Mobile |
Deutsch |
Español |
Français |
日本語 |
한국어 |
Português |
Русский |
中文 |
العربية |
PATENTSCOPE
Search International and National Patent Collections
Options
Query
Result
Interface
Office
Translate
Query Language
All
Arabic
Bulgarian
Chinese
Danish
English
Estonian
French
German
Hebrew
Indonesian
Italian
Japanese
Korean
Laotian
Polish
Portuguese
Romanian
Russian
Spanish
Swedish
Thai
Vietnamese
Stem
Sort by:
Relevance
Pub Date Desc
Pub Date Asc
App Date Desc
App Date Asc
List Length
10
50
100
200
Result List Language
Query Language
English
Spanish
Korean
Vietnamese
Hebrew
Portuguese
French
German
Japanese
Russian
Chinese
Italian
Polish
Danish
Swedish
Arabic
Estonian
Indonesian
Thai
Bulgarian
Laotian
Romanian
Displayed Fields
Application Number
Publication Date
Abstract
Applicant Name
Int. Class
Image
Inventor Name
Chart/Graph
Table
Graph
Group by
*
None
Offices of NPEs
IPC code
Applicants
Inventors
Filing Dates
Publication Dates
Countries
No of Items/Group
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Download Fields
NPEs
Default Search Form
Simple
Advanced Search
Field Combination
Browse by Week (PCT)
Cross Lingual Expansion
Translator
Simple
Advanced Search
Field Combination
Browse by Week (PCT)
Cross Lingual Expansion
Translator
Default Tab Search Form
Front Page
Any Field
Full Text
ID/Numbers
IPC
Names
Dates
Front Page
Any Field
Full Text
ID/Numbers
IPC
Names
Dates
Interface Language
English
Deutsch
Français
Español
日本語
中文
한국어
Português
Русский
English
Deutsch
Français
Español
日本語
中文
한국어
Português
Русский
Multiple Windows Interface
Tooltip Help
IPC Tooltip Help
Instant Help
Expanded Query
Office:
All
All
PCT
Africa
African Regional Intellectual Property Organization (ARIPO)
Egypt
Kenya
Morocco
Tunisia
South Africa
Americas
United States of America
Canada
LATIPAT
Argentina
Brazil
Chile
Colombia
Costa Rica
Cuba
Dominican Rep.
Ecuador
El Salvador
Guatemala
Honduras
Mexico
Nicaragua
Panama
Peru
Uruguay
Asia-Europe
Australia
Bahrain
China
Denmark
Estonia
Eurasian Patent Office
European Patent Office (EPO)
France
Germany
Germany(DDR data)
Israel
Japan
Jordan
Portugal
Russian Federation
Russian Federation(USSR data)
Saudi Arabia
United Arab Emirates
Spain
Republic of Korea
India
United Kingdom
Georgia
Bulgaria
Italy
Romania
Lao People's Democratic Republic
Asean
Singapore
Viet Nam
Indonesia
Cambodia
Malaysia
Brunei Darussalam
Philippines
Thailand
WIPO translate (Wipo internal translation tool)
Search
Simple
Advanced Search
Field Combination
Cross Lingual Expansion
Chemical compounds (login required)
Browse
Browse by Week (PCT)
Gazette Archive
National Phase Entries
Full download
Incremental download (last 7 days)
Sequence listing
IPC Green Inventory
Portal to patent registers
Translate
WIPO Translate
WIPO Pearl
News
PATENTSCOPE News
Login
ui-button
Login
Account Sign Up
Options
Options
Help
ui-button
How to Search
User Guide PATENTSCOPE
User Guide: Cross Lingual Expansion
User Guide: ChemSearch
Query Syntax
Fields Definition
Country Code
Data Coverage
PCT applications
PCT national phase entry
National collections
Global Dossier public
FAQ
Feedback&Contact
INID codes
Kind codes
Tutorials
About
Overview
Terms And Conditions
Disclaimer
Home
IP Services
PATENTSCOPE
Machine translation
Wipo Translate
Arabic
German
English
Spanish
French
Japanese
Korean
Portuguese
Russian
Chinese
Google Translate
Bing/Microsoft Translate
Baidu Translate
Arabic
English
French
German
Spanish
Portuguese
Russian
Korean
Japanese
Chinese
...
Italian
Thai
Cantonese
Classical Chinese
Some content of this application is unavailable at the moment.
If this situation persist, please contact us at
Feedback&Contact
1. (WO2019006733) LONG-TERM JOINT PEAK REGULATION DISPATCHING METHOD FOR TRANS-PROVINCIAL INTERCONNECTED HYDROPOWER STATION CLUSTER
PCT Biblio. Data
Full Text
Drawings
National Phase
Notices
Documents
Latest bibliographic data on file with the International Bureau
Submit observation
PermaLink
PermaLink
Bookmark
Pub. No.:
WO/2019/006733
International Application No.:
PCT/CN2017/092122
Publication Date:
10.01.2019
International Filing Date:
06.07.2017
IPC:
G06Q 50/06
(2012.01)
G
PHYSICS
06
COMPUTING; CALCULATING; COUNTING
Q
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50
Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
06
Electricity, gas or water supply
Applicants:
大连理工大学 DALIAN UNIVERSITY OF TECHNOLOGY
[CN/CN]; 中国辽宁省大连市 凌工路2号大连理工大学专利中心 Patent Agency Center of DLUT No.2 Linggong Road Dalian, Liaoning 116024, CN
Inventors:
申建建 SHEN, Jianjian
; CN
程春田 CHENG, Chuntian
; CN
孙立飞 SUN, Lifei
; CN
苏承国 SU, Chengguo
; CN
Priority Data:
Title
(EN)
LONG-TERM JOINT PEAK REGULATION DISPATCHING METHOD FOR TRANS-PROVINCIAL INTERCONNECTED HYDROPOWER STATION CLUSTER
(FR)
PROCÉDÉ DE RÉPARTITION DE RÉGULATION DE POINTE CONJOINTE À LONG TERME POUR UN GROUPE DE CENTRALES HYDROÉLECTRIQUES INTERCONNECTÉES TRANSPROVINCIALES
(ZH)
一种跨省互联水电站群长期联合调峰调度方法
Abstract:
(EN)
A long-term joint peak regulation dispatching method for a trans-provincial interconnected hydropower station cluster, wherein same is characterized by: making full use of a hydrological characteristic difference between hydropower stations at two ends, i.e. a sending end and a receiving end, giving play to compensative dispatching of a trans-provincial hydropower station cluster, taking load characteristics in a typical day of a power grid during the dry season into account, and improving the peak load regulation capability of hydropower to the power grid while the long-term power of hydropower is coordinated and allocated. The method comprises: establishing a multi-objective optimization model of a hydropower station cluster with the goal of maximizing the amount of power generated and minimizing the peak-valley ratio of a typical day during the dry season, using trans-provincial and trans-regional interbasin hydrological characteristics and a regulation performance difference between power sources, grouping power stations according to an output interval where same are located, and coordinating the calculation sequence of the power stations in stages; and using a progressive optimization and dynamic planning successive approximation coupling algorithm to optimize the optimal water level process of hydropower station clusters at a sending end and a receiving end, reconstructing, according to a transmission restriction constraint of a trans-provincial direct-current tie line, a load faced by the sending end, determining the output process of a typical day by means of a successive load shedding strategy, and obtaining, by means of iterative optimization, a long-term power distribution scheme of the hydropower station cluster and the electric power process of a typical day in each month. The method can make full use of compensative regulation characteristics of hydropower station clusters at a sending end and a receiving end, effectively responds to a long-term power demand and a short-term peak regulation demand of a power grid, and can also meet the actual needs of trans-provincial and trans-regional power transmission dispatching of a giant hydropower station, such as Xiluodu hydropower station and Jinping hydropower station.
(FR)
L'invention concerne un procédé de répartition de régulation de pointe conjointe à long terme pour un groupe de centrales hydroélectriques interconnectées transprovinciales, ce procédé étant caractérisé par : la pleine utilisation d'une différence de caractéristiques hydrologiques entre des centrales hydroélectriques à deux extrémités, c'est-à-dire une extrémité d'envoi et une extrémité de réception, ce qui donne lieu à une répartition à compensation d'un groupe de centrales hydroélectriques transprovinciales, des caractéristiques de charge lors d'un jour typique d'un réseau électrique pendant la saison sèche étant prises en compte, et la capacité de régulation de charge de pointe d'énergie hydraulique du réseau électrique étant améliorée tandis que la puissance à long terme de l'énergie hydroélectrique est coordonnée et attribuée. Le procédé comprend les étapes consistant : à établir un modèle d'optimisation multi-objectif d'un groupe de centrales hydroélectriques dans le but de maximiser la quantité d'énergie générée et de réduire au minimum le rapport pointe-creux d'un jour typique pendant la saison sèche, à utiliser des caractéristiques hydrologiques transprovinciales et transrégionales entre bassins et une différence de performances de régulation entre des sources d'énergie, à regrouper des centrales électriques selon un intervalle de rendement où elles sont situées, et à coordonner la séquence de calcul des centrales électriques par étages; et à utiliser un algorithme de couplage d'approximations successives pour optimisation progressive et planification dynamique afin d'optimiser le processus de niveau d'eau optimal de groupes de centrales hydroélectriques à une extrémité d'envoi et une extrémité de réception, à reconstruire, selon une contrainte de restriction de transmission d'une ligne d'interconnexion de courant continu transprovinciale, la charge de l'extrémité d'envoi, à déterminer le processus de rendement d'un jour typique au moyen d'une stratégie de délestage successif de charge, et à obtenir, grâce à une optimisation itérative, un système de distribution d'énergie à long terme du groupe de centrales hydroélectriques et le processus d'énergie électrique d'un jour typique de chaque mois. Le procédé peut utiliser pleinement des caractéristiques de régulation à compensation de groupes de centrales hydroélectriques à une extrémité d'envoi et une extrémité de réception, répond efficacement à une demande d'énergie à long terme et à une demande de régulation de pointe à court terme d'un réseau électrique, et peut également satisfaire aux besoins réels de répartition de transmission d'énergie transprovinciale et transrégionale d'une centrale hydroélectrique géante telle que la centrale hydroélectrique de Xiluodu et la centrale hydroélectrique de Jinping.
(ZH)
一种跨省互联水电站群长期联合调峰调度方法,其特点是充分利用送受两端水电站水文特性差异,发挥跨省水电站群补偿调度作用,并兼顾枯水期电网典型日负荷特性,在协调分配水电长期电量的同时,提高水电对电网的高峰负荷调节能力。该方法包括:以发电量最大和枯期典型日峰谷差率最小为目标建立水电站群多目标优化模型,利用跨省区流域间水文特性和电源间调节性能差异,将电站按所处的出力区间分组,分阶段协调电站计算顺序;采用逐步优化和动态规划逐次逼近耦合算法优化送受端水电站群最优水位过程,并根据跨省直流联络线输送限制约束重构送端面临负荷,以逐次切负荷策略确定典型日出力过程,通过迭代优化得到水电站群长期电量分配方案和各月典型日电力过程。该方法可充分利用送受端水电站群补偿调节特性,有效响应电网长期电量需求和短期调峰需求,能够满足我国溪洛渡、锦屏等巨型水电站跨省跨区送电调度实际需要。
Designated States:
AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DJ, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JO, JP, KE, KG, KH, KN, KP, KR, KW, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW
African Regional Intellectual Property Organization (ARIPO) (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW)
Eurasian Patent Office (AM, AZ, BY, KG, KZ, RU, TJ, TM)
European Patent Office (EPO) (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR)
African Intellectual Property Organization (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG)
Publication Language:
Chinese (
ZH
)
Filing Language:
Chinese (
ZH
)