Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020114003 - SHORT PITCH FOR MEASUREMENT WHILE DRILLING

Publication Number WO/2020/114003
Publication Date 11.06.2020
International Application No. PCT/CN2019/101780
International Filing Date 21.08.2019
IPC
E21B 49/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
49Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
E21B 47/026
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
47Survey of boreholes or wells
02Determining slope or direction
026of penetrated ground layers
CPC
E21B 47/026
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
47Survey of boreholes or wells
02Determining slope or direction
026of penetrated ground layers
E21B 49/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
49Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Applicants
  • 贝兹维仪器(苏州)有限公司 BITSWAVE (SUZHOU) CO., LTD [CN]/[CN]
Inventors
  • 刘策 LIU, Ce
  • 姜亚竹 JIANG, Yazhu
Agents
  • 广州三环专利商标代理有限公司 SCIHEAD IP LAW FIRM
Priority Data
201811478648.405.12.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) SHORT PITCH FOR MEASUREMENT WHILE DRILLING
(FR) PAS COURT DE MESURE LORS DU FORAGE
(ZH) 一种随钻测量短节
Abstract
(EN)
A short pitch for measurement while drilling, comprising an integrated housing (100), a circuit connection pipe (200), a probe pipe component (300), a resistivity test component, a power supply component, a first control circuit element (410), and a second control circuit element (420). The integrated housing (100) comprises a hollow cavity. Several horizontal grooves (120) are circumferentially arranged on outer side walls on both ends of the integrated housing (100). The resistivity test component is provided in the horizontal groove (120). Several grooves (110) are circumferentially arranged on outer side walls in the middle of the integrated housing (100). The probe pipe component (300), the power supply component, and the first control circuit element (410) are provided in the grooves (110), respectively. The circuit connection pipe (200) is detachably connected in the hollow cavity of the integrated housing (100). N circuit board grooves (210) are uniformly and circumferentially arranged on an outer wall of the circuit connection pipe (200). The second control circuit element (420) comprises N circuit boards (421) matching the circuit board grooves (210). The short pitch for measurement while drilling can measure the parameter of a stratum where a drill bit is located in near real time, is small in size, is compact in structure, is easy to disassemble, and is low in production costs.
(FR)
L'invention concerne un pas court de mesure lors du forage, comprenant un boîtier intégré (100), un tuyau de raccordement de circuit (200), un composant de tuyau de sonde (300), un composant d'essai de résistivité, un composant d'alimentation électrique, un premier élément de circuit de commande (410) et un second élément de circuit de commande (420). Le boîtier intégré (100) comprend une cavité creuse. Plusieurs rainures horizontales (120) sont disposées circonférentiellement sur des parois latérales extérieures sur les deux extrémités du boîtier intégré (100). Le composant d'essai de résistivité est disposé dans la rainure horizontale (120). Plusieurs rainures (110) sont disposées circonférentiellement sur des parois latérales extérieures au milieu du boîtier intégré (100). Le composant de tuyau de sonde (300), le composant d'alimentation électrique et le premier élément de circuit de commande (410) sont respectivement disposés dans les rainures (110). Le tuyau de raccordement de circuit (200) est raccordé de manière amovible dans la cavité creuse du boîtier intégré (100). N rainures de cartes de circuits imprimés (210) sont disposées uniformément et circonférentiellement sur une paroi externe du tuyau de raccordement de circuit (200). Le second élément de circuit de commande (420) comprend N cartes de circuits imprimés (421) correspondant aux rainures de cartes de circuits imprimés (210). Le pas court de mesure lors du forage peut mesurer le paramètre d'une strate où se trouve un trépan en temps quasi réel, est de petite taille, a une structure compacte, est facile à démonter et présente des coûts modérés de production.
(ZH)
一种随钻测量短节,包括集成外壳(100)、电路对接管(200)、探管组件(300)、电阻率测试组件、电源组件、第一控制电路元件(410)和第二控制电路元件(420);集成外壳(100)具有中空内腔,集成外壳(100)两端的外侧壁上沿周向布置有若干一字槽(120),电阻率测试组件设置在一字槽(120)内,集成外壳(100)中部的外侧壁上沿周向布置有若干凹槽(110),探管组件(300)、电源组件和第一控制电路元件(410)分别设置在凹槽(110)内;电路对接管(200)可拆卸连接在集成外壳(100)的中空内腔中,电路对接管(200)的外壁上沿周向均匀布置有N个线板凹槽(210),第二控制电路元件(420)包括N块电路板(421),电路板(421)与线板凹槽(210)配合。该随钻测量短节近乎实时的测得钻头所在地层的参数,其尺寸较小,结构紧凑,易于拆装且生产成本低。
Also published as
Latest bibliographic data on file with the International Bureau