Processing

Please wait...

Settings

Settings

Goto Application

1. WO2017030778 - COLD PLANER MATERIAL TRANSPORT MANAGEMENT SYSTEM

Publication Number WO/2017/030778
Publication Date 23.02.2017
International Application No. PCT/US2016/045108
International Filing Date 02.08.2016
IPC
G06Q 50/08 2012.01
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
08Construction
E01C 23/12 2006.01
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
23Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
06Devices or arrangements for working the finished surface; Devices for repairing the surface of damaged paving
12for taking-up, tearing-up, or breaking-up paving
G06Q 10/06 2012.01
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
CPC
E01C 23/088
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
23Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
06Devices or arrangements for working the finished surface
08for roughening or patterning; for removing ; the surface down to a predetermined depth; high spots or material bonded to the surface, e.g. markings; ; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades
085using power-driven tools, e.g. vibratory tools
088Rotary tools, e.g. milling drums
G05D 1/0027
GPHYSICS
05CONTROLLING; REGULATING
DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
1Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
0011associated with a remote control arrangement
0027involving a plurality of vehicles, e.g. fleet or convoy travelling
G06Q 10/06311
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
063Operations research or analysis
0631Resource planning, allocation or scheduling for a business operation
06311Scheduling, planning or task assignment for a person or group
G06Q 10/0637
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
063Operations research or analysis
0637Strategic management or analysis
G08G 1/123
GPHYSICS
08SIGNALLING
GTRAFFIC CONTROL SYSTEMS
1Traffic control systems for road vehicles
123indicating the position of vehicles, e.g. scheduled vehicles; ; Managing passenger vehicles circulating according to a fixed timetable, e.g. buses, trains, trams
Applicants
  • CATERPILLAR PAVING PRODUCTS INC. [US]/[US]
Inventors
  • MARSOLEK, John L.
  • ENGELMANN, Eric S.
Agents
  • PHILLIPS, Andrew A.
  • CARTER, Janda M.
  • EARLE, Kevin C.
  • LUNDQUIST, Steve D.
  • MONTEITH, JR., J. Derel
  • SHAH, Shital A.
Priority Data
14/827,44317.08.2015US
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) COLD PLANER MATERIAL TRANSPORT MANAGEMENT SYSTEM
(FR) SYSTÈME DE GESTION DE TRANSPORT DE MATÉRIAU POUR UNE FRAISEUSE À FROID
Abstract
(EN)
A management system (68) for a cold planer (10) is disclosed. The management system may include one or more sensors (70) located onboard the cold planer and configured to generate data regarding at least one of cold planer operating parameters and milled material transferred from the cold planer to a plurality of haul vehicles (16, 18, 19). The management system may also include a locating device (24) configured to generate a signal indicative of a cold planer location, a communication device (22) configured to transfer information from the cold planer to a plant, and a controller (26) in electronic communication with the one or more, the locating device, and the communication device. The controller may be configured to determine a rate of material transfer from the cold planer to the plurality of haul vehicles based on the data, and transmit the rate of material transfer and the cold planer location to the plant via the communication device.
(FR)
L'invention concerne un système de gestion (68) pour une fraiseuse à froid (10). Ledit système de gestion peut comprendre un ou plusieurs capteurs (70) embarqués sur la fraiseuse à froid et conçus pour générer des données concernant des paramètres de fonctionnement de la fraiseuse à froid et/ou du matériau broyé transféré de la fraiseuse à froid à une pluralité de véhicules de transport routier (16, 18, 19). Le système de gestion peut également comprendre un dispositif de localisation (24) conçu pour générer un signal indiquant un emplacement de la fraiseuse à froid, un dispositif de communication (22) conçu pour transférer des informations de la fraiseuse à froid à une usine, et un contrôleur (26) en communication électronique avec le dispositif de localisation et/ou le dispositif de communication. Le contrôleur peut être conçu pour déterminer une vitesse de transfert du matériau de la fraiseuse à froid à la pluralité de véhicules de transport routier sur la base des données, et transmettre la vitesse de transfert de matériau et l'emplacement de la fraiseuse à froid à l'usine par l'intermédiaire du dispositif de communication.
Latest bibliographic data on file with the International Bureau