Processing

Please wait...

Settings

Settings

1. WO2012063409 - OPERATION PLANNING METHOD, OPERATION PLANNING DEVICE, METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY SYSTEM, AND METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY AND HEATING SYSTEM

Publication Number WO/2012/063409
Publication Date 18.05.2012
International Application No. PCT/JP2011/005824
International Filing Date 18.10.2011
IPC
H ELECTRICITY
02
GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
J
CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3
Circuit arrangements for ac mains or ac distribution networks
38
Arrangements for parallelly feeding a single network by two or more generators, converters, or transformers
F MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
24
HEATING; RANGES; VENTILATING
H
FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, IN GENERAL
1
Water heaters having heat generating means, e.g. boiler, flow-heater, water-storage heater
H02J 3/38 (2006.01)
F24H 1/00 (2006.01)
CPC
F24D 19/1039
F24D 2200/02
F24D 2200/08
F24D 2200/12
F24H 2240/09
G05D 23/1924
Applicants
  • パナソニック株式会社 PANASONIC CORPORATION [JP/JP]; 大阪府門真市大字門真1006番地 1006, Oaza Kadoma, Kadoma-shi, Osaka 5718501, JP (AllExceptUS)
  • 林田 岳 HAYASHIDA, Gaku; null (UsOnly)
Inventors
  • 林田 岳 HAYASHIDA, Gaku; null
Agents
  • 新居 広守 NII, Hiromori; 大阪府大阪市淀川区西中島5丁目3番10号タナカ・イトーピア新大阪ビル6階新居国際特許事務所内 c/o NII Patent Firm, 6F, Tanaka Ito Pia Shin-Osaka Bldg.,3-10, Nishi Nakajima 5-chome, Yodogawa-ku, Osaka-city, Osaka 5320011, JP
Priority Data
2010-25234110.11.2010JP
Publication Language Japanese (JA)
Filing Language Japanese (JA)
Designated States
Title
(EN) OPERATION PLANNING METHOD, OPERATION PLANNING DEVICE, METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY SYSTEM, AND METHOD FOR OPERATING HEAT PUMP HOT-WATER SUPPLY AND HEATING SYSTEM
(FR) PROCÉDÉ DE PLANIFICATION DE FONCTIONNEMENT, DISPOSITIF DE PLANIFICATION DE FONCTIONNEMENT, PROCÉDÉ DE MISE EN OEUVRE DE SYSTÈME D'ALIMENTATION EN EAU CHAUDE À POMPE À CHALEUR, ET PROCÉDÉ DE MISE EN OEUVRE D'UNE ALIMENTATION EN EAU CHAUDE À POMPE À CHALEUR ET SYSTÈME DE CHAUFFAGE
(JA) 運転計画方法、運転計画装置、ヒートポンプ式給湯システムの運転方法、及びヒートポンプ式給湯暖房システムの運転方法
Abstract
(EN)
An operation planning method is a method for creating an operation plan for a second power load in a system provided with a power generating device, a first power load which operates using power generated by the power generating device, and a second power load which generates heat using the power generated by the power generating device. More specifically, the operation planning method comprises a prediction step (S101) for predicting the generated power amount generated by the power generating device (S102) and the consumed power amount consumed by the first power load in respective time zones separated by unit time, and an operation planning step (S103-S105) for creating the operation plan for the second power load so as to operate the second power load in an operation time zone including a time zone in which the reverse power amount obtained by subtracting the consumed power amount from the generated power amount becomes maximum.
(FR)
Un procédé de planification de fonctionnement est un procédé pour créer un plan de fonctionnement pour une seconde charge de puissance dans un système pourvu d'un dispositif de génération de puissance, une première charge de puissance qui fonctionne en utilisant la puissance générée par le dispositif de génération de puissance, et une seconde charge de puissance qui génère de la chaleur en utilisant la puissance générée par le dispositif de génération de puissance. Plus spécifiquement, le procédé de planification de fonctionnement comprend une étape de prédiction (S101) pour prédire la quantité de puissance générée qui est générée par le dispositif de génération de puissance (S102) et la quantité de puissance consommée qui est consommée par la première charge de puissance dans des tranches de temps respectives séparées par un temps unitaire, et une étape de planification de fonctionnement (S103 à S105) pour créer le plan de fonctionnement pour la seconde charge de puissance de manière à mettre en oeuvre la seconde charge de puissance dans une tranche de temps de fonctionnement comprenant une tranche de temps dans laquelle la quantité de puissance inverse obtenue en soustrayant la quantité de puissance consommée de la quantité de puissance générée devient maximum.
(JA)
 運転計画方法は、発電装置と、発電装置で発電された電力を用いて動作する第1の電力負荷と、発電装置で発電された電力を用いて熱を生成する第2の電力負荷とを備えるシステムにおいて、第2の電力負荷の運転計画を立案する方法である。具体的には、単位時間に区切られた各時間帯において、発電装置で発電される発電電力量(S102)と、第1の電力負荷で消費される消費電力量とを予測する予測ステップ(S101)と、発電電力量から消費電力量を減算して得られる逆潮電力量が最も多くなる時間帯を含む運転時間帯に第2の電力負荷を動作させるように、第2の電力負荷の運転計画を立案する運転計画ステップ(S103~S105)とを含む。
Latest bibliographic data on file with the International Bureau