WIPO logo
Mobile | Deutsch | Español | Français | 日本語 | 한국어 | Português | Русский | 中文 | العربية |
PATENTSCOPE

Search International and National Patent Collections
World Intellectual Property Organization
Search
 
Browse
 
Translate
 
Options
 
News
 
Login
 
Help
 
Machine translation
1. (WO1980001581) PROCEDURE AND ARRANGEMENT FOR LAYING THE FOUNDATION OF PREFABRICATED PLANTS ASHORE
Latest bibliographic data on file with the International Bureau   

Pub. No.:    WO/1980/001581    International Application No.:    PCT/SE1980/000022
Publication Date: 07.08.1980 International Filing Date: 24.01.1980
IPC:
E02B 17/00 (2006.01), E02D 23/02 (2006.01), E04H 3/08 (2006.01), E04H 5/02 (2006.01)
Applicants:
Inventors:
Priority Data:
7900955 05.02.1979 SE
Title (EN) PROCEDURE AND ARRANGEMENT FOR LAYING THE FOUNDATION OF PREFABRICATED PLANTS ASHORE
(FR) PROCEDE ET DISPOSITIF D"ASSISE DES FONDATIONS D"USINES PREFABRIQUEES SUR LA COTE
Abstract: front page image
(EN)Procedure and arrangement for laying the foundation of prefabricated plants (7) comprising such types as processing plants, industrial buildings, hospitals, hotels, etc., and for their removal, assembly and foundation building at the place of destination (10) ashore. Foundations (4) are made ashore or in a dry dock or on a barge, after which the processing plant is assembled. If the foundation is manufactured outside the barge (1), the plant (7) and/or foundation (4) can be moved to transport barges (1). Transport to the place of destination is carried out by means of sea-going transport barges (1). At the place of destination (9) the transport barges (1) are lowered onto an erection bed (2), and the plant (7) is launched over prefabricated sliding supports (5) from transport barge to the definitive erection site (10), which can advantageously be situated above the water level in the vicinity of the beach (9) or ashore.
(FR)Procede et dispositif d"assise des fondations d"usines prefabriquees (7) telles que des usines de traitement, des locaux industriels, des hopitaux, des hotels, etc, et pour leur deplacement assemblage et fondation a l"endroit de destination (10) sur la cote. Les fondations (4) sont faites sur la cote ou dans un bassin de radoub ou sur une barge, apres quoi l"installation ou unite de traitement est assemblee. Si la fondation est fabriquee a l"exterieur de la barge (1), l"installation ou complexe (7) et/ou la fondation (4) peuvent etre deplacees vers des barges de transport (1). Le transport vers le point de destination s"effectue au moyen de peniches de transport (1). Au point de destination (9), les peniches de transport (1) sont abaissees sur un lit de levage (2), et l"installation ou complexe (7) est lancee sur des supports de glissement prefabriques (5) depuis la peniche transport jusqu"au site d"etablissement definitif (10) qui peut etre situe de maniere avantageuse au dessus du niveau de l"eau a proximite de la plage (9) ou sur la cote.
Designated States:
Publication Language: English (EN)
Filing Language: English (EN)