1. IN5245/DELNP/2006 - "METHOD OF BUILDING A DIRECT SMELTING PLANT"

Office India
Application Number 5245/DELNP/2006
Application Date 11.09.2006
Publication Number 5245/DELNP/2006
Publication Date 03.08.2007
Publication Kind A
IPC
E04G 21/00
EFIXED CONSTRUCTIONS
04BUILDING
GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
21Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Applicants TECHNOLOGICAL RESOURCE PTY LIMITED
Inventors IONS PHILIP JAMES
Priority Data 2004901418 17.03.2004 AU
Title
(EN) "METHOD OF BUILDING A DIRECT SMELTING PLANT"
Abstract
(EN)
Method of building a direct smelting plant comprising a metal smelting vessel (11) and ancillary plant components such as the components of a hot air supply station (24), an offgas treatment station (32), a solids feed station (41), a hot metal desulphurizatin station (47) and hot metal and slag launders extending from the smelting vessel (11). The ring track (53) of a ringer crane(51) is installed in front of location at which vessel (11) is to be installed. Crane boom (54) islaid out along elongate stretch of the building site which becomes a corridor (60) between majorancillary components when plant is fully erected. Boom (54) is connected to crane carriage(52) and hoisted to provide high lift capacity over a ground area embracing proposed site ofvessel (11) and ancillary components. Prefabricated components are then lifted by crane (51)into appropriate position for final installation. After installation is completed boom (54) is laiddown along corridor (60) and crane (51) is dismantled and removed, leaving corridor (60) as anaccess laneway.