Search International and National Patent Collections

1. (WO2018196264) CONSTRUCTION METHOD, APPARATUS AND EQUIPMENT FOR FUTURISTIC POWER GRID MODEL AND STORAGE MEDIUM

Pub. No.:    WO/2018/196264    International Application No.:    PCT/CN2017/102343
Publication Date: Fri Nov 02 00:59:59 CET 2018 International Filing Date: Wed Sep 20 01:59:59 CEST 2017
IPC: G06Q 10/06
H02J 3/00
Applicants: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
中国电力科学研究院有限公司
STATE GRID CORPORATION OF CHINA
国家电网公司
STATE GRID SICHUAN ELECTRIC POWER COMPANY
国网四川省电力公司
Inventors: HUANG, Guodong
黄国栋
DING, Qiang
丁强
ZHU, Zelei
朱泽磊
DAI, Sai
戴赛
CUI, Hui
崔晖
XU, Dan
许丹
CAI, Zhi
蔡帜
LI, Bo
李博
HU, Chenxu
胡晨旭
ZHANG, Chuancheng
张传成
YAN, Jinghua
燕京华
MEN, Deyue
门德月
ZHANG, Jiali
张加力
LI, Peijun
李培军
SUN, Zhen
孙振
Title: CONSTRUCTION METHOD, APPARATUS AND EQUIPMENT FOR FUTURISTIC POWER GRID MODEL AND STORAGE MEDIUM
Abstract:
A construction method and apparatus for a futuristic power grid model. The method comprises: acquiring a current power grid model, an equipment power-cut plan, an equipment decommissioning plan, and an equipment addition plan (S101); adding equipment according to the current power grid model, and respectively determining, according to the equipment addition plan, the equipment decommissioning plan and the equipment power-cut plan, an added equipment information set, a decommissioned equipment information set, and a power-cut equipment information set (S102); and setting the state of the added equipment to be a running state, forming an initial network model of each time period according to a timing sequence, and constructing the futuristic network model according to the added equipment information set, the decommissioned equipment information set, the power-cut equipment information set and the initial network model (S103). The futuristic power grid model further comprises a construction equipment and a storage medium.