltage interval at a zero-crossing moment, such that the voltage between contacts is in a low voltage difference state, thereby reducing contact arc discharge losses.
(FR) Procédé de commande de l'activation et de la désactivation d'un disjoncteur, et disjoncteur. Le procédé consiste à : après réception d'une instruction d'action, acquérir un moment de passage par zéro de la tension de travail actuelle, et déterminer une période de temps cible en fonction du moment de passage par zéro, l'instruction d'action étant une instruction de désactivation ou une instruction d'activation, et la période de temps cible étant une période de temps, avec le moment de passage par zéro comme centre et dans la forme d'onde de la tension de travail actuelle, correspondant à une plage de valeurs de tension prédéfinie; calculer une durée d'action de désactivation/activation un mécanisme de désactivation/activation en fonction de la tension de travail actuelle; déterminer un moment de début de désactivation/activation en fonction de la période de temps cible et de la durée d'action de désactivation/activation, et commander le mécanisme de désactivation/activation pour démarrer l'exécution d'une action de désactivation ou d'activation au moment de début de désactivation/activation, de telle sorte qu'un processus de décharge d'arc de contact est réalisé dans la période de temps cible. À l'aide de la présente invention, la désactivation ou l'activation d'un disjoncteur peut être réalisée dans un intervalle de basse-tension à un moment de passage par zéro, de telle sorte que la tension entre les contacts se trouve dans un état de différence de basse-tension, ce qui permet de réduire les pertes de décharge d'arc de contact.
(ZH) 本发明公开了一种断路器分闸、合闸控制方法及断路器,所述方法包括:在接收动作指令后,获取当前工作电压的过零点时刻,根据过零点时刻确定目标时段,其中,所述动作指令为分闸指令或合闸指令,所述目标时段为所述当前工作电压的波形中以过零点时刻为中心的预设电压值范围对应的时间段;根据所述当前工作电压计算分合闸机构的分合闸动作时长;根据所述目标时段以及所述分合闸动作时长确定分合闸开始时刻,并在所述分合闸开始时刻控制所述分合闸机构开始执行分闸或合闸动作,以使得触点拉弧过程在所述目标时段内完成。本发明可以实现断路器在过零点时刻的低电压区间实现分闸或合闸,使得触点之间的电压处于低压差状态,降低触点拉弧损耗。
Related patent documents
Latest bibliographic data on file with the International Bureau