Processing

Please wait...

Settings

Settings

Goto Application

1. WO2020072063 - ALIGNING TWO PARTS OF A TUBULAR ASSEMBLY

Publication Number WO/2020/072063
Publication Date 09.04.2020
International Application No. PCT/US2018/054424
International Filing Date 04.10.2018
IPC
E21B 17/042 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
17Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Casings; Tubings
02Couplings; Joints
04between rod and bit, or between rod and rod
042threaded
F16L 15/00 2006.01
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
16ENGINEERING ELEMENTS OR UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
15Screw-threaded joints; Forms of screw-threads for such joints
CPC
E21B 17/042
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
17Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods ; ; Cables; Casings; Tubings
02Couplings; joints
04between rod ; or the like; and bit or between rod and rod ; or the like
042threaded
F16L 15/00
FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
15Screw-threaded joints
Applicants
  • HALLIBURTON ENERGY SERVICES, INC. [US]/[US]
Inventors
  • STOKES, Matthew Bradley
  • DIETZ, Wesley Paul
Agents
  • TUMEY, Corey
Priority Data
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) ALIGNING TWO PARTS OF A TUBULAR ASSEMBLY
(FR) ALIGNEMENT DE DEUX PARTIES D'UN ENSEMBLE TUBULAIRE
Abstract
(EN)
A method comprising: providing the first tool piece to be disposed in a wellbore, wherein the first tool piece comprises: a first thread, wherein the first thread is disposed at a first end of the first tool piece; and a second thread, wherein the second thread is disposed at the first end of the first tool piece, and wherein the first thread and the second thread have opposing handedness; disposing an alignment ring on the first tool piece, coupling the first end of the first tool piece to a second end of the second tool piece, wherein the alignment ring is disposed between the first tool piece and the second tool piece; decoupling the first tool piece from the second tool piece; rotating the alignment ring; and coupling the first tool piece to the second tool piece after rotating the alignment ring to produce the tubular assembly.
(FR)
L'invention concerne un procédé, qui comprend : la disposition de la première pièce d'outil devant être disposée dans un puits de forage, la première pièce d'outil comprenant : un premier filetage, le premier filetage étant disposé à une première extrémité de la première pièce d'outil ; et un second filetage, le second filetage étant disposé à la première extrémité de la première pièce d'outil, et le premier filetage et le second filetage ayant un sens de vissage opposé ; la disposition d'une bague d'alignement sur la première pièce d'outil, le couplage de la première extrémité de la première pièce d'outil à une seconde extrémité de la seconde pièce d'outil, la bague d'alignement étant disposée entre la première pièce d'outil et la seconde pièce d'outil ; le découplage de la première pièce d'outil de la seconde pièce d'outil ; la rotation de la bague d'alignement ; et le couplage de la première pièce d'outil à la seconde pièce d'outil après la rotation de la bague d'alignement pour produire l'ensemble tubulaire.
Latest bibliographic data on file with the International Bureau