1. WO2020089730 - ACCELERATED ZONE-2 PROTECTION FOR TRANSMISSION LINES

Publication Number WO/2020/089730
Publication Date 07.05.2020
International Application No. PCT/IB2019/058986
International Filing Date 22.10.2019
IPC
H02H 7/26 2006.01
HELECTRICITY
02GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
7Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occurred
CPC
H02H 7/265
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
7Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
265making use of travelling wave theory
Applicants
  • ABB SCHWEIZ AG [CH]/[CH]
Inventors
  • DEMUDU NAIDU, Obbalareddi
  • VENKAT YALLA, Preetham
  • PRADHAN, Vedanta
  • KUBAL, Nandkishor
  • SRIVASTAVA, Sachin
Priority Data
20184104117031.10.2018IN
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) ACCELERATED ZONE-2 PROTECTION FOR TRANSMISSION LINES
(FR) PROTECTION DE ZONE -2 ACCÉLÉRÉE POUR LIGNES DE TRANSMISSION
Abstract
(EN)
The invention relates to protection from faults in a power transmission system having two or more transmission lines. Travelling waves are detected from a signal obtained with a measurement equipment associated with a bus of the power transmission system. Arrival times of a first peak of a first travelling wave, a second travelling wave and a third travelling wave, are detected from the signal. A value for line length is calculated from the arrival times and propagation velocity of the travelling wave in the corresponding transmission line. The calculated value is compared with an actual length of the corresponding transmission line, for determining if the fault is an internal fault or an external fault. According to the fault being one of the internal fault and the external fault, a signal for controlling a switching device associated with the corresponding transmission line is generated.
(FR)
L'invention concerne la protection contre les défaillances dans un système de transmission d'énergie comprenant deux lignes de transmission ou plus. Des ondes progressives sont détectées à partir d'un signal obtenu avec un équipement de mesure associé à une voie du système de transmission d'énergie. Des temps d'arrivée d'un premier pic d'une première onde progressive, d'une deuxième onde progressive et d'une troisième onde progressive sont détectés à partir du signal. Une valeur de longueur de ligne est calculée à partir des temps d'arrivée et de la vitesse de propagation de l'onde progressive dans la ligne de transmission correspondante. La valeur calculée est comparée à une longueur réelle de la ligne de transmission correspondante, pour déterminer si la défaillance est une défaillance interne ou une défaillance externe. Selon que la défaillance est soit une défaillance interne, soit une défaillance externe, un signal pour commander un dispositif de commutation associé à la ligne de transmission correspondante est produit. FIG. 4: