WIPO logo
Mobile | Deutsch | Español | Français | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Search International and National Patent Collections
World Intellectual Property Organization
Search
 
Browse
 
Translate
 
Options
 
News
 
Login
 
Help
 
Machine translation
1. (WO2007096377) MODEL-BASED PREDICTIVE REGULATION OF A BUILDING ENERGY SYSTEM
Latest bibliographic data on file with the International Bureau   

Pub. No.:    WO/2007/096377    International Application No.:    PCT/EP2007/051654
Publication Date: 30.08.2007 International Filing Date: 21.02.2007
IPC:
G05B 13/04 (2006.01), F02G 5/00 (2006.01), F02C 6/18 (2006.01)
Applicants: SIEMENS AKTIENGESELLSCHAFT [DE/DE]; Wittelsbacherplatz 2, 80333 München (DE) (For All Designated States Except US).
GWERDER, Markus [CH/CH]; (CH) (For US Only).
GÄHLER, Conrad [CH/CH]; (CH) (For US Only).
LAUBACHER, Nina [DE/CH]; (CH) (For US Only).
TÖDTLI, Jürg [CH/CH]; (CH) (For US Only)
Inventors: GWERDER, Markus; (CH).
GÄHLER, Conrad; (CH).
LAUBACHER, Nina; (CH).
TÖDTLI, Jürg; (CH)
Common
Representative:
SIEMENS AKTIENGESELLSCHAFT; Postfach 22 16 34, 80506 München (DE)
Priority Data:
10 2006 008 722.4 24.02.2006 DE
Title (DE) MODELLBASIERTE PRÄDIKTIVE REGELUNG EINER GEBÄUDE-ENERGIEANLAGE
(EN) MODEL-BASED PREDICTIVE REGULATION OF A BUILDING ENERGY SYSTEM
(FR) Régulation prédictive à base de modèle d'une installation de distribution d'énergie d'un bâtiment
Abstract: front page image
(DE)In einem Verfahren zur Prädiktiven Steuerung und/oder Regelung einer wenigstens, ein Kraft-Wärmekopplungs-Gerät (1) aufweisenden Energieanlage eines Gebäudes werden Leitsignale für ein dem Kraft-Wärmekopplungs-Gerät (1) zugeordnetes Steuer- und Regelgerät (2) durch eine dem Steuer- und Regelgerät übergeordnete Steuer- und Regeleinrichtung (20) generiert, wobei zur Generierung der Leitsignale ein Modell (21) des thermischen und energetischen Verhaltens des Gebäudes und der Energieanlage sowie deren Benutzer verwendet wird, und eine Optimierung über einen gleitenden Zeithorizont durchgeführt wird. Ein Kriterium für die Optimierung ist nach aktuellen Bedürfnissen des Betreibers der Energieanlage wählbar. Das Kriterium der Optimierung ist beispielsweise ein Indikator für den Primärenergieverbrauch der Energieanlage oder aber ein Mass für den von der Energieanlage produzierten Kohlendioxid-Ausstoss.
(EN)In a method for the predictive control and/or regulation of a building energy system having at least one combined heat and power unit (1), control signals for a control and regulation unit (2) which is associated with the combined heat and power unit (1) are generated by a control and regulation device (20) which is superordinate to the control and regulation unit, wherein a model (21) of the thermal and energy behaviour of the building and the energy system as well as the users of the latter is used to generate the control signals and optimization is carried out using a sliding time horizon. One optimization criterion can be selected according to the current needs of the operator of the energy system. The optimization criterion is, for example, an indicator of the primary energy consumption of the energy system or else a measure of the carbon dioxide emission produced by the energy system.
(FR)L'invention concerne un procédé de commande et/ou de régulation prédictive d'une installation de distribution d'énergie d'un bâtiment présentant au moins un appareil (1) de production combinée de chaleur et d'électricité, selon lequel des signaux de commande pour un appareil de commande/régulation (2) associé à l'appareil (1) de production combinée de chaleur et d'électricité sont générés par un dispositif (20) de commande et de régulation supervisant l'appareil de commande/régulation, un modèle (21) du comportement thermique et énergétique du bâtiment et de l'installation de distribution d'énergie ainsi que de ces utilisateurs étant utilisé pour générer les signaux de commande et une optimisation étant effectuée sur un horizon temporel glissant. Un critère d'optimisation peut être sélectionné en fonction des besoins actuels de l'exploitant de l'installation de distribution d'énergie. Le critère d'optimisation est, par exemple, un indicateur de la consommation d'énergie primaire de l'installation de distribution d'énergie ou encore une masse des émissions de dioxyde de carbone produites par l'installation de distribution d'énergie.
Designated States: AE, AG, AL, AM, AT, AU, AZ, BA, BB, BG, BR, BW, BY, BZ, CA, CH, CN, CO, CR, CU, CZ, DE, DK, DM, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IS, JP, KE, KG, KM, KN, KP, KR, KZ, LA, LC, LK, LR, LS, LT, LU, LV, LY, MA, MD, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PG, PH, PL, PT, RO, RS, RU, SC, SD, SE, SG, SK, SL, SM, SV, SY, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW.
African Regional Intellectual Property Organization (BW, GH, GM, KE, LS, MW, MZ, NA, SD, SL, SZ, TZ, UG, ZM, ZW)
Eurasian Patent Organization (AM, AZ, BY, KG, KZ, MD, RU, TJ, TM)
European Patent Office (AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR)
African Intellectual Property Organization (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, ML, MR, NE, SN, TD, TG).
Publication Language: German (DE)
Filing Language: German (DE)