Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020181707 - METHOD FOR MULTIPLE DIRECTION OVERPASS INTERCHANGE, ROAD SYSTEM, AND TRAFFIC FLOW

Publication Number WO/2020/181707
Publication Date 17.09.2020
International Application No. PCT/CN2019/098031
International Filing Date 26.07.2019
IPC
E01C 1/04 2006.01
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
1Design or layout of roads, e.g. for noise abatement, for gas absorption
04Road crossings on different levels; Interconnections between roads on different levels
CPC
E01C 1/00
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
1Design or layout of roads, e.g. for noise abatement, for gas absorption
E01C 1/02
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
1Design or layout of roads, e.g. for noise abatement, for gas absorption
02Crossings, junctions or interconnections between roads on the same level
E01C 1/04
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
1Design or layout of roads, e.g. for noise abatement, for gas absorption
04Road crossings on different levels; Interconnections between roads on different levels
E03C 1/04
EFIXED CONSTRUCTIONS
03WATER SUPPLY; SEWERAGE
CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
1Domestic plumbing installations for fresh water or waste water; Sinks
02Plumbing installations for fresh water
04Water-basin installations specially adapted to wash-basins or baths
Applicants
  • 都快通(北京)交通疏导设备有限公司 DU KUAI TONG (BEIJING) TRAFFIC DISPERSION EQUIPMENT CO., LTD. [CN]/[CN]
Inventors
  • 张惠东 ZHANG, Huidong
Agents
  • 中国专利代理(香港)有限公司 CHINA PATENT AGENT (H.K.) LTD.
Priority Data
201910179130.911.03.2019CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) METHOD FOR MULTIPLE DIRECTION OVERPASS INTERCHANGE, ROAD SYSTEM, AND TRAFFIC FLOW
(FR) MÉTHODE DESTINÉE À UN ÉCHANGEUR À PONT D'ÉTAGEMENT À DIRECTIONS MULTIPLES, UN RÉSEAU ROUTIER ET UN COURANT DE CIRCULATION
(ZH) 用于多个道路方向的立交桥、道路系统以及道路行车方法
Abstract
(EN)
A method for a multiple direction overpass interchange, road system, and traffic flow. The overpass interchange comprises a primary intersection having a primary central portion and four pairs of primary channels and a secondary intersection having a secondary central portion and four pairs of secondary channels. A primary uphill channel in each pair of primary channels communicates, in a clockwise or counterclockwise direction, with a primary downhill channel in an adjacent pair of primary channels, and a secondary uphill channel in each pair of secondary channels communicates, in the opposite direction, with a secondary downhill channel in an adjacent pair of secondary channels. A primary uphill channel and a primary downhill channel in each pair of primary channels are respectively adjacent to a primary uphill channel in an adjacent pair of primary channels and a primary downhill channel in another adjacent pair of primary channels, and a secondary uphill channel and a secondary downhill channel in each pair of secondary channels are respectively adjacent to a secondary uphill channel in an adjacent pair of secondary channels and a secondary downhill channel in another adjacent pair of secondary channels.
(FR)
L'invention concerne une méthode destinée à un échangeur à pont d'étagement à directions multiples, un réseau routier et un courant de circulation. L'échangeur à pont d'étagement comprend une intersection primaire ayant une partie centrale primaire et quatre paires de canaux primaires et une intersection secondaire ayant une partie centrale secondaire et quatre paires de canaux secondaires. Un canal amont primaire dans chaque paire de canaux primaires communique, dans le sens des aiguilles d'une montre ou dans le sens inverse des aiguilles d'une montre, avec un canal aval primaire dans une paire adjacente de canaux primaires, et un canal amont secondaire dans chaque paire de canaux secondaires communique, dans la direction opposée, avec un canal aval secondaire dans une paire adjacente de canaux secondaires. Un canal amont primaire et un canal aval primaire dans chaque paire de canaux primaires sont respectivement adjacents à un canal amont primaire dans une paire adjacente de canaux primaires et un canal aval primaire dans une autre paire adjacente de canaux primaires, et un canal amont secondaire et un canal aval secondaire dans chaque paire de canaux secondaires sont respectivement adjacents à un canal amont secondaire dans une paire adjacente de canaux secondaires et un canal aval secondaire dans une autre paire adjacente de canaux secondaires.
(ZH)
用于多个道路方向的立交桥、道路系统以及道路行车方法。该立交桥包括具有主中央部和四对主通道的主交叉口以及具有副中央部和四对副通道的副交叉口。每一对主通道中的主上行通道在顺时针方向和逆时针方向中的一个方向上与相邻的一对主通道中的主下行通道连通,并且每一对副通道中的副上行通道在另一个方向上与相邻的一对副通道中的副下行通道连通。每一对主通道中的主上行通道和主下行通道分别与相邻的一对主通道中的主上行通道和相邻的另一对主通道中的主下行通道相邻,并且每一对副通道中的副上行通道和副下行通道分别与相邻的一对副通道中的副上行通道和相邻的另一对副通道中的副下行通道相邻。
Latest bibliographic data on file with the International Bureau