WIPO logo
Mobile | Deutsch | Español | Français | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Search International and National Patent Collections
World Intellectual Property Organization
Search
 
Browse
 
Translate
 
Options
 
News
 
Login
 
Help
 
Machine translation
1. (WO1981002443) PROCESS FOR THE GENERATION OF ELECTRIC POWER DURING PERIODS OF PEAK POWER DEMAND
Latest bibliographic data on file with the International Bureau   

Pub. No.:    WO/1981/002443    International Application No.:    PCT/US1981/000226
Publication Date: 03.09.1981 International Filing Date: 25.02.1981
IPC:
F01K 21/04 (2006.01), F02C 6/16 (2006.01)
Applicants:
Inventors:
Priority Data:
125239 27.02.1980 US
Title (EN) PROCESS FOR THE GENERATION OF ELECTRIC POWER DURING PERIODS OF PEAK POWER DEMAND
(FR) PROCEDE DE PRODUCTION DE COURANT ELECTRIQUE PENDANT DES PERIODES DE POINTE DE DEMANDE D'ENERGIE
Abstract: front page image
(EN)The object of the invention is to provide electric power during periods of peak demand, employing a turbine generator facility (60-61) activated by the expansion of compressed air, withdrawn from an underground air storage reservoir (90), in a substantially isothermal system. A generator system, which may comprise a steam boiler (40) or a fuel gasifier (140), is employed for isothermal compression of air into reservoir storage during periods of low power demand.
(FR)Pour satisfaire la demande en energie electrique pendant les periodes de pointe, on utilise une unite a turbine generatrice (60-61) actionnee par la detente d'air comprime, aspire depuis un reservoir de stockage d'air souterrain (90), dans un systeme sensiblement isothermique. Un systeme generateur, qui peut comprendre une chaudiere a vapeur (40) ou un gazeificateur de combustible (140), est utilise pour la compression isothermique d'air dans un reservoir de stockage pendant des periodes de faible demande en energie.
Designated States:
Publication Language: English (EN)
Filing Language: English (EN)