1. WO2016139836 - SYSTEM FOR FORMULATING OPERATION PLAN FOR POWER GENERATION FACILITY, AND METHOD FOR FORMULATING OPERATION PLAN FOR POWER GENERATION FACILITY

Publication Number WO/2016/139836
Publication Date 09.09.2016
International Application No. PCT/JP2015/076991
International Filing Date 24.09.2015
IPC
H02J 3/00 2006.01
HELECTRICITY
02GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
G06F 19/00 2011.01
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
FELECTRIC DIGITAL DATA PROCESSING
19Digital computing or data processing equipment or methods, specially adapted for specific applications
G06Q 50/06 2012.01
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
06Electricity, gas or water supply
CPC
G05B 15/02
GPHYSICS
05CONTROLLING; REGULATING
BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
15Systems controlled by a computer
02electric
G06Q 10/04
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
G06Q 10/0631
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
063Operations research or analysis
0631Resource planning, allocation or scheduling for a business operation
G06Q 30/0202
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
30Commerce, e.g. shopping or e-commerce
02Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
0202Market predictions or demand forecasting
G06Q 50/06
GPHYSICS
06COMPUTING; CALCULATING; COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
06Electricity, gas or water supply
H02J 2203/20
HELECTRICITY
02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
2203Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Applicants
  • 三菱重工業株式会社 MITSUBISHI HEAVY INDUSTRIES, LTD. [JP]/[JP]
Inventors
  • 岸 真人 KISHI, Makoto
  • 松尾 淳 MATSUO, Atsushi
  • 後藤 征司 GOTO, Seiji
  • 秋山 陽 AKIYAMA, Yo
Agents
  • 真田 有 SANADA, Tamotsu
Priority Data
2015-04035102.03.2015JP
Publication Language Japanese (JA)
Filing Language Japanese (JA)
Designated States
Title
(EN) SYSTEM FOR FORMULATING OPERATION PLAN FOR POWER GENERATION FACILITY, AND METHOD FOR FORMULATING OPERATION PLAN FOR POWER GENERATION FACILITY
(FR) SYSTÈME DE FORMULATION DE PLAN D'EXPLOITATION POUR INSTALLATION DE PRODUCTION D'ÉNERGIE, ET PROCÉDÉ DE FORMULATION DE PLAN D'EXPLOITATION POUR INSTALLATION DE PRODUCTION D'ÉNERGIE
(JA) 発電設備の運転計画策定システム及び発電設備の運転計画策定方法
Abstract
(EN)
Provided is a system for formulating an operation plan for a power generation facility and a method for formulating an operation plan for a power generation facility, configured so that it is possible to formulate a highly profitable operation plan. A system and method for formulating an operation plan for a power generation facility with which it is possible to execute any of a power-selling operation mode, a no-load operation mode, and a stop mode, wherein: the expected power-selling price and the power generation cost are compared and it is determined whether the expected power-selling price is higher than the power generation cost; on the basis of the result of the determination, loss indices are calculated for the power-selling operation mode, the no-load operation mode, and the stop mode for the loss period during which the expected power-selling price is at or lower than the power generation cost using formula (1) shown below; and the operation mode having the lowest loss index is selected, whereby the operation plan is formulated. Loss index = power-selling loss + maintenance loss + operation loss not contributing to power-selling (1)
(FR)
L'invention concerne un système de formulation d'un plan d'exploitation pour une installation de production d'énergie et un procédé de formulation d'un plan d'exploitation pour une installation de production d'énergie, configurés de manière qu'il soit possible de formuler un plan d'exploitation très rentable. Un système et un procédé de formulation d'un plan d'exploitation pour une installation de production d'énergie avec laquelle il est possible d'exécuter un mode quelconque parmi un mode de fonctionnement avec vente d'énergie, un mode de fonctionnement à vide et un mode d'arrêt sont décrits, dans lesquels : le prix de vente d'énergie attendu et le coût de production d'énergie sont comparés et il est déterminé si le prix de vente d'énergie attendu est supérieur au coût de production d'énergie ; sur la base du résultat de la détermination, des indices de perte sont calculés pour le mode de fonctionnement avec vente d'énergie, le mode de fonctionnement à vide et le mode d'arrêt pour une période de perte pendant laquelle le prix de vente d'énergie attendu est inférieur ou égal au coût de production d'énergie, à l'aide de la formule (1) présentée ci-dessous ; et le mode de fonctionnement ayant le plus faible indice de perte est sélectionné, moyennant quoi le plan d'exploitation est formulé. Indice de perte = perte de vente d'énergie + perte de maintenance + perte d'exploitation ne contribuant pas à la vente d'énergie (1)
(JA)
 利益性の高い運転計画を策定できるようにした、発電設備の運転計画策定システム及び発電設備の運転計画策定方法を提供する。 売電運転モード,無負荷運転モード及び停止モードの何れかの運用モードを実行可能な発電設備の運転計画を策定するものであって、予想売電価格と発電コストとの比較を行って、前記予想売電価格が前記発電コストよりも高いか否かを判定し、その判定結果に基づいて、前記予想売電価格が前記発電コスト以下の損失期間について、前記売電運転モード,前記無負荷運転モード及び前記停止モードについて下式(1)により損失指標を算出し、損失指標の最も少ない運用モードを選択することで前記運転計画を策定する。 損失指標=売電損失+メンテナンス損失+売電に寄与しない運用損失…(1)