Processing

Please wait...

Settings

Settings

Goto Application

1. WO2009155776 - A DILLING, LOADING, TRANSPORTING AND ANCHORING INTEGRATION MACHINE FOR LANEWAY IN COAL MINE

Publication Number WO/2009/155776
Publication Date 30.12.2009
International Application No. PCT/CN2009/000488
International Filing Date 05.05.2009
IPC
E21C 25/66 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
CMINING OR QUARRYING
25Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
66Machines for making slits with additional arrangements for drilling
E21C 35/20 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
CMINING OR QUARRYING
35Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/-E21C33/182
20General features of equipment for removal of chippings, e.g. for loading on conveyor
E21D 20/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
20Setting anchoring-bolts
CPC
E21C 35/20
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
CMINING OR QUARRYING
35Miscellaneous items relating to machines for slitting or completely freeing the mineral from the seam
20General features of equipment for removal of chippings, e.g. for loading on conveyor
E21D 20/003
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
20Setting anchoring-bolts
003Machines for drilling anchor holes and setting anchor bolts
Applicants
  • 闫振东 YAN, Zhendong [CN]/[CN]
Inventors
  • 闫振东 YAN, Zhendong
Agents
  • 北京金阙华进专利事务所(普通合伙) GOLDENGATE
Priority Data
200820125012.725.06.2008CN
Publication Language Chinese (ZH)
Filing Language Chinese (ZH)
Designated States
Title
(EN) A DILLING, LOADING, TRANSPORTING AND ANCHORING INTEGRATION MACHINE FOR LANEWAY IN COAL MINE
(FR) MACHINE DE FORAGE, DE CHARGEMENT, DE TRANSPORT ET D’INSTALLATION D’ANCRAGES POUR ALLÉE DE CIRCULATION DANS UNE MINE DE CHARBON
(ZH) 一种煤巷钻装运锚一体化机
Abstract
(EN)
A drilling, loading, transporting and anchoring integration machine for laneway in coal mine, it includes a caterpillar track part(3), a transporter part(4), a shovel plate(401), a provisional supporting part(5), two drilling rig parts(6) for lifting and swinging a top and a side anchor rod and anchor cable, and a hydraulic and operating system; the transporter part is comprised of a rake pawl(404), the first scraper transporter and the second scraper transporter, the rake pawl is mounted before the caterpillar track part and above the shovel plate; the first transporter is mounted after the shovel plate and in the middle of the two caterpillar track parts, the second scraper transporter is located near the back end of the first scraper transporter, the second scraper transporter may swing in a certain range, an operating platform is mounted on the caterpillar track part, two revolving beds for mounting the drilling rig parts are on the operating platform, and the two revolving beds are on the two sides of the operating platform, a fixed seat for fixing the provisional supporting part is in the middle of the operating platform, there are hydraulic and operating systems both on the operating platform and on the drilling rig parts.
(FR)
Machine de forage, de chargement, de transport et d’installation d’ancrages pour une allée de circulation dans une mine de charbon, comprenant une partie (3) sur chenilles, une partie (4) de convoyage, une plaque pelleteuse (401), une partie (5) de soutènement provisoire, deux parties (6) d’appareils de forage servant à soulever et à faire basculer une barre d’ancrage supérieure, une barre d’ancrage latérale et un câble d’ancrage, ainsi qu’un système hydraulique et de commande; la partie de convoyage est constituée d’un cliquet (404) de râtelier, d’un premier convoyeur de havage et d’un deuxième convoyeur de havage, le cliquet de râtelier étant monté en avant de la partie sur chenilles et au-dessus de la plaque pelleteuse; le premier convoyeur est monté en arrière de la plaque pelleteuse et en position centrale par rapport aux deux parties sur chenilles, le deuxième convoyeur de havage est situé près de l’extrémité arrière du premier convoyeur de havage, le deuxième convoyeur de havage peut osciller sur une certaine amplitude, une plate-forme de commande est montée sur la partie sur chenilles, deux bancs pivotants servant au montage des parties d’appareils de forage se trouvent sur la plate-forme de commande, les deux bancs pivotants se situant de part et d’autre de la plate-forme de commande, une embase fixe servant à fixer la partie de soutènement provisoire se situe au milieu de la plate-forme de commande, des systèmes hydrauliques et de commande étant installés aussi bien sur la plate-forme de commande que sur les parties d’appareils de forage.
Latest bibliographic data on file with the International Bureau