Processing

Please wait...

PATENTSCOPE will be unavailable a few hours for maintenance reason on Tuesday 25.01.2022 at 9:00 AM CET
Settings

Settings

Goto Application

1. WO2022001169 - HIGHWAY-RAILWAY DUAL-PURPOSE TRACK-LAYING MACHINE FOR URBAN RAIL TRANSIT ENGINEERING

Publication Number WO/2022/001169
Publication Date 06.01.2022
International Application No. PCT/CN2021/080184
International Filing Date 11.03.2021
IPC
E01B 29/16 2006.1
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
29Laying, rebuilding, or taking-up tracks; Tools or machines therefor
16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
Applicants
  • 中铁上海工程局集团有限公司 SHANGHAI CIVIL ENGINEERING CO., LTD OF CREC [CN]/[CN]
  • 中铁上海工程局集团华海工程有限公司 HUAHAI ENGINEERING CO., LTD OF CREC SHANGHAI [CN]/[CN]
  • 中铁上海工程局集团(苏州)轨道交通科技研究院有限公司 (SUZHOU) RAIL TRANSIT SCIENCE AND THCHNOLOGY RESEARCH INSTITUTE CO., LTD SHANGHAI CIVIL ENGINEERING GROUP OF RCEC [CN]/[CN]
Inventors
  • 赵文君 ZHAO, Wenjun
  • 段德荣 DUAN, Derong
  • 徐明发 XU, Mingfa
  • 郑康海 ZHENG, Kanghai
  • 徐修发 XU, Xiufa
  • 王保凤 WANG, Baofeng
Agents
  • 上海三方专利事务所(普通合伙) SHANGHAI SANFANG PATENT LAW OFFICE
Priority Data
202021207802.728.06.2020CN
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) HIGHWAY-RAILWAY DUAL-PURPOSE TRACK-LAYING MACHINE FOR URBAN RAIL TRANSIT ENGINEERING
(FR) MACHINE DE POSE DE VOIE À DOUBLE USAGE FERROVIAIRE POUR L'INGÉNIERIE DE TRANSIT DE RAILS URBAINS
(ZH) 一种城市轨道交通工程公铁两用铺轨机
Abstract
(EN) A highway-railway dual-purpose track-laying machine for an urban rail transit engineering, comprising a framework structure, a traveling mechanism, and a hoisting system. The framework structure comprises a framework; the framework comprises a side framework structure and an upper connection framework structure; the side framework structure comprises a lower fixed structure and an upper movable structure; the upper movable structure can stretch out and draw back with respect to the lower fixed structure; the upper connection framework structure comprises a fixed structure and a movable structure; the movable structure can stretch out and draw back with respect to the fixed structure; the traveling mechanism is connected to the framework structure and used for achieving the movement of the framework structure; and the hoisting system is provided on the framework structure and used for hoisting. The combined structure of the track-laying machine is simple and feasible; the traveling and track gauge change structure of the highway-railway dual-purpose track-laying machine for the urban rail transit engineering and a structure for achieving whole machine span change are separately designed, and the traveling mechanism is designed to be a height and position adjustable structure, and thus, corresponding change requirements can be realized according to working condition requirements.
(FR) L'invention porte sur une machine de pose de voie à double usage ferroviaire pour une ingénierie de transit de rails urbains, laquelle machine comprend une structure cadre, un mécanisme de déplacement et un système de levage. La structure de cadre comprend un cadre; le cadre comprend une structure de cadre latérale et une structure de cadre de raccordement supérieure; la structure de cadre latérale comprend une structure fixe inférieure et une structure mobile supérieure; la structure mobile supérieure peut s'étirer et se rétracter par rapport à la structure fixe inférieure; la structure de cadre de connexion supérieure comprend une structure fixe et une structure mobile; la structure mobile peut s'étirer et se rétracter par rapport à la structure fixe; le mécanisme de déplacement est relié à la structure de cadre et est utilisé pour réaliser le mouvement de la structure de cadre; et le système de levage est disposé sur la structure de cadre et est utilisé pour le levage. La structure combinée de la machine de pose de voie est simple et réalisable; la structure de changement de gabarit de déplacement et de voie de la machine de pose de voie à double usage ferroviaire pour l'ingénierie de transport de rails urbains et une structure pour réaliser un changement de portée de machine toute entière sont conçues séparément, et le mécanisme de déplacement est conçu pour être une structure réglable en hauteur et en position; ainsi, des exigences de changement correspondantes peuvent être réalisées en fonction des exigences de conditions de travail.
(ZH) 一种城市轨道交通工程公铁两用铺轨机,包括框架结构、走行机构和吊装系统,框架结构包括框架,框架包括边框架结构和上部连接框架结构,边框架结构包括下部固定结构和上部活动结构,上部活动结构能相对于下部固定结构伸缩,上部连接框架结构包括固定结构和活动结构,活动结构能相对于固定结构伸缩;走行机构与框架结构相连,用于实现框架结构的移动:吊装系统设置于框架结构上,以用于吊装。该铺轨机组合结构简单可行,将城市轨道交通工程公铁两用铺轨机的走行轨距变化的结构和实现整机变跨的结构分开设计,并将走行机构设计为高度、位置可调结构,能根据工况需要实现相应变化要求。
Related patent documents
Latest bibliographic data on file with the International Bureau