Processing

Please wait...

Settings

Settings

Goto Application

1. WO2012065295 - SYSTEM AND METHOD FOR GAS DRAINAGE AND OUTBURST PREVENTION IN COAL SEAM BY DRILL-CUT LINKAGE OF LONG DRILLING HOLE AND HIGH PRESSURE WATER JET

Publication Number WO/2012/065295
Publication Date 24.05.2012
International Application No. PCT/CN2010/078749
International Filing Date 15.11.2010
IPC
E21F 7/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
7Methods or devices for drawing-off gases with or without subsequent use of the gas for any purpose
E21B 17/18 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
17Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Casings; Tubings
18Pipes provided with plural fluid passages
CPC
E21B 43/29
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
29Obtaining a slurry of minerals, e.g. by using nozzles
E21F 7/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
7Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Applicants
  • 湖南汉寿中煤科技有限公司 HUNAN HANSHOU CHINA COAL TECHNOLOGIES CORP., LTD [CN]/[CN] (AllExceptUS)
  • 陆庭侃 LU, Tingkan [AU]/[CN] (UsOnly)
  • 李健 LI, Jian [CN]/[CN] (UsOnly)
  • 高德安 GAO, Dean [CN]/[CN] (UsOnly)
  • 李一民 LI, Yimin [CN]/[CN] (UsOnly)
Inventors
  • 陆庭侃 LU, Tingkan
  • 李健 LI, Jian
  • 高德安 GAO, Dean
  • 李一民 LI, Yimin
Agents
  • 深圳市千纳专利代理有限公司 SHENZHEN QIANNA PATENT AGENCY LTD.
Priority Data
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) SYSTEM AND METHOD FOR GAS DRAINAGE AND OUTBURST PREVENTION IN COAL SEAM BY DRILL-CUT LINKAGE OF LONG DRILLING HOLE AND HIGH PRESSURE WATER JET
(FR) SYSTÈME ET PROCÉDÉ DE PRÉVENTION D'ASPIRATION DU GAZ ET DE DÉGAGEMENT DE GRISOU DANS UNE VEINE DE CHARBON AU MOYEN D'UNE TRINGLERIE DE DÉBLAIS DE FORAGE DE LONG-TROU ET D'UN JET D'EAU À HAUTE PRESSION
(ZH) 超长钻孔高压水射流钻割联动煤层瓦斯抽放与防突系统及方法
Abstract
(EN)
System and method for gas drainage and outburst prevention in coal seam by a drill-cut linkage of long drilling hole and high pressure water jet are provided. The system comprises a drill bit(9),a pressure induction valve(8),a drill rod(7),a drill machine(5), a high-low pressure water delivery and rotation device(6),a high pressure pump(3) and a water tank(1).The pressure induction valve(8) is mounted on the front end of the drill rod(7).The drill bit(9) is mounted on the front end of the pressure induction valve(8).A nozzle(22) is arranged on the outside of the pressure induction valve(8).The drill machine(5) drives the drill rod(7) to rotate. Water in the water tank(1) is delivered to the high-low pressure water delivery and rotation device(6) by the high pressure pump(3), into the drill rod(7) through the high-low pressure water delivery and rotation device(6), and to the pressure induction valve(8) through the drill rod(7). In the process of withdrawal of drill, coal seam is cut by high pressure water, which achieves the drill-cut linkage, improving work efficiency. The cutting diameter of the system is more than three meters, which increases the gas exposed area to more than six times of a conventional gas exposed area, and increases the range of gas release to more than three times of a conventional range of gas release, solving the problem of gas drainage and outburst prevention in coal seam.
(FR)
Système et procédé de prévention d'aspiration du gaz et de dégagement de grisou dans une veine de charbon au moyen d'une tringlerie de déblais de forage de long-trou et d'un jet d'eau à haute pression. Le système comprend un trépan (9), une soupape d'admission de pression (8), une tige de forage (7), une machine de forage (5), un dispositif de rotation et de distribution d'eau à haute ou basse pression (6), une pompe haute pression (3) et un réservoir d'eau (1). La soupape d'admission de pression (8) est montée sur l'extrémité avant de la tige de forage (7). Le trépan (9) est monté sur l'extrémité avant de la soupape d'admission de pression (8). Une buse (22) est disposée sur le côté extérieur de la soupape d'admission de pression (8). La machine de forage (5) entraîne en rotation la tige de forage (7). L'eau du réservoir d'eau (1) est envoyée par la pompe haute pression (3) dans la tige de forage (7) à travers le dispositif de rotation et de distribution d'eau à haute ou basse pression (6), et à la soupape d'admission de pression (8) à travers la tige de forage (7). Lors du processus de retrait du trépan, la veine de charbon est fendue par l'eau à haute pression qui assure la tringlerie de déblais de forage, améliorant ainsi le rendement de travail. Le diamètre de coupe du système est supérieure à trois mètres, ce qui augmente de plus de six fois la zone d'exposition au gaz par rapport à une zone d'exposition au gaz classique, et élargit de plus de trois fois la plage de libération du gaz par rapport à une plage de libération du gaz classique. Le problème de prévention de l'aspiration du gaz et du dégagement de grisou dans une veine de charbon est ainsi résolu.
Latest bibliographic data on file with the International Bureau