1. WO2014131323 - METHOD AND DEVICE FOR USING GANGUE ABOVEGROUND TO BACKFILL MINE GOAF

Publication Number WO/2014/131323
Publication Date 04.09.2014
International Application No. PCT/CN2014/071048
International Filing Date 22.01.2014
IPC
E21F 15/06 2006.1
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
15Methods or devices for placing filling-up materials in underground workings
06Filling-up mechanically
E21F 15/08 2006.1
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
15Methods or devices for placing filling-up materials in underground workings
08Filling-up hydraulically or pneumatically
CPC
E21F 13/002
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
13Transport specially adapted to underground conditions
002Crushing devices specifically for conveying in mines
E21F 15/08
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
15Methods or devices for placing filling-up materials in underground workings
08Filling-up hydraulically or pneumatically
Applicants
  • 中国矿业大学 CHINA UNIVERSITY OF MINING AND TECHNOLOGY [CN]/[CN]
Inventors
  • 杜长龙 DU, Changlong
  • 郑克洪 ZHENG, Kehong
  • 李建平 LI, Jianping
  • 杨道龙 YANG, Daolong
  • 罗晨旭 LUO, Chenxu
  • 江红祥 JIANG, Hongxiang
Agents
  • 南京瑞弘专利商标事务所(普通合伙) NANJING RUIHONG PATENT AND TRADEMARK OFFICE (GENERAL PARTNERSHIP)
Priority Data
201310064800.528.02.2013CN
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) METHOD AND DEVICE FOR USING GANGUE ABOVEGROUND TO BACKFILL MINE GOAF
(FR) PROCÉDÉ ET DISPOSITIF D'UTILISATION DE GANGUE AU-DESSUS DU SOL POUR REMBLAYER LES ANCIENS SITES MINIERS
(ZH) 井上矸石回填井下采空区的方法及设备
Abstract
(EN) Disclosed are a method and device for using the gangue aboveground to backfill a mine goaf, the method comprising: in the process of a gangue backfill, crushing the gangue aboveground via a double-roll crusher (4); then conveying the crushed gangue to the bottom of the mine via a material vertical conveyor (6); recrushing the fractions of the gangue in the mine via a double-roll crusher (8) so as to obtain the particle diameter required by a pneumatic conveyor (9); and finally transporting the recrushed gangue to backfill the goaf in the mine via the pneumatic conveyor (9). The method and device for using the mine gangue aboveground to backfill a goaf tunnel in the mine can safely and efficiently transport the gangue from the ground to the goaf in the mine at a depth of a few hundred meters from the ground so as to backfill the goaf in the mine, thus saving the floor area occupied by the gangue piled on the ground, and reducing the danger of earth surface subsidence.
(FR) L'invention concerne un procédé et un dispositif visant à utiliser la gangue au-dessus du sol pour remblayer les anciens sites miniers, le procédé comprenant les étapes suivantes : dans le processus de remblayage de gangue, broyer la gangue au-dessus du sol par le biais d'un concasseur (4) à deux cylindres dentés; puis transporter la gangue broyée vers le fond de la mine par le biais d'un transporteur (6) vertical de matériau; broyer de nouveau les fractions de gangue dans la mine par le biais d'un concasseur (8) à deux cylindres dentés, de manière à obtenir le diamètre de particules requis par un transporteur (9) pneumatique; et enfin transporter la gangue de nouveau broyée pour remblayer les anciens sites miniers dans la mine par le biais du transporteur (9) pneumatique. Le procédé et le dispositif d'utilisation de la gangue de mine au-dessus du sol pour remblayer un tunnel d'ancien site dans la mine peuvent transporter de manière sûre et efficace la gangue depuis le sol vers les vieux travaux dans la mine, à une profondeur de quelques centaines de mètres du sol, de manière à remblayer les anciens sites dans la mine, économisant ainsi la zone du sol occupée par la gangue empilée sur le sol et réduisant le danger d'affaissement de la surface de la terre.
(ZH) 一种井上矸石回填井下采空区的方法及设备被公开。该方法是在矸石回填过程中,先将矸石在井上地面通过井上对辊式破碎机(4)进行破碎,然后将破碎后的矸石通过垂直式物料投放机(6)输送至井下,在井下通过井下对辊式破碎机(8)对矸石碎块进行再次破碎,以达到适应气力输送装置(9)需要的粒径大小,最后再通过气力输送装置(9)输送至井下采空区进行回填。井上矸石回填井下采空巷道的设备及方法可以安全、高效地将矸石从地面输送到距离地面几百米深的井下采空区进行回填,节约了地面矸石堆积占地面积,降低了地表塌陷危险。