1. WO2020088694 - QUANTIFIED DESIGN METHOD FOR COORDINATION AND DEFORMATION OF GOB-SIDE ENTRY RETAINING SUPPORT SYSTEM

Publication Number WO/2020/088694
Publication Date 07.05.2020
International Application No. PCT/CN2019/120458
International Filing Date 24.11.2019
IPC
E21C 41/18 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
CMINING OR QUARRYING
41Methods of underground or surface mining; Layouts therefor
16Methods of underground mining; Layouts therefor
18for brown or hard coal
E21D 20/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
20Setting anchoring-bolts
E21F 15/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
15Methods or devices for placing filling-up materials in underground workings
Applicants
  • 山东科技大学 SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY [CN]/[CN]
Inventors
  • 李学慧 LI, Xuehui
  • 宁建国 NING, Jianguo
  • 邱鹏奇 QIU, Pengqi
  • 商和福 SHANG, Hefu
  • 王俊 WANG, Jun
Agents
  • 济南金迪知识产权代理有限公司 JINAN JINDI INTELLECTUAL PROPERTY AGENCY CO., LTD
Priority Data
201910033631.615.01.2019CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) QUANTIFIED DESIGN METHOD FOR COORDINATION AND DEFORMATION OF GOB-SIDE ENTRY RETAINING SUPPORT SYSTEM
(FR) PROCÉDÉ DE CONCEPTION QUANTIFIÉE POUR LA COORDINATION ET LA DÉFORMATION D'UN SYSTÈME DE SUPPORT DE RETENUE D'ENTRÉE CÔTÉ PARAISON
(ZH) 一种沿空留巷支护系统协调变形定量设计方法
Abstract
(EN)
A quantified design method for the coordination and deformation of a gob-side entry retaining support system. First, constructing a gob-side entry retaining support system; then establishing a structural mechanics model; acquiring, according to the mechanics model, the maximum turning angle of a basic roof rock beam under four conditions of the deformation limit for anchored coal in the physical coal wall, the deformation limit for the laneway side filler, the service requirement limit for the gob-side entry retaining cross sections, and the maximum deformation limit of goaf gangue; and performing quantified design for the gob-side entry retaining wall rock support according to the relative amount of the maximum turning angle of the basic roof rock beam under said four conditions.
(FR)
L'invention concerne un procédé de conception quantifiée pour la coordination et la déformation d'un système de support de retenue d'entrée côté paraison. Ledit procédé consiste, tout d'abord, à construire un système de support de retenue d'entrée côté paraison; puis à établir un modèle mécanique structural; à acquérir, selon le modèle mécanique, l'angle de rotation maximal d'une dalle de roche de toit de base dans quatre conditions de la limite de déformation pour le charbon ancré dans la paroi de charbon physique, de la limite de déformation pour la charge latérale de l'allée, de la limite d'exigence de service pour les sections transversales de retenue d'entrée côté paraison, et de la limite de déformation maximale de la gangue de remblai ; et à réaliser une conception quantifiée pour le support de roche de paroi de retenue d'entrée côté paraison selon la somme relative de l'angle de rotation maximal de la dalle de roche de toit de base dans lesdites quatre conditions.
(ZH)
一种沿空留巷支护系统协调变形定量设计方法,首先构建沿空留巷支护系统,然后建立结构力学模型,根据力学模型获得受实体煤帮加锚煤体允许变形量限制、受巷旁充填体允许变形量限制、受沿空留巷巷道断面服务要求限制以及受采空区矸石最大变形量限制四种情形下的基本顶岩梁最大回转角,根据四种情形下的基本顶岩梁最大回转角的相对大小对沿空留巷围岩支护进行定量设计。