Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020088206 - WEIGHT AND CONSTRAINT ASSOCIATED ADJUSTMENT-BASED REAL-TIME POWER GENERATION CONTROL OPTIMIZATION DECISION METHOD FOR POWER GRID

Publication Number WO/2020/088206
Publication Date 07.05.2020
International Application No. PCT/CN2019/110363
International Filing Date 10.10.2019
IPC
H02J 3/46 2006.01
HELECTRICITY
02GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
38Arrangements for parallelly feeding a single network by two or more generators, converters, or transformers
46Controlling the sharing of output between the generators, converters, or transformers
CPC
H02J 2203/20
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
2203Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
H02J 3/008
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
008involving trading of energy or energy transmission rights
H02J 3/46
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
46Controlling of the sharing of output between the generators, converters, or transformers
H02J 3/48
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
46Controlling of the sharing of output between the generators, converters, or transformers
48Controlling the sharing of the in-phase component
Applicants
  • 国电南瑞科技股份有限公司 NARI TECHNOLOGY CO LTD [CN]/[CN]
  • 国网青海省电力公司 STATE GRID QINGHAI ELECTRIC POWER COMPANY [CN]/[CN]
  • 南瑞集团有限公司 NARI GROUP CORPORATION [CN]/[CN]
  • 国家电网有限公司 STATE GRID CORPORATION OF CHINA [CN]/[CN]
Inventors
  • 徐泰山 XU, Taishan
  • 汪马翔 WANG, Maxiang
  • 范越 FAN, Yue
  • 王昊昊 WANG, Haohao
  • 常康 CHANG, Kang
  • 董凌 DONG, Ling
  • 张昊天 ZHANG, Haotian
  • 李吉晨 LI, Jichen
  • 李延和 LI, Yanhe
Agents
  • 南京纵横知识产权代理有限公司 NANJING ZONGHENG INTELLECTUAL PROPERTY AGENCY CO., LTD.
Priority Data
201811286328.931.10.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) WEIGHT AND CONSTRAINT ASSOCIATED ADJUSTMENT-BASED REAL-TIME POWER GENERATION CONTROL OPTIMIZATION DECISION METHOD FOR POWER GRID
(FR) PROCÉDÉ DE DÉCISION D'OPTIMISATION DE COMMANDE DE PRODUCTION D'ÉNERGIE EN TEMPS RÉEL FONDÉE SUR UN AJUSTEMENT D'ASSOCIATION DE POIDS ET DE CONTRAINTES POUR UN RÉSEAU ÉLECTRIQUE
(ZH) 权重与约束关联调整的电网实时发电控制优化决策方法
Abstract
(EN)
A weight and constraint associated adjustment-based real-time power generation control optimization decision method for a power grid. By resolving a power generation control optimization decision model which takes, as the weight, a comprehensive index reflecting the influence chracteristics of an output of a power plant on the security and stability of the power grid, economic and environmental protection performance, prediction performance, adjustment performance and spot transaction execution conditions of the power plant, the power transmission devices/sections are classfied into constrained and unconstrained categories according to whether power transmission devices/sections reach the norm. For a power plant having a smaller active power sensitivity to the constrained devices/sections, a power generation control optimization decision is made by using the comprehensive index irrespective of the power grid security performance of the power plant as a weight and only considering overload constraints of the unconstrained devices/sectios, thereby realizing adaptive adjustment of associating the weight with constraints, ensuring that the power generation control of the power grid satisfies the requirements of real-time performance, security and economy and environmental protection.
(FR)
L'invention concerne un procédé de décision d'optimisation de commande de production d'énergie en temps réel fondée sur un ajustement d'association de poids et de contraintes pour un réseau électrique. Par la résolution d'un modèle de décision d'optimisation de commande de production d'énergie qui prend, en tant que poids, un indice complet reflétant les caractéristiques d'influence d'une sortie d'une centrale électrique sur la sécurité et la stabilité du réseau électrique, des performances de protection économique et environnementale, des performances de prédiction, des performances d'ajustement et des conditions d'exécution de transaction au comptant de la centrale électrique, les dispositifs/sections de transmission d'énergie sont classés en catégories contraintes et non contraintes selon que les dispositifs/sections de transmission d'énergie répondent à la norme. En ce qui concerne une centrale électrique présentant une sensibilité de puissance active inférieure aux dispositifs/sections contraints, une décision d'optimisation de commande de production d'énergie est prise à l'aide de l'indice complet indépendamment des performances de sécurité de réseau électrique de la centrale électrique en tant que poids et en tenant compte uniquement des contraintes de surcharge des dispositifs/sections non contraints, ce qui permet de réaliser un ajustement adaptatif de l'association du poids avec des contraintes, ce qui garantit que la commande de production d'énergie du réseau électrique réponde aux exigences de performances en temps réel, de sécurité et de protection économique et environnementale.
(ZH)
一种权重与约束关联调整的电网实时发电控制优化决策方法,通过求解以反映发电厂出力对电网安全稳定影响特性及其经济环保性能、预测性能、调节性能和现货交易执行情况的综合指标为权重的发电控制优化决策模型,根据输电设备/断面是否达到限额,将输电设备/断面划分为受限类和不受限类;针对与受限设备/断面的有功灵敏度较小的发电厂,采用不考虑其电网安全性能的综合指标为权重,并只计及不受限类设备/断面的过载约束进行发电控制优化决策,实现了权重与约束关联的自适应调整,保障电网发电控制满足实时性、安全性和经济环保要求。
Also published as
Latest bibliographic data on file with the International Bureau