Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020088375 - ESTABLISHMENT METHOD FOR FUEL ROD CLADDING CREEP FINITE-LENGTH PIPE CORRECTION METHOD

Publication Number WO/2020/088375
Publication Date 07.05.2020
International Application No. PCT/CN2019/113442
International Filing Date 25.10.2019
IPC
G06F 17/00 2019.01
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
FELECTRIC DIGITAL DATA PROCESSING
17Digital computing or data processing equipment or methods, specially adapted for specific functions
CPC
G06F 2113/14
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
FELECTRIC DIGITAL DATA PROCESSING
2113Details relating to the application field
14Pipes
G06F 30/17
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
FELECTRIC DIGITAL DATA PROCESSING
30Computer-aided design [CAD]
10Geometric CAD
17Mechanical parametric or variational design
G06F 30/23
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
FELECTRIC DIGITAL DATA PROCESSING
30Computer-aided design [CAD]
20Design optimisation, verification or simulation
23using finite element methods [FEM] or finite difference methods [FDM]
Applicants
  • 中广核研究院有限公司 CHINA NUCLEAR POWER TECHNOLOGY RESEARCH INSTITUTE CO., LTD [CN]/[CN]
  • 岭澳核电有限公司 LING AO NUCLEAR POWER CO., LTD. [CN]/[CN]
  • 中国广核集团有限公司 CHINA GENERAL NUCLEAR POWER CORPORATION [CN]/[CN]
  • 中国广核电力股份有限公司 CGN POWER CO., LTD [CN]/[CN]
Inventors
  • 卢勇 LU, Yong
  • 金鑫 JIN, Xin
  • 邓勇军 DENG, Yongjun
Agents
  • 深圳市瑞方达知识产权事务所(普通合伙) SHENZHEN REFINED INTELLECTUAL PROPERTY OFFICE (GENERAL PARTNERSHIP)
Priority Data
201811269670.829.10.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) ESTABLISHMENT METHOD FOR FUEL ROD CLADDING CREEP FINITE-LENGTH PIPE CORRECTION METHOD
(FR) PROCÉDÉ D'ÉTABLISSEMENT D'UN PROCÉDÉ DE CORRECTION DE FLUAGE DE GAINE DE CRAYON COMBUSTIBLE DE TUYAU DE LONGUEUR FINIE
(ZH) 燃料棒包壳蠕变有限长管修正方法的建立方法
Abstract
(EN)
Disclosed is an establishment method for a fuel rod cladding creep finite-length pipe correction method. The establishment method comprises: S1, determining parameters of a cladding pipe; S2, performing analysis and processing to obtain the ovalities of cladding pipes with different pipe lengths and different initial ovalities; S3, obtaining, according to the obtained ovalities of the cladding pipes with different pipe lengths and different initial ovalities and in conjunction with internal and external pressure differences of the cladding pipes, the rigidities of the cladding pipes with different pipe lengths and different initial ovalities; S4, obtaining a cladding pipe correction factor F; and S5, according to the analysis of the influence of the pipe lengths and the initial ovalities of the cladding pipes and the internal and external pressure differences of the cladding pipes on the cladding pipe correction factor, determining a curve of a finite-length pipe correction factor, and establishing a finite-length pipe correction method. By means of the method, the problem of an end boundary condition affecting a cladding creep behavior in fuel rod cladding creep collapse analysis is solved, the rationality and reliability of fuel rod cladding creep analysis are improved, and the cladding creep collapse analysis reliability of a fuel rod in engineering analysis and designs is guaranteed.
(FR)
L'invention concerne un procédé d'établissement d'un procédé de correction de fluage de gaine de crayon combustible de tuyau de longueur finie. Le procédé d'établissement consistant : S1, à déterminer des paramètres d'un tuyau de gaine ; S2, à effectuer une analyse et un traitement pour obtenir les ovalités des tuyaux de gaine ayant différentes longueurs de tuyau et différentes ovalités initiales ; S3, à obtenir, en fonction des ovalités obtenues des tuyaux de gaine ayant des longueurs de tuyau différentes et des ovalités initiales différentes et conjointement avec des différences de pression interne et externe des tuyaux de gaine, les rigidités des tuyaux de gaine ayant des longueurs de tuyau différentes et des ovalités initiales différentes ; S4, à obtenir un facteur F de correction de tuyau de gaine ; et S5, selon l'analyse de l'influence des longueurs de tuyau et des ovalités initiales des tuyaux de gaine et des différences de pression interne et externe des tuyaux de gaine sur le facteur de correction de tuyau de gaine, à déterminer une courbe d'un facteur de correction de tuyau de longueur finie, et à établir un procédé de correction de tuyau de longueur finie. Au moyen du procédé, le problème d'une condition de limite d'extrémité altérant un comportement de fluage de gaine dans une analyse d'effondrement de fluage de gaine de crayon combustible est résolu, la rationalité et la fiabilité de l'analyse de fluage de gaine de crayon combustible sont améliorées, et la fiabilité d'analyse d'effondrement de fluage de gaine d'un crayon combustible dans une analyse d'ingénierie et des conceptions est garantie.
(ZH)
一种燃料棒包壳蠕变有限长管修正方法的建立方法,包括:S1、确定包壳管的参数;S2、分析处理获得在不同管长和不同初始椭圆度下包壳管的椭圆度;S3、根据获得的不同管长和不同初始椭圆度下包壳管的椭圆度、结合包壳管内外压差,获得不同管长和不同初始椭圆度下包壳管的刚度;S4、获得包壳管修正因子F;S5、根据包壳管管长、初始椭圆度和包壳管内外压差对包壳管修正因子的影响性分析,确定有限长管修正因子的曲线,建立有限长管修正方法。该方法解决了燃料棒包壳蠕变坍塌分析中端部边界条件对包壳蠕变行为影响的问题,提高了燃料棒包壳蠕变分析的合理性和可靠性,保证了燃料棒在工程分析和设计中包壳蠕变坍塌分析可靠性。
Also published as
Latest bibliographic data on file with the International Bureau