Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020109853 - OPTIMIZED RESOURCE MANAGEMENT BASED ON PREDICTIVE ANALYTICS

Publication Number WO/2020/109853
Publication Date 04.06.2020
International Application No. PCT/IB2018/059530
International Filing Date 30.11.2018
IPC
H04L 12/801 2013.01
HELECTRICITY
04ELECTRIC COMMUNICATION TECHNIQUE
LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
12Data switching networks
70Packet switching systems
801Flow control or congestion control
CPC
H04L 47/127
HELECTRICITY
04ELECTRIC COMMUNICATION TECHNIQUE
LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
47Traffic regulation in packet switching networks
10Flow control or congestion control
12Congestion avoidance or recovery
127Congestion prediction
H04L 47/74
HELECTRICITY
04ELECTRIC COMMUNICATION TECHNIQUE
LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
47Traffic regulation in packet switching networks
70Admission control or resource allocation
74Reactions to resource unavailability
Applicants
  • TELEFONAKTIEBOLAGET LM ERICSSON (PUBL) [SE]/[SE]
Inventors
  • SHARMA, Nipun
  • BAJPAI, Rakesh
  • BHARDWAJ, Rajiv
  • FOTI, George
  • SABHARWAL, Tushar
Priority Data
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) OPTIMIZED RESOURCE MANAGEMENT BASED ON PREDICTIVE ANALYTICS
(FR) GESTION DE RESSOURCES OPTIMISÉE REPOSANT SUR UNE ANALYSE PRÉDICTIVE
Abstract
(EN)
A method, performed by a network node (e.g. a network data analytics function (NWDAF)), is provided. The method includes receiving first congestion prediction information from a first node (e.g. a policy control function (PCF)) for a first location (e.g., cell and/or tracking area). The first congestion prediction information includes an expected data size and/or duration for a content to be downloaded /streamed and/or is derived from the expected data size and/or duration for the content to be downloaded/streamed. The method further includes determining that a congestion condition exists for one or more locations (e.g., cells and/or tracking areas) based at least in part on the first congestion prediction information; and in response to determining that the congestion condition exists for one or more locations (e.g., cells and/or tracking areas), modifying available network resources based on the congestion condition.
(FR)
L'invention concerne un procédé mis en œuvre par un nœud de réseau (par exemple, une fonction d'analyse de données de réseau (NWDAF)). Le procédé comprend la réception de premières informations de prédiction de congestion en provenance d'un premier nœud (par exemple, une fonction de commande de politique (PCF)) pour un premier emplacement (par exemple, une cellule et/ou une zone de suivi). Les premières informations de prédiction de congestion comprennent une taille de données et/ou une durée attendues pour un contenu à télécharger/diffuser en continu, et/ou sont dérivées à partir de la taille de données et/ou de la durée attendues pour le contenu à télécharger/diffuser en continu. Le procédé comprend en outre la détermination de l'existence d'un état de congestion pour un ou plusieurs emplacements (par exemple, des cellules et/ou des zones de suivi) sur la base, au moins en partie, des premières informations de prédiction de congestion ; et en réponse à la détermination de l'existence de l'état de congestion pour un ou plusieurs emplacements (par exemple, des cellules et/ou des zones de suivi), la modification de ressources de réseau disponibles sur la base de l'état de congestion.
Latest bibliographic data on file with the International Bureau