Processing

Please wait...

PATENTSCOPE will be unavailable a few hours for maintenance reason on Tuesday 25.01.2022 at 9:00 AM CET
Settings

Settings

Goto Application

1. WO2011100009 - METHOD AND SYSTEM FOR CREATING HISTORY-MATCHED SIMULATION MODELS

Publication Number WO/2011/100009
Publication Date 18.08.2011
International Application No. PCT/US2010/056725
International Filing Date 15.11.2010
IPC
G06G 7/48 2006.1
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
GANALOGUE COMPUTERS
7Devices in which the computing operation is performed by varying electric or magnetic quantities
48Analogue computers for specific processes, systems, or devices, e.g. simulators
CPC
E21B 43/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
E21B 43/16
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
16Enhanced recovery methods for obtaining hydrocarbons
E21B 47/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
47Survey of boreholes or wells
G01V 1/282
GPHYSICS
01MEASURING; TESTING
VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
1Seismology; Seismic or acoustic prospecting or detecting
28Processing seismic data, e.g. analysis, for interpretation, for correction
282Application of seismic models, synthetic seismograms
G01V 11/00
GPHYSICS
01MEASURING; TESTING
VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
11Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
G01V 2210/66
GPHYSICS
01MEASURING; TESTING
VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
2210Details of seismic processing or analysis
60Analysis
66Subsurface modeling
Applicants
  • EXXONMOBIL UPSTREAM RESEARCH COMPANY [US]/[US] (AllExceptUS)
  • STERN, David [US]/[US] (UsOnly)
  • OYERINDE, Adedayo, S. [NG]/[US] (UsOnly)
  • SAHNI, Isha [IN]/[US] (UsOnly)
  • SUBRAMANIAN, Ganesan [US]/[US] (UsOnly)
Inventors
  • STERN, David
  • OYERINDE, Adedayo, S.
  • SAHNI, Isha
  • SUBRAMANIAN, Ganesan
Agents
  • JENSEN, Nathan, O.
Priority Data
61/304,00112.02.2010US
Publication Language English (en)
Filing Language English (EN)
Designated States
Title
(EN) METHOD AND SYSTEM FOR CREATING HISTORY-MATCHED SIMULATION MODELS
(FR) PROCÉDÉ ET SYSTÈME DE CRÉATION DE MODÈLES DE SIMULATION MIS EN CORRESPONDANCE AVEC UN HISTORIQUE
Abstract
(EN) A method for matching production history to flow simulations includes identifying a plurality of parameters that control an objective function measuring the mismatch between a flow simulation response in a parameter subspace and a production history. A value is calculated for an objective function and for a static measurement at each of a plurality of experiments in the parameter subspace. These results are used to develop a mathematical relationship between one or more static measurements and the objective function. During subsequent adjustment of the simulation model, a target window in the objective function is identified, and flow simulations are performed for each modified model that is predicted from the static geologic measurement to produce an objective function within the window. An objective function of each flow simulation to the production history is calculated and the procedure is iterated until the objective function is within a target range.
(FR) Un procédé de mise en correspondance d'un historique de production et de simulations de flux comprend l'étape consistant à identifier une pluralité de paramètres qui règlent une fonction objective mesurant la non-concordance entre une réponse à une simulation de flux dans un sous-espace d'un paramètre et un historique de production. A chaque essai d'une pluralité d'essais dans le sous-espace du paramètre, on calcule une valeur d'une fonction objective et d'une mesure statique. Ces résultats sont utilisés pour développer une relation mathématique entre une ou plusieurs mesures statiques et la fonction objective. Lors d'un ajustement ultérieur du modèle de simulation, on identifie une fenêtre cible dans la fonction objective et des simulations de flux sont effectuées pour chaque modèle modifié prédit à partir de la mesure géologique statique de façon à produire une fonction objective à l'intérieur de la fenêtre. Une fonction objective de chaque simulation de flux par rapport à l'historique de production est calculée et la procédure est répétée jusqu'à ce que la fonction objective se situe à l'intérieur d'une plage cible.
Latest bibliographic data on file with the International Bureau