Some content of this application is unavailable at the moment.
If this situation persist, please contact us atFeedback&Contact
1. (WO2018077016) VALUE NETWORK-BASED METHOD FOR ENERGY STORAGE SYSTEM SCHEDULING OPTIMIZATION
Latest bibliographic data on file with the International Bureau    Submit observation

Pub. No.: WO/2018/077016 International Application No.: PCT/CN2017/104925
Publication Date: 03.05.2018 International Filing Date: 30.09.2017
IPC:
H02J 3/28 (2006.01) ,G06Q 10/04 (2012.01) ,G06Q 50/06 (2012.01)
H ELECTRICITY
02
GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
J
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3
Circuit arrangements for ac mains or ac distribution networks
28
Arrangements for balancing the load in a network by storage of energy
G PHYSICS
06
COMPUTING; CALCULATING; COUNTING
Q
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10
Administration; Management
04
Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
G PHYSICS
06
COMPUTING; CALCULATING; COUNTING
Q
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50
Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
06
Electricity, gas or water supply
Applicants:
国电南瑞科技股份有限公司 NARI TECHNOLOGY CO., LTD. [CN/CN]; 中国江苏省南京市 江宁区诚信大道19号 19# Chengxin Avenue, Jiangning District Nanjing, Jiangsu 211106, CN
南京南瑞集团公司 NARI GROUP CORPORATION [CN/CN]; 中国江苏省南京市 江宁区诚信大道19号 19# Chengxin Avenue, Jiangning District Nanjing, Jiangsu 211106, CN
Inventors:
谢东亮 XIE, Dongliang; CN
薛禹胜 XUE, Yusheng; CN
宋晓芳 SONG, Xiaofang; CN
薛峰 XUE, Feng; CN
Agent:
南京知识律师事务所 NANJING ZHISHI LAW FIRM OF INTELLECTUAL PROPERTY; 中国江苏省南京市 新模范马路5号南京科技广场B座9楼 9F, Block B, Nanjing Sci-Tech Center 5#, Xinmofan Road Nanjing, Jiangsu 210009, CN
Priority Data:
201610933267.531.10.2016CN
Title (EN) VALUE NETWORK-BASED METHOD FOR ENERGY STORAGE SYSTEM SCHEDULING OPTIMIZATION
(FR) PROCÉDÉ BASÉ SUR UN RÉSEAU DE VALEURS PERMETTANT UNE OPTIMISATION DE PLANIFICATION DE SYSTÈME DE STOCKAGE D'ÉNERGIE
(ZH) 一种基于价值网络的储能系统调度优化方法
Abstract:
(EN) A value network-based method for energy storage system scheduling optimization. The method uses a strategy of an energy storage system automatically adjusting an output plan thereof in the context of time variance of an energy value so as to achieve the maximum energy value: first performing rasterization on a 2D bounded state space enclosed by a time and an energy storage state; constructing a value network according to a time reverse sequence, wherein each unit in the network corresponds to a point of a state space; the value thereof calculating the maximum value from a state point to an ending state point of a scheduling cycle, an output plan corresponding to the maximum value chain recorded by a starting state point of the scheduling cycle being an optimal solution under rasterization accuracy; creating a state space with a finer granularity close to a low-accuracy solution of an output plan in a previous step, and repeating said process to drive solution convergence by means of repeated iteration until accuracy meets a requirement. The method has high solution accuracy, fast convergence, and good robustness, and may better ensure the economic efficiency and reliability of energy storage system regulation and control.
(FR) L'invention concerne un procédé basé sur un réseau de valeurs permettant une optimisation de planification de système de stockage d'énergie. Le procédé fait appel à une stratégie d'un système de stockage d'énergie réglant automatiquement un plan de sortie correspondant dans le contexte d'une variation temporelle d'une valeur d'énergie afin d'obtenir la valeur d'énergie maximale, et consiste : à effectuer d'abord un tramage sur un espace d'état délimité 2D délimité par une durée et un état de stockage d'énergie ; à construire un réseau de valeurs selon une séquence inverse temporelle, chaque unité dans le réseau correspondant à un point d'un espace d'état, la valeur correspondante calculant la valeur maximale d'un point d'état à un point d'état de fin d'un cycle de planification, un plan de sortie correspondant à la chaîne de valeur maximale enregistrée par un point d'état de départ du cycle de planification étant une solution optimale sous précision de tramage ; à créer un espace d'état d'une granularité plus fine proche d'une solution à faible précision d'un plan de sortie dans une étape précédente et répéter ledit processus de façon à mener à une convergence de solution au moyen d'une itération répétée jusqu'à ce que la précision réponde à une exigence. Le procédé présente une précision de solution élevée, une convergence rapide et une bonne robustesse, et permet de mieux garantir l'efficacité économique et la fiabilité de la régulation et de la commande du système de stockage d'énergie.
(ZH) 一种基于价值网络的储能系统调度优化方法。该方法以能量价值时变背景下储能系统自动调节其出力计划以达到最大能量价值为策略,首先对时间及储能状态围成的2维有界状态空间进行栅格化处理,依时间逆序构造价值网络,网络中每个单元对应于状态空间的一点,其值计算从该状态点到达调度周期终结状态点的最大价值,则调度周期起始状态点记录的最大价值链对应的出力计划即为该栅格化精度下的优化解,在前一步出力计划低精度解附近生成粒度更细的状态空间,重复上述过程,通过反复迭代促使解收敛至精度满足要求。该方法求解精度高,收敛快,鲁棒性好,能够更好地保证储能系统调控的经济性及可靠性。
front page image
Designated States: AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DJ, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JO, JP, KE, KG, KH, KN, KP, KR, KW, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW
African Regional Intellectual Property Organization (ARIPO) (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW)
Eurasian Patent Office (AM, AZ, BY, KG, KZ, RU, TJ, TM)
European Patent Office (EPO) (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR)
African Intellectual Property Organization (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG)
Publication Language: Chinese (ZH)
Filing Language: Chinese (ZH)