WIPO logo
Mobile | Deutsch | Español | Français | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Search International and National Patent Collections
World Intellectual Property Organization
Search
 
Browse
 
Translate
 
Options
 
News
 
Login
 
Help
 
Machine translation
1. (WO2000027693) DECK INSTALLATION SYSTEM FOR OFFSHORE STRUCTURES
Latest bibliographic data on file with the International Bureau   

Pub. No.:    WO/2000/027693    International Application No.:    PCT/US1999/022719
Publication Date: 18.05.2000 International Filing Date: 30.09.1999
Chapter 2 Demand Filed:    24.05.2000    
IPC:
B63B 9/06 (2006.01), E02B 17/00 (2006.01)
Applicants: EXXONMOBIL UPSTREAM RESEARCH COMPANY [US/US]; 3120 Buffalo Speedway P.O. Box 2189 Houston, TX 77252-2189 (US)
Inventors: DAVENPORT, George, F., III; (US).
RUNGE, Karl, H.; (US).
MURFF, J., Don; (US)
Agent: CASAMASSIMA, Salvatore, J.; Exxon Production Research Company P.O. Box 2189 Houston, TX 77252-2189 (US)
Priority Data:
60/107,316 06.11.1998 US
09/409,044 29.09.1999 US
Title (EN) DECK INSTALLATION SYSTEM FOR OFFSHORE STRUCTURES
(FR) SYSTEME D'INSTALLATION DE PONTS POUR STRUCTURE OFFSHORE
Abstract: front page image
(EN)An apparatus and method for installing a deck (3) on an offshore substructure (15) is provided. The apparatus comprises a deck supported by lifting mechanisms (6) compressed until transported to an offshore substructure having an upper end (16) located above the water surface. The lifting mechanisms are then extended and the apparatus moved on the surface of the water to position the deck over the substructure. The deck is then lowered onto the substructure and the pontoons are lifted out of the water.
(FR)L'invention porte sur un appareil et un procédé d'installation d'un pont (3) sur une substructure (15) offshore comportant un pont porté par des mécanismes (6) de levage comprimés lors de leur transport jusqu'à une substructure dont la tête (16) émerge. Les mécanismes de levage sont ensuite déployés et l'appareil de déplace à la surface de l'eau pour positionner le pont sur la substructure. On abaisse alors le pont sur la substructure puis les pontons sont retirés de l'eau.
Designated States: Eurasian Patent Organization (AM, AZ, BY, KG, KZ, MD, RU, TJ, TM)
European Patent Office (AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LU, MC, NL, PT, SE).
Publication Language: English (EN)
Filing Language: English (EN)