Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020133972 - HIGH-PRECISION AUTOMATIC POSITIONING AND VERTICALITY ADJUSTMENT SYSTEM FOR ULTRA-LONG STEEL COLUMN BY REVERSE CONSTRUCTION METHOD AND CONSTRUCTION METHOD

Publication Number WO/2020/133972
Publication Date 02.07.2020
International Application No. PCT/CN2019/092623
International Filing Date 25.06.2019
IPC
E04G 21/18 2006.01
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
21Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
14Conveying or assembling building elements
16Tools or apparatus
18Adjusting tools; Templates
CPC
E04G 21/18
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
21Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
14Conveying or assembling building elements
16Tools or apparatus
18Adjusting tools; Templates
Applicants
  • 上海建工集团股份有限公司 SHANGHAI CONSTRUCTION GROUP CO., LTD. [CN]/[CN]
Inventors
  • 顾国明 GU, Guoming
  • 杨德生 YANG, Desheng
Priority Data
201811621905.528.12.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) HIGH-PRECISION AUTOMATIC POSITIONING AND VERTICALITY ADJUSTMENT SYSTEM FOR ULTRA-LONG STEEL COLUMN BY REVERSE CONSTRUCTION METHOD AND CONSTRUCTION METHOD
(FR) SYSTÈME DE POSITIONNEMENT AUTOMATIQUE ET DE RÉGLAGE DE VERTICALITÉ DE HAUTE PRÉCISION POUR POTEAU D'ACIER ULTRA-LONG PAR UN PROCÉDÉ DE CONSTRUCTION INVERSE ET PROCÉDÉ DE CONSTRUCTION
(ZH) 逆作法超长钢柱高精度的自动定位调垂系统及施工方法
Abstract
(EN)
An automatic positioning and verticality adjustment system (100) and a construction method therefor, comprising a support (110), an automatic positioning and clamping device (120), a first detection device, an adjustment device (130) and a control device. The support (110) comprises a first platform (111) having a first through hole (1111) and a second platform (112) having a second through hole (1121); the first detection device detects vertical status information of an ultra-long steel column (200); the adjustment device (130) is used to adjust the position of the ultra-long steel column (200); and the construction method comprises the steps of placing the ultra-long steel column (200) into a pile hole, placing the support (110), clamping the ultra-long steel column (200) by means of the automatic positioning and clamping device (120), detecting the vertical state information by means of the first detection device, controlling the movement of the adjustment device (130) by means of the control device, and so on. The present automatic positioning and verticality adjustment system (100) may achieve the high-precision control of the position, axis positioning and verticality of the ultra-long steel column.
(FR)
Système de positionnement automatique et de réglage de verticalité (100) et son procédé de construction, comprenant un support (110), un dispositif de positionnement et de serrage automatique (120), un premier dispositif de détection, un dispositif de réglage (130) et un dispositif de commande. Le support (110) comprend une première plateforme (111) ayant un premier trou traversant (1111) et une seconde plateforme (112) ayant un second trou traversant (1121); le premier dispositif de détection détecte des informations d'état vertical d'un poteau d'acier ultra-long (200); le dispositif de réglage (130) est utilisé pour ajuster la position du poteau d'acier ultra-long (200); et le procédé de construction comprend les étapes consistant à placer le poteau d'acier ultra-long (200) dans un trou de pile, à placer le support (110), à serrer le poteau d'acier ultra-long (200) au moyen du dispositif de positionnement et de serrage automatique (120), à détecter les informations d'état vertical au moyen du premier dispositif de détection, à commander le mouvement du dispositif de réglage (130) au moyen du dispositif de commande, et ainsi de suite. Le présent système de positionnement automatique et de réglage de verticalité peut réaliser la commande de haute précision de la position, du positionnement d'axe et de la verticalité du poteau d'acier ultra-long.
(ZH)
一种自动定位调垂系统(100)及其施工方法,包括支架(110)、自动定位夹紧装置(120)、第一检测装置、调整装置(130)及控制装置;支架(110)包括具有第一通孔(1111)的第一平台(111)和具有第二通孔(1121)的第二平台(112);第一检测装置检测超长钢柱(200)的垂直状态信息;调整装置(130)用于调整超长钢柱(200)的位置;该施工方法包括将超长钢柱(200)放入桩孔、放置支架(110)、通过自动定位夹紧装置(120)夹紧超长钢柱(200)、通过第一检测装置检测垂直状态信息、通过控制装置控制调整装置(130)运动等步骤。该自动定位调垂系统(100)能够实现对超长钢柱的位置、轴线定位和垂直度的高精度控制。
Also published as
Latest bibliographic data on file with the International Bureau