Processing

Please wait...

Settings

Settings

Goto Application

1. WO1997047855 - METHOD AND EQUIPMENT FOR OFFSHORE OIL PRODUCTION WITH PRIMARY GAS SEPARATION AND FLOW USING THE INJECTION OF HIGH PRESSURE GAS

Publication Number WO/1997/047855
Publication Date 18.12.1997
International Application No. PCT/GB1997/001200
International Filing Date 01.05.1997
Chapter 2 Demand Filed 05.01.1998
IPC
E21B 43/01 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
01specially adapted for obtaining from underwater installations
E21B 43/12 2006.01
EFIXED CONSTRUCTIONS
21EARTH OR ROCK DRILLING; MINING
BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
CPC
E21B 43/01
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
01specially adapted for obtaining from underwater installations
E21B 43/121
EFIXED CONSTRUCTIONS
21EARTH DRILLING; MINING
BEARTH DRILLING, e.g. DEEP DRILLING
43Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
121Lifting well fluids
Applicants
  • PETRÓLEO BRASILEIRO S.A. - PETROBRAS [BR]/[BR] (AllExceptUS)
  • LIMA, Paulo, César, Ribeiro [BR]/[GB] (UsOnly)
Inventors
  • LIMA, Paulo, César, Ribeiro
Agents
  • BARLOW, Roy, James
Priority Data
PI 9602746-012.06.1996BR
Publication Language English (EN)
Filing Language English (EN)
Designated States
Title
(EN) METHOD AND EQUIPMENT FOR OFFSHORE OIL PRODUCTION WITH PRIMARY GAS SEPARATION AND FLOW USING THE INJECTION OF HIGH PRESSURE GAS
(FR) EQUIPEMENT ET PROCEDE DE PRODUCTION PETROLIERE EN MER AVEC ECOULEMENT ET SEPARATION PRIMAIRE DU GAZ PAR INJECTION D'UN GAZ HAUTE PRESSION
Abstract
(EN)
A subsea primary separating vessel (2, 22) is installed close to the wellhead (1, 31) of an oil producing well to effect primary separation of the liquid and gas phases of the fluids produced. A line (3, 23) connected to the top of the separating vessel allows separated gas to flow to a gathering vessel (8, 28) located at any gathering centre. At least one flow line (4, 5, 24) connects the lower part of the separating vessel to a vessel (9, 29) located at any gathering centre. When the volume of liquid phase which separates out within the at least one flow line begins to exert a back pressure which adversely affects production from the well, high pressure gas can be injected into the flow line(s) for a specific period of time in order to promote the flow of liquid gas to the vessel (9, 29). If it is desired that flow efficiency should be increased, a mechanical interface driven by the high pressure gas may be used to encourage flow of the liquid phase.
(FR)
L'invention concerne un réservoir de séparation primaire sous-marin (2, 22) installé à proximité d'une tête (1, 31) de puits pétrolifère et destiné à effectuer la séparation primaire des phases liquide et gazeuse des fluides obtenus. Une conduite (3, 23), raccordée à la partie supérieure du réservoir de séparation, permet l'écoulement des gaz séparés vers une cuve de récupération (8, 28) placée au niveau d'une station collectrice quelconque. Au moins une conduite d'écoulement (4, 5, 24) raccorde la partie inférieure du réservoir de séparation à un réservoir (9, 29) situé au niveau d'un centre collecteur. Lorsque le volume de la phase liquide qui se sépare dans au moins une conduite d'écoulement commence à exercer une contre-pression ayant des effets préjudiciables sur la production pétrolière, un gaz haute pression peut être injecté dans la (les) conduite(s) d'écoulement sur une durée déterminée afin de faciliter l'écoulement d'une phase liquide vers le réservoir d'équilibre (9, 29). Si on désire augmenter le débit de l'écoulement, une interface mécanique commandée par le gaz haute pression peut être utilisée pour faciliter l'écoulement de la phase liquide.
Also published as
GB9821560.1
Latest bibliographic data on file with the International Bureau