Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020087762 - NOVEL BORE WELL CASING AND LARGE-WELLBORE MULTI-BRANCH WELL RAPID DRILLING AND COMPLETION METHOD

Publication Number WO/2020/087762
Publication Date 07.05.2020
International Application No. PCT/CN2018/125987
International Filing Date 31.12.2018
IPC
E21B 7/04 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
7Special methods or apparatus for drilling
04Directional drilling
E21B 23/01 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
23Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
01for anchoring the tools or the like
E21B 43/10 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
02Subsoil filtering
10Setting of casings, screens or liners in wells
E21B 43/30 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
30Specific pattern of wells, e.g. optimizing the spacing of wells
CPC
E21B 23/01
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
23Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
01for anchoring the tools or the like
E21B 43/103
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
02Subsoil filtering
10Setting of casings, screens, liners ; or the like; in wells
103of expandable casings, screens, liners, or the like
E21B 43/305
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
30Specific pattern of wells, e.g. optimizing the spacing of wells
305comprising at least one inclined or horizontal well
E21B 7/04
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
7Special methods or apparatus for drilling
04Directional drilling
Applicants
  • 中国石油大学(华东) CHINA UNIVERSITY OF PETROLEUM (EAST CHINA) [CN]/[CN]
Inventors
  • 闫传梁 YAN, Chuanliang
  • 任旭 REN, Xu
  • 程远方 CHENG, Yuanfang
  • 田万顷 TIAN, Wanqing
  • 李阳 LI, Yang
  • 李庆超 LI, Qingchao
  • 魏佳 WEI, Jia
  • 宋本健 SONG, Benjian
Agents
  • 青岛智地领创专利代理有限公司 QINGDAO ZHIDILINGCHUANG PATENT AGENCY CO., LTD
Priority Data
201811273919.230.10.2018CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) NOVEL BORE WELL CASING AND LARGE-WELLBORE MULTI-BRANCH WELL RAPID DRILLING AND COMPLETION METHOD
(FR) NOUVEAU TUBAGE DE PUITS DE FORAGE ET PROCÉDÉ DE FORAGE ET DE COMPLÉTION RAPIDE DE PUITS À BRANCHES MULTIPLES POUR GRAND PUITS DE FORAGE
(ZH) 新型钻井套管及大井眼多分支井快速钻完井方法
Abstract
(EN)
A novel bore well casing and a large-wellbore multi-branch well rapid drilling and completion method using same. The casing comprises a casing wall and a plurality of sand control devices (7) spaced apart on the casing wall; each sand control device (7) comprises a sand control mesh, a sealing steel sheet (7-3), and a sealing rubber plug (7-2); a plurality of sand control screen holes (7-1) which are parallel to each other is provided on the sand control mesh; the sand control screen holes (7-1) directly face the sealing steel sheet (7-3); the sand control mesh and the sealing steel sheet (7-3) are connected by means of a steel pin (7-4). According to the method, a main wellbore (5) is formed by drilling a large-size drill bit (12) into a target well at a time, then, a branch wellbore (6) is drilled in a natural gas hydrate reservoir by using the novel bore well casing, and then, the drill bit (12) is removed for completion. The method is suitable for various natural gas hydrate exploitation modes, and the yield and recovery of a hydrate well can be greatly improved. Moreover, the well drilling and completion are integrated, thereby shortening the well drilling and completion period, and being able to realize effective sand control while saving a large amount of manpower and material resources.
(FR)
L'invention concerne un nouveau tubage de puits de forage et un procédé de forage et de complétion rapide de puits à branches multiples pour grand puits de forage l'utilisant. Le tubage comprend une paroi et une pluralité de dispositifs de contrôle du sable (7) espacés sur la paroi du tubage; chaque dispositif de contrôle du sable (7) comprend un maillage de contrôle du sable, une feuille d'acier d'étanchéité (7-3), et un bouchon d'étanchéité en caoutchouc (7-2); une pluralité de trous de tamis de contrôle du sable (7-1) qui sont parallèles les un aux autres sont agencés sur le maillage de contrôle du sable; les trous du tamis de contrôle du sable (7-1) font directement face à la feuille d'acier d'étanchéité (7-3); le maillage de contrôle du sable et la feuille d'acier d'étanchéité (7-3) sont reliés au moyen d'une broche d'acier (7-4). Selon le procédé, un puits principal (5) est formé par forage au moyen d'un trépan de grande taille (12) dans un puits cible à un moment donné, puis un puits de forage ramifié (6) est foré dans un réservoir d'hydrate de gaz naturel à l'aide du nouveau tubage de puits de forage, puis, le trépan (12) est retiré pour complétion. Le procédé est approprié pour divers modes d'exploitation d'hydrates de gaz naturel, et le rendement et la récupération d'un puits d'hydrates peuvent être considérablement améliorés. De plus, le forage et la complétion de puits sont intégrés, raccourcissant ainsi la période de forage et de complétion de puits, et permettant de réaliser un contrôle du sable efficace tout en économisant une grande quantité de ressources en main d'oeuvre et matériel.
(ZH)
一种新型钻井套管及使用该新型钻井套管进行大井眼多分支井快速钻完井方法,该套管包括套管壁和间隔的设置于套管壁上的若干个防砂装置(7),每个防砂装置(7)均包括防砂网、密封钢片(7-3)和密封橡胶塞(7-2),防砂网上布置有多个相互平行的防砂筛孔(7-1),防砂筛孔(7-1)正对密封钢片(7-3),防砂网与密封钢片(7-3)之间通过钢销(7-4)连接。该方法采用大尺寸钻头(12)一次性钻至目的井深形成主井眼(5),再利用新型钻井套管在天然气水合物储层中钻取分支井眼(6),然后取出钻头(12)进行完井,适用于各种天然气水合物开采方式,能够大幅度提高水合物井的产量和采收率,并且钻完井一体化,缩短钻完井周期,节省大量的人力物力的同时还能有效的防砂。
Also published as
Latest bibliographic data on file with the International Bureau