WIPO logo
Mobile | Deutsch | Español | Français | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Search International and National Patent Collections
World Intellectual Property Organization
Search
 
Browse
 
Translate
 
Options
 
News
 
Login
 
Help
 
Machine translation
1. (WO1981002175) PROCEDURE TO RAISE A BUILDING AND AN ARRANGEMENT CARRYING OUT THE PROCEDURE
Latest bibliographic data on file with the International Bureau   

Pub. No.:    WO/1981/002175    International Application No.:    PCT/SE1981/000019
Publication Date: 06.08.1981 International Filing Date: 26.01.1981
IPC:
E04B 1/24 (2006.01), E04B 1/76 (2006.01), E04B 7/02 (2006.01)
Applicants:
Inventors:
Priority Data:
8000599 25.01.1980 SE
Title (EN) PROCEDURE TO RAISE A BUILDING AND AN ARRANGEMENT CARRYING OUT THE PROCEDURE
(FR) PROCEDE DE CONSTRUCTION D"UN BATIMENT ET INSTALLATION POUR LA MISE EN OEUVRE DU PROCEDE
Abstract: front page image
(EN)Procedure to produce a building with well insulating capacity. The building is raised on a base (2) and comprises a frame (1) including wall studs (3) of metal, preferably consisting of steel profiles and wall panels (4), which are arranged between the wall studs and made of plastic material having well insulating properties against heat and cold, whereby the plastic material preferably consists of foam plastic, as polyurethane. On the frame (1) is arranged a system of joists made of corresponding material and whenever further wall panels for a first floor and roof trusses and roof. The wall panels (4) surround the wall studs (3) and the wall panels indicate the necessary thickness of the wall and form the necessary insulating capacity, as well as the arranged system of joists. The wall studs (3) are anchored to the base (2) and are surrounded by the wall panels in their full length. The walls raised in said manner are arranged to enclose one or more rooms, which are covered with system of joists shaped as panels. Roof trusses are arranged on the wall studs or to the system of joists. The system of joists are resting on the frame and are held to the frame by locking devices (16, 28 or 77, 78) and thereby rigid the frame. Instead the frame is rigided by bolted connecting rods (87, 89) arranged in the roof trusses or in the system of joists.
(FR)Procede de construction d"un batiment possedant de bonnes caracteristiques d"isolation. Le batiment est construit sur une base (2) et se compose d"un cadre (1) comprenant des montants (3) de paroi metalliques, composes de preference de profiles d"acier, et de panneaux de paroi (4), disposes entre les montants de paroi et fabriques en un materiau plastique possedant de bonnes caracteristiques d"isolation contre la chaleur et le froid, le materiau plastique etant compose de preference de mousse plastique, telle que du polyurethane. Sur le cadre (1) est dispose un systeme de solives fabrique en un materiau correspondant et eventuellement d"autres panneaux de paroi pour la construction d"un premier etage, une charpente et une toiture. Le panneaux de paroi (4) entourent les montants de paroi (3) et panneaux de paroi indiquent l"epaisseur necessaire de la paroi et forment la capacite d"isolation necessaire, ainsi que le systeme de solives. Les montants de paroi (3) sont ancrees a la base (2) et sont entourees par les panneaux de paroi sur toute leur longueur. Les parois elevees de cette facon sont disposees de maniere a definir une ou plusieurs salles, qui sont couvertes avec un systeme de solives en forme de panneau. Une charpente est disposee sur les montants de paroi ou sur le systeme de solives. Le systeme de solives repose sur le cadre et est accroche a celui-ci par des dispositifs de blocage (16, 28) ou (77, 78) ce qui permet de rigidifier le cadre. Le cadre peut aussi etre rigidifie par des barres de connexion boulonnees (87, 89) disposees dans la charpente ou dans le systeme de solives.
Designated States:
Publication Language: English (EN)
Filing Language: English (EN)