1. WO2000032906 - SARDINE-BONE CONSTRUCTION METHOD FOR LARGE-SECTION TUNNEL

Publication Number WO/2000/032906
Publication Date 08.06.2000
International Application No. PCT/JP1999/006397
International Filing Date 16.11.1999
Chapter 2 Demand Filed 16.11.1999
IPC
E21D 9/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
9Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
E21D 9/04 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
9Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
E21D 11/00 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
11Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
E21D 11/10 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
11Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
04Lining with building materials
10with concrete cast in situ; Shuttering or other equipment adapted therefor
CPC
E21D 11/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
11Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
E21D 11/10
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
11Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
04Lining with building materials
10with concrete cast in situ; Shuttering ; also lost shutterings, e.g. made of blocks, of metal plates; or other equipment adapted therefor
E21D 11/105
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
11Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
04Lining with building materials
10with concrete cast in situ; Shuttering ; also lost shutterings, e.g. made of blocks, of metal plates; or other equipment adapted therefor
105Transport or application of concrete specially adapted for the lining of tunnels or galleries
E21D 9/00
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
9Tunnels or galleries, with or without linings; Methods or apparatus for making thereof
E21D 9/04
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
9Tunnels or galleries, with or without linings; Methods or apparatus for making thereof
04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
Applicants
  • NAGATOMO, Shigeki [JP]/[JP]
  • FUJIMOTO, Hideo [JP]/[JP] (UsOnly)
  • KAJI, Shigehito [JP]/[JP] (UsOnly)
  • TAKEUCHI, Hideki [JP]/[JP] (UsOnly)
  • MITARASHI, Yoshio [JP]/[JP] (UsOnly)
  • OHTSU, Sohki [JP]/[JP] (UsOnly)
  • TAKEBAYASHI, Tsuguo [JP]/[JP] (UsOnly)
  • OCHIAI, Masakazu [JP]/[JP] (UsOnly)
  • YAMAMOTO, Takefumi [JP]/[JP] (UsOnly)
  • KINOSHITA, Yoshitomo [JP]/[JP] (UsOnly)
Inventors
  • NAGATOMO, Shigeki
  • FUJIMOTO, Hideo
  • KAJI, Shigehito
  • TAKEUCHI, Hideki
  • MITARASHI, Yoshio
  • OHTSU, Sohki
  • TAKEBAYASHI, Tsuguo
  • OCHIAI, Masakazu
  • YAMAMOTO, Takefumi
  • KINOSHITA, Yoshitomo
Agents
  • MORI, Tetsuya
Priority Data
10/33802327.11.1998JP
Publication Language Japanese (JA)
Filing Language Japanese (JA)
Designated States
Title
(EN) SARDINE-BONE CONSTRUCTION METHOD FOR LARGE-SECTION TUNNEL
(FR) PROCEDE DE CONSTRUCTION EN ARETE DE SARDINE POUR TUNNEL DE GRANDE SECTION
Abstract
(EN)
A method of boring a large-section tunnel safely and quickly by reinforcing and improving in advance the ground over the full length of the tunnel section, wherein a top drift (2) is bored through the full length of the tunnel (1) section, then curved holes are drilled at preset intervals from the top drift (2) along the peripheral edges of the sections of the tunnel (1) by using rock drills and curved steel pipes (3), the steel pipes (3) are pulled off after injection pipes are inserted into the drilled holes, grout is injected into the ground surrounding the tunnel through the injection pipes to develop artificial ground arches (4), then the tunnel (1) is excavated, suspension forms (6) are advanced and concrete is placed for secondary lining, whereby the tunnel is bored.
(FR)
L'invention concerne un procédé permettant de forer de manière sûre et rapide un tunnel de grande section par renforcement du sol et amélioration de la progression sur toute la longueur de la section de tunnel. On fore une galerie supérieure (2) sur toute la longueur de la section de tunnel (1), puis on fore des trous en courbe à des intervalles déterminés de la galerie supérieure (2) le long des bords périphériques des sections du tunnel (1) à l'aide d'une perforatrice et de tuyaux en acier (3) courbes, lesdits tuyaux en acier étant retirés une fois que les tuyaux d'injection sont introduits dans les trous forés, on injecte du lait de ciment dans le sol autour du tunnel, par l'intermédiaire des tuyaux d'injection afin de produire des arches (4) de sol artificielles, puis on creuse le tunnel (1), on forme des parties suspendues (6) et on y place du béton afin de produire un revêtement secondaire, puis on creuse le tunnel.
Latest bibliographic data on file with the International Bureau