1. WO2020114178 - PILE DRIVER CONSTRUCTION PILE DRIVING REAL-TIME OVERFILLING ALARM METHOD

Publication Number WO/2020/114178
Publication Date 11.06.2020
International Application No. PCT/CN2019/115789
International Filing Date 05.11.2019
IPC
G01B 7/26 2006.01
GPHYSICS
01MEASURING; TESTING
BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
7Measuring arrangements characterised by the use of electric or magnetic means
26for measuring depth
CPC
G01B 7/26
GPHYSICS
01MEASURING; TESTING
BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
7Measuring arrangements characterised by the use of electric or magnetic means
26for measuring depth
G08B 7/06
GPHYSICS
08SIGNALLING
BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
7Signalling systems according to more than one of groups G08B3/00-G08B6/00; Personal calling systems according to more than one of groups G08B3/00-G08B6/00
06using electric transmission ; , e.g. involving audible and visible signalling through the use of sound and light sources
Applicants
  • 南京天辰礼达电子科技有限公司 NANJING GALLOP-SKY ELECTRONIC TECHNOLOGY CO., LTD. [CN]/[CN]
Inventors
  • 沈礼伟 SHEN, Liwei
  • 高嘉明 GAO, Jiaming
  • 姜智耀 JIANG, Zhiyao
  • 刘理想 LIU, Lixiang
  • 陈文学 CHEN, Wenxue
Agents
  • 南京九致知识产权代理事务所(普通合伙) NANJING JIUZHI INTELLECTUAL PROPERTY FIRM (GENERAL PARTNERSHIP)
Priority Data
201811485256.006.12.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) PILE DRIVER CONSTRUCTION PILE DRIVING REAL-TIME OVERFILLING ALARM METHOD
(FR) PROCÉDÉ D'ALARME DE SURCHARGE EN TEMPS RÉEL DE BATTAGE DE PILE DE CONSTRUCTION DE MAT DE BATTAGE
(ZH) 一种桩机施工打桩实时超灌报警的方法
Abstract
(EN)
A pile driver construction pile driving real-time overfilling alarm method. An RTK dual-antenna system is mounted on a pile driver, and a current main and secondary antenna height difference is calculated by means of AVR data output by the RTK dual-antenna system; depth information of a pile head is calculated in combination with the size and orientation information of the pile driver, and the current pile depth is displayed in software; a pile depth value is monitored in real time during pile pulling; when a critical value is reached, an operator is prompted and warned in the form of audible and visual alarm and screen flickering. The method is user-oriented and realizes the accurate control of the pile driving depth of the pile driver in the whole process of piling, reduces errors of human determining of the pile depth, improves the construction quality of the project, and improves the construction technology level.
(FR)
L'invention concerne un procédé d'alarme de surcharge en temps réel de battage de pile de construction de mat de battage. Un système à double antenne RTK est monté sur un mat de battage, et une différence de hauteur d'antenne principale et secondaire actuelle est calculée au moyen de données AVR délivrées par le système à double antenne RTK ; des informations de profondeur d'une tête de pile sont calculées en combinaison avec les informations de taille et d'orientation du mat de battage, et la profondeur de pile actuelle est affichée dans un logiciel ; une valeur de profondeur de pile est surveillée en temps réel pendant la traction de la pile ; lorsqu'une valeur critique est atteinte, un opérateur est invité et averti sous la forme d'une alarme sonore et visuelle et d'un clignotement d'écran. Le procédé est orienté vers l'utilisateur et permet la régulation précise de la profondeur de battage du mat de battage dans le processus de battage global, réduit les erreurs de détermination humaine de la profondeur de pile, améliore la qualité de construction du projet, et améliore le niveau de technologie de construction.
(ZH)
一种桩机施工打桩实时超灌报警的方法,采用在打桩机上面安装RTK双天线系统,通过RTK双天线系统输出的AVR数据,计算当前主副天线高度差,结合桩机尺寸,桩机朝向信息,计算出桩头的深度信息,并且在软件内部展示当前桩深,在拔桩时实时监测桩深值,在达到临界值时通过声光报警、屏幕闪烁形式对操作手进行提示与警告,该方法以用户为中心,实现在打桩的全过程中,对于桩机打桩深度的精确把控,减少人为判断桩深的误差,提升工程的施工质量,提高施工工艺水平。