Processing

Please wait...

Settings

Settings

Goto Application

1. WO2021042769 - REFRIGERATOR

Publication Number WO/2021/042769
Publication Date 11.03.2021
International Application No. PCT/CN2020/091852
International Filing Date 22.05.2020
IPC
F25C 5/02 2006.01
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION OR SOLIDIFICATION OF GASES
CPRODUCING, WORKING OR HANDLING ICE
5Working or handling ice
02Apparatus for disintegrating, removing or harvesting ice
F25D 23/12 2006.01
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION OR SOLIDIFICATION OF GASES
DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT COVERED BY ANY OTHER SUBCLASS
23General constructional features
12Arrangements of compartments additional to cooling compartments; Combinations of refrigerators with other equipment, e.g. stove
CPC
F25C 5/02
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
CPRODUCING, WORKING OR HANDLING ICE
5Working or handling ice
02Apparatus for disintegrating, removing or harvesting ice
F25D 21/14
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
21Defrosting; Preventing frosting; Removing condensed or defrost water
14Collecting or removing condensed and defrost water; Drip trays
F25D 23/12
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
23General constructional features
12Arrangements of compartments additional to cooling compartments; Combinations of refrigerators with other equipment, e.g. stove
Applicants
  • 海信容声(广东)冰箱有限公司 HISENSE RONSHEN (GUANGDONG) REFRIGERATOR CO., LTD. [CN]/[CN]
Inventors
  • 翁浩 WENG, Hao
  • 姚惠民 YAO, Huimin
  • 刘小锋 LIU, Xiaofeng
  • 干锦波 GAN, Jinbo
  • 赵子璇 ZHAO, Zixuan
Agents
  • 青岛清泰联信知识产权代理有限公司 QINGDAO LAWSCI INTELLECTUAL PROPERTY CO., LTD.
Priority Data
201910829072.X03.09.2019CN
201910829074.903.09.2019CN
201910829087.603.09.2019CN
201921454615.603.09.2019CN
201921454625.X03.09.2019CN
201921455414.803.09.2019CN
PCT/CN2019/10480806.09.2019CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) REFRIGERATOR
(FR) RÉFRIGÉRATEUR
(ZH) 一种冰箱
Abstract
(EN)
Disclosed is a refrigerator (1), comprising a refrigerating chamber (10a), wherein an ice-making chamber (100) is arranged in the refrigerating chamber (10a); an ice maker (120) and an ice-making fan compartment (150) are arranged in the ice-making chamber (100); the ice-making chamber (100) comprises an ice-making chamber front side wall (118); a first ice baffle (170) and a second ice baffle (180) are arranged on the ice-making chamber front side wall (118); a first ventilation opening (171) is provided in the first ice baffle (170); and a second ventilation opening (181) is provided in the second ice baffle (180).
(FR)
L'invention concerne un réfrigérateur (1), comprenant une chambre de réfrigération (10a). Une chambre de fabrication de glace (100) est disposée dans la chambre de réfrigération (10a) ; une machine à glaçons (120) et un compartiment de ventilateur de fabrication de glace (150) sont disposés dans la chambre de fabrication de glace (100) ; la chambre de fabrication de glace (100) comprend une paroi latérale avant de chambre de fabrication de glace (118) ; un premier déflecteur de glace (170) et un second déflecteur de glace (180) sont disposées sur la paroi latérale avant de la chambre de fabrication de glace (118) ; une première ouverture de ventilation (171) est disposée dans le premier déflecteur de glace (170) ; et une seconde ouverture de ventilation (181) est disposée dans le second déflecteur de glace (180).
(ZH)
一种冰箱(1),包括冷藏室(10a),冷藏室(10a)内设置有制冰室(100),制冰室(100)内设置有制冰机(120)和制冰风扇间室(150),制冰室(100)包括制冰室前侧壁(118),制冰室前侧壁(118)上设置有第一挡冰板(170)和第二挡冰板(180),第一挡冰板(170)上设置有第一通风口(171),第二挡冰板(180)上设置有第二通风口(181)。
Latest bibliographic data on file with the International Bureau