Search International and National Patent Collections

1. (WO2017032210) CLUSTER ANALYSIS BASED POWER TRANSMISSION LINE MOUNTAIN FIRE RISKY AREA DIVISION METHOD

Pub. No.:    WO/2017/032210    International Application No.:    PCT/CN2016/093181
Publication Date: Fri Mar 03 00:59:59 CET 2017 International Filing Date: Fri Aug 05 01:59:59 CEST 2016
IPC: G06Q 50/06
Applicants: STATE GRID CORPORATION OF CHINA
国家电网公司
STATE GRID HUNAN ELECTRIC POWER COMPANY
国网湖南省电力公司
STATE GRID HUNAN ELECTRIC COMPANY DISASTER PREVENTION AND REDUCTION CENTER
国网湖南省电力公司防灾减灾中心
Inventors: LU, Jiazheng
陆佳政
ZHOU, Tejun
周特军
ZHANG, Hongxian
张红先
FANG, Zhen
方针
LI, Bo
李波
WU, Chuanping
吴传平
Title: CLUSTER ANALYSIS BASED POWER TRANSMISSION LINE MOUNTAIN FIRE RISKY AREA DIVISION METHOD
Abstract:
A cluster analysis based power transmission line mountain fire risky area division method, which falls within the technical field of power transmission and distribution. Based on satellite fire point monitoring data, according to a proposed cluster distance index, a sample sequence is moved to another cluster, and a cluster result is obtained by calculating the cluster distance index many times and moving same, so as to obtain power transmission line mountain fire risky distribution area division of a research area, serving as a basis for a refined forecast of power transmission line mountain fires and prevention and control of the power transmission line mountain fires. The method can be used to guide the deployment of fire extinguishing teams and fire extinguishing materials in a power transmission line mountain fire high-prevalence area, thereby enhancing the power grid mountain fire extinguishing capability.