Processing

Please wait...

Settings

Settings

Goto Application

1. WO2013016097 - SYSTEM AND METHOD FOR PRODUCTION OF RESERVOIR FLUIDS

Publication Number WO/2013/016097
Publication Date 31.01.2013
International Application No. PCT/US2012/047178
International Filing Date 18.07.2012
IPC
E21B 33/122 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
33Sealing or packing boreholes or wells
10in the borehole
12Packers; Plugs
122Multiple-string packers
E21B 19/16 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
19Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
16Connecting or disconnecting pipe couplings or joints
E21B 19/08 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
19Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
CPC
E21B 17/18
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
17Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables;; Casings; Tubings
18Pipes provided with plural fluid passages
E21B 33/12
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
33Sealing or packing boreholes or wells
10in the borehole
12Packers; Plugs
E21B 43/121
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
121Lifting well fluids
E21B 43/122
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
121Lifting well fluids
122Gas lift
E21B 43/305
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
30Specific pattern of wells, e.g. optimizing the spacing of wells
305comprising at least one inclined or horizontal well
Applicants
  • EVOLUTION PETROLEUM CORPORATION [US]/[US] (AllExceptUS)
  • MAZZANTI, Daryl, V. [US]/[US] (UsOnly)
Inventors
  • MAZZANTI, Daryl, V.
Agents
  • OSTFELD, David, M.
Priority Data
13/190,07825.07.2011US
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) SYSTEM AND METHOD FOR PRODUCTION OF RESERVOIR FLUIDS
(FR) SYSTÈME ET PROCÉDÉ DE PRODUCTION DE FLUIDES DE RÉSERVOIR
Abstract
(EN)
An artificial lift system removes reservoir fluids from a wellbore. A gas lift system is disposed in a first tubing string anchored by a packer, and a downhole pump, or alternative plunger lift, may be positioned with a second tubing string. A dual string anchor may be disposed with the first tubing string to limit the movement of the second tubing string. The second tubing string may be removably attached with the dual string anchor with an on-off tool without disturbing the first tubing string. A one-way valve may also be used to allow reservoir fluids to flow into the first tubing string in one direction only. The second tubing string may be positioned within the first tubing string and the injected gas may travel down the annulus between the first and second tubing strings. A bi-flow connector may anchor the second string to the first string and allow reservoir liquids in the casing tubing annulus to pass through the connector to the downhole pump. Injected gas may be allowed to pass vertically through the bi- flow connector to lift liquids from below the downhole pump to above the downhole pump. The bi-flow connector prevents the downwardly injected gas from interfering with the reservoir fluids flowing through the bi-flow connector. In another embodiment, gas from the reservoir lifts reservoir liquids from below the downhole pump to above the downhole pump. A first tubing string may contain a downhole pumping system or alternative plunger lift above a packer assembly. A concentric tubing system below the packer may lift liquids using the gas from the reservoir.
(FR)
Un système de soulèvement artificiel reitre des fluides de réservoir d'un puits de forage. Un système de soulèvement à gaz est disposé dans une première colonne de production ancrée par une garniture d'étanchéité, et une pompe de fond de trou, ou autre piston-plongeur, peut être positionné avec une seconde colonne de production. Un double organe d'ancrage de colonne peut équiper la première colonne de production afin de limiter le déplacement de la seconde colonne de production. La seconde colonne de production peut être fixée amovible au double organe d'ancrage de colonne à l'aide d'un outil on-off sans gêner la première colonne de production. Un clapet unidirectionnel peut être également utilisé pour permettre aux fluides de réservoir de s'écouler dans la première colonne de production dans une seule direction. La seconde colonne de production peut être positionnée dans la première colonne de production et le gaz injecté peut descendre l'espace annulaire entre les première et seconde colonnes de production. Un raccord à double écoulement peut ancrer la seconde colonne à la première colonne et permettre aux liquides de réservoir contenus dans l'espace annulaire du tube de forage de traverser le raccord jusqu'à la pompe de fond de trou. Le gaz injecté peut être autorisé à passer verticalement à travers le raccord à double écoulement pour soulever les liquides depuis le dessous de la pompe de fond de trou jusqu'au-dessus de la pompe de fond de trou. Le raccord à double écoulement empêche le gaz injecté vers le bas d'interférer avec les fluides de réservoir s'écoulant dans le raccord à double écoulement. Dans un autre mode de réalisation, le gaz provenant du réservoir soulève les liquides de réservoir depuis le dessous de la pompe de fond de trou jusqu'au-dessus de la pompe de fond de trou. Une première colonne de production peut contenir un système de pompage de fond de trou ou autre piston-plongeur au-dessus d'un ensemble garniture d'étanchéité. Un système de tubage concentrique situé sous la garniture d'étanchéité peut soulever les liquides à l'aide du gaz provenant du réservoir.
Latest bibliographic data on file with the International Bureau