Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020113914 - PROCESS FOR IMPROVING HEAT PRODUCTION CAPACITY OF GEOTHERMAL WELL

Publication Number WO/2020/113914
Publication Date 11.06.2020
International Application No. PCT/CN2019/088844
International Filing Date 28.05.2019
Chapter 2 Demand Filed 16.01.2020
IPC
E21B 43/26 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
25Methods for stimulating production
26by forming crevices or fractures
E21B 33/13 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
33Sealing or packing boreholes or wells
10in the borehole
13Methods or devices for cementing, for plugging holes, crevices, or the like
F24T 10/17 2018.01
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
24HEATING; RANGES; VENTILATING
TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
10Geothermal collectors
10with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
13using tube assemblies suitable for insertion into boreholes in the ground, e.g. geothermal probes
17using tubes closed at one end, i.e. return-type tubes
CPC
E21B 33/13
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
33Sealing or packing boreholes or wells
10in the borehole
13Methods or devices for cementing, for plugging holes, crevices, or the like
E21B 43/11
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
11Perforators; Permeators
E21B 43/26
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
25Methods for stimulating production
26by forming crevices or fractures
Applicants
  • 田振林 TIAN, Zhenlin [CN]/[CN]
Inventors
  • 田振林 TIAN, Zhenlin
Agents
  • 深圳市韦恩肯知识产权代理有限公司 WAYNE INTELLECTUAL PROPERTY AGENCY CO., LTD.
Priority Data
201811476503.005.12.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) PROCESS FOR IMPROVING HEAT PRODUCTION CAPACITY OF GEOTHERMAL WELL
(FR) PROCÉDÉ POUR AMÉLIORER LA CAPACITÉ DE PRODUCTION DE CHALEUR D'UN PUITS GÉOTHERMIQUE
(ZH) 提高地热井产热能力的工艺
Abstract
(EN)
A process for improving the heat production capacity of a geothermal well. The process improves the capacity of leading geothermal energy in the rock stratum into a geothermal well by using a heat conduction well cementing technology and an enhanced conductivity fracturing technology, and achieves highly-efficient heat taking and heat exchange utilization by using a spiral plate type condensing section gravity heat pipe heat exchanger. The specific process procedures are as follows: after completing drilling a geothermal well and casing a sleeve pipe (2), carrying out the heat conduction well cementing, that is, injecting thermal insulation cement slurry in a stratum low temperature section, and injecting heat conduction cement slurry into a stratum high temperature section to complete well cementing; after solidification of the heat insulation cement slurry and the heat conduction cement slurry of the well cementing, carrying out segmented perforation and fracturing in the sleeve pipe (2) of the stratum high temperature section, producing cracks in the high temperature rock stratum, and filling the cracks with a heat conduction material to form a heat guiding belt (7) extending from the sleeve pipe (2) to the rock stratum; and finally, mounting a condensing section of the gravity heat pipe heat exchanger (8) connected to the sleeve pipe (2) on the ground to finally form a high-yield geothermal well system in which quick heat transfer in the rock stratum and highly-efficient heat exchange in a well cylinder are achieved.
(FR)
L'invention concerne un procédé d'amélioration de la capacité de production de chaleur d'un puits géothermique. Le procédé améliore la capacité de conduction de l'énergie géothermique dans la strate rocheuse dans un puits géothermique en utilisant une technologie de cimentation de puits à conduction thermique et une technologie de fracturation à conductivité améliorée, et réalise un soutirage de chaleur et une utilisation d'échange de chaleur hautement efficaces en utilisant un échangeur de chaleur à caloduc par gravité à section de condensation de type à plaque en spirale. Les procédures spécifiques du procédé sont les suivantes : après l'achèvement du forage d'un puits géothermique et le cuvelage par un tube de manchon (2), la réalisation de la cimentation de puits à conduction thermique, c'est-à-dire l'injection d'un coulis de ciment d'isolation thermique dans une section à basse température de strate, et l'injection d'un coulis de ciment à conduction thermique dans une section à haute température de strate pour achever la cimentation de puits ; après la solidification du coulis de ciment d'isolation thermique et du coulis de ciment à conduction thermique de la cimentation de puits, la réalisation d'une perforation segmentée et la fracturation dans le tube de manchon (2) de la section à haute température de strate, la production de fissures dans la strate de roche à haute température, et le remplissage des fissures avec un matériau de conduction thermique pour former une ceinture de guidage de chaleur (7) qui s'étend à du tube de manchon (2) jusqu'à la strate de roche ; et enfin, le montage d'une section de condensation de l'échangeur de chaleur à caloduc par gravité (8) relié au tube de manchon (2) sur le sol pour finalement former un système de puits géothermique à haut rendement dans lequel sont obtenus un transfert de chaleur rapide dans la strate de roche et un échange de chaleur hautement efficace dans un cylindre de puits.
(ZH)
一种提高地热井产热能力的工艺,该工艺通过导热固井技术、增导压裂技术来提高岩层中地热能导入地热井的能力,再通过螺旋板式冷凝段重力热管换热器完成高效的取热换热利用。具体的工艺流程如下:完成地热井钻井、下套管(2)后,进行导热固井,即在地层低温段注入隔热水泥浆、在地层高温段注入导热水泥浆完成固井;待固井的隔热水泥浆和导热水泥浆凝固后,在地层高温段的套管(2)内进行分段射孔、压裂,在高温岩层中产生裂缝,并向裂缝内填充导热材料形成从套管(2)延伸到岩层的导热带(7);最后在地面上安装与套管(2)对接的重力热管换热器(8)的冷凝段,最终形成岩层快速传热、井筒高效换热的高产地热井系统。
Also published as
Latest bibliographic data on file with the International Bureau