1. WO2015147674 - METHOD FOR INSTALLING OVERHEAD TRANSMISSION LINE SUPPORTS IN PERMAFROST SOILS

Publication Number WO/2015/147674
Publication Date 01.10.2015
International Application No. PCT/RU2014/000209
International Filing Date 28.03.2014
IPC
E02D 27/35 2006.1
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
27Foundations as substructures
32Foundations for special purposes
35Foundations formed in frozen ground, e.g. in permafrost soil
CPC
E02D 27/12
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
27Foundations as substructures
10Deep foundations
12Pile foundations
E02D 27/35
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
27Foundations as substructures
32Foundations for special purposes
35Foundations formed in frozen ground, e.g. in permafrost soil
E02D 27/42
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
27Foundations as substructures
32Foundations for special purposes
42Foundations for poles, masts or chimneys
E02D 31/14
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
31Protective arrangements for foundations or foundation structures
10against soil pressure or hydraulic pressure
14against frost heaves in soil
E02D 5/60
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
5Bulkheads, piles, or other structural elements specially adapted to foundation engineering
22Piles
60Piles with protecting cases
E02D 7/02
EFIXED CONSTRUCTIONS
02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS
7Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
02Placing by driving
Applicants
  • ПУБЛИЧНОЕ АКЦИОНЕРНОЕ ОБЩЕСТВО "ТРАНСНЕФТЬ" PUBLIC JOINT STOCK COMPANY "TRANSNEFT" [RU]/[RU]
  • АКЦИОНЕРНОЕ ОБЩЕСТВО "ТРАНСНЕФТЬ - СИБИРЬ" JOINT-STOCK COMPANY "TRANSNEFT SIBERIA" [RU]/[RU]
  • ОБЩЕСТВО С ОГРАНИЧЕННОЙ ОТВЕТСТВЕННОСТЬЮ "НАУЧНО-ИССЛЕДОВАТЕЛЬСКИЙ ИНСТИТУТ ТРАНСПОРТА НЕФТИ И НЕФТЕПРОДУКТОВ ТРАНСНЕФТЬ" LIMITED LIABILITY COMPANY "TRANSNEFT RESEARCH AND DEVELOPMENT INSTITUTE FOR OIL AND OIL PRODUCTS TRANSPORTATION" [RU]/[RU]
Inventors
  • РЕВЕЛЬ-МУРОЗ, Павел Александрович REVEL-MUROZ, Pavel Alexksandrovich
  • СМИРНОВ, Николай Владимирович SMIRNOV, Nikolai Vladimirovich
  • КУМАЛЛАГОВ, Виталий Александрович KUMALLAGOV, Vitaly Aleksandrovich
  • СЕМИН, Евгений Евгеньевич SEMIN, Evgenii Evgenievich
  • ИВАКИН, Александр Владимирович IVAKIN, Alexandr Vladimirovich
  • БОГАТЕНКОВ, Юрий Васильевич BOGATENKOV, Yury Vasilevich
  • ЗОТОВ, Михаил Юрьевич ZOTOV, Mikhail Yurevich
Agents
  • ВИДЯКИНА, Ольга Валентиновна VIDYAKINA, Olga Valentinovna
Priority Data
Publication Language Russian (ru)
Filing Language Russian (RU)
Designated States
Title
(EN) METHOD FOR INSTALLING OVERHEAD TRANSMISSION LINE SUPPORTS IN PERMAFROST SOILS
(FR) PROCÉDÉ DE DÉVELOPPEMENT DE SUPPORTS DE LIGNE AÉRIENNE DE TRANSMISSION DANS DES PERGÉLISOLS
(RU) СПОСОБ ОБУСТРОЙСТВА ОПОР ВОЗДУШНЫХ ЛИНИЙ ПЕРЕДАЧ НА ВЕЧНОМЕРЗЛЫХ ГРУНТАХ
Abstract
(EN) The invention relates to the field of power engineering, and more specifically to pile foundations for power transmission line supports which are to be installed in various types of soil. The invention can be used in constructing and repairing pile foundations for power transmission line supports, and also in other areas of industry in which piles are subject to horizontal loads and soil frost heave forces. The technical result consists in enhancing the horizontal load-bearing capacity of a pile. The aim is achieved by means of driving a casing pipe and lowering a pile into same, wherein, during the process of lowering the pile, rigid elements are installed on the shaft of the pile by means of welding, which process involves marking, on the pile, a zone for positioning the rigid elements and, during the driving of the pile, when the lower marking reaches the level of the top of the casing pipe, the gaps between the casing pipe and the pile are measured geometrically and the rigid elements are prepared on the basis of the results of the measurements; the rigid elements are welded-on in pairs from opposing sides in a single vertical plane, and the operation is repeated as the pipe is lowered.
(FR) L'invention e rapporte au domaine de la production électrique et concerne plus précisément des fondations de pylônes de support de lignes de transmission électrique dans divers types de sols. L'invention peut être utilisée lors de la construction et la réparation de fondation de pylônes sur supports de lignes de transmission électrique, ainsi que dans d'autres domaines de l'industrie lors du travail de pylônes sur des charges horizontales et lors de l'action sur un pylône de forces de soulèvement par gel du sol. Le résultat technique consiste en une meilleure fiabilité des capacités de support des pylônes lors de charges horizontales. Le résultat technique est atteint en enfonçant un coffrage et en y descendant un pylône; lors du processus d'enfoncement du pylône, on effectue le montage des éléments rigides sur le montant du pylône par soudure et, à cette fin, on effectue sur le pylône un marquage de la zone de disposition des éléments rigides. Lors de l'enfoncement du pylône, lors le marquage inférieur atteint le niveau du haut du coffrage, on effectue une mesure géométrique du jour entre le coffrage et le pylône et, en fonction des mesures, on prépare les éléments rigides que l'on soude par paires sur les côtés opposés dans un plan vertical, et l'opération est répétée au fur et à mesure de de la descente du coffrage.
(RU) Изобретение относится к области энергетики, а точнее к свайным фундаментам опор линий электропередач устраиваемых в различных типах грунтов. Изобретение может быть использовано при строительстве и ремонте свайных фундаментов опор линий электропередач, а так же в других отраслях промышленности при работе свай на горизонтальную нагрузку и при действии на сваю сил морозного пучения грунта. Технический результат заключается в повышении надежности несущей способности сваи на горизонтальные нагрузки. Поставленная задача решается тем, что забивают обсадную трубу и погружают в нее сваю, при этом в процессе погружения сваи выполняют монтаж жестких элементов на ствол сваи с помощью сварки, для чего на свае делают отметку зоны расположения жестких элементов, при забивке сваи, когда нижняя отметка достигает уровня верха обсадной трубы осуществляют геометрический замер зазоров между обсадной трубой и сваей и по результатам замеров изготавливают жесткие элементы, которые приваривают парами с противоположных сторон в одной вертикальной плоскости, по ходу погружения трубы операцию повторяют.